18.11.2014 Views

Santa Clara River Trail Final Master Plan - Development Services ...

Santa Clara River Trail Final Master Plan - Development Services ...

Santa Clara River Trail Final Master Plan - Development Services ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Chapter 1: Existing Conditions<br />

<br />

<br />

<br />

The cogeneration facility located adjacent to the project site has been converted into a<br />

maintenance building for the golf course. Maintenance staff will need vehicular access from N.<br />

Victoria Avenue along the proposed segment from 5:30-6:30 am and from 1:00-3:00 pm daily.<br />

Vineyard-Ventura residential development is a new 35 acre project proposed to be adjacent to<br />

the flood control levee on the northwest corner of W. Vineyard Avenue and N. Ventura Road.<br />

The <strong>Santa</strong> <strong>Clara</strong> riverbed is home to several homeless encampments. The area around N. Victoria<br />

Avenue is a popular spot for the homeless because the road bridge provides a connection<br />

between the Cities of Oxnard and Ventura.<br />

SBP/LEVEE CONDITIONS<br />

The western segment of the project site extends approximately 1.5 miles east from N. Victoria<br />

Avenue along a flood control levee and access road known as Southbank Road.<br />

<br />

<br />

<br />

This existing levee and access road terminates approximately 2,000 feet west of Highway 101 at a<br />

flood control access gate off of N. Ventura Road.<br />

A Ventura County Watershed Protection District (VCWPD) SBP facility is adjacent to the <strong>River</strong><br />

Ridge Golf Course.<br />

Adjacent to the Vineyard-Ventura residential development property there is a VCWPD levee<br />

with groins for added flood protection.<br />

The width of the SBP facility ranges between 25’ and 40’.<br />

<br />

<br />

<br />

<br />

A methane gas recovery pipeline runs above ground along the SBP facility on golf course<br />

property.<br />

The SBP facility is bisected by a methane gas recovery pipeline which runs down the middle of<br />

the facility.<br />

Four protruding methane gas extraction wells<br />

are located at regular intervals along the gas<br />

line.<br />

Clearance of approximately 20’ from the top of<br />

the SBP facility to the underside of the Victoria<br />

Avenue Bridge.<br />

CIRCULATION<br />

A VCWPD gated access ramp leads to the levee<br />

at N. Ventura Road and to the north-bound<br />

side of N. Victoria Avenue as well.<br />

Segment 1 views are dominated by riparian<br />

habitat.<br />

<br />

Connection points to the trail within the segment are limited.<br />

14 | Alta <strong>Plan</strong>ning + Design

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!