18.11.2014 Views

Santa Clara River Trail Final Master Plan - Development Services ...

Santa Clara River Trail Final Master Plan - Development Services ...

Santa Clara River Trail Final Master Plan - Development Services ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Chapter 1: Existing Conditions<br />

Segment Analysis<br />

<strong>Santa</strong> <strong>Clara</strong> <strong>River</strong> <strong>Trail</strong> Segments<br />

Segment 1: The western segment of the project site extends approximately 1.5 miles east from N. Victoria<br />

Avenue to approximately 2,000 feet west of Highway 101 at a flood control access gate off of N. Ventura<br />

Road.<br />

Segment 2: The middle segment extends from the flood control access gate at the junction of Southbank<br />

Road with N. Ventura Road to the east side of Highway 101.<br />

Segment 3: The eastern segment extends east of Highway 101 for almost 2 miles to Central Avenue.<br />

Segment 4: Segment four parallels N. Victoria Avenue from the levee to W. Gonzales Road<br />

Segment 5: The <strong>River</strong> Ridge Golf Course (golf course) segment follows an asphalt Ventura Regional<br />

Sanitation District (VRSD) access road that goes south and east ultimately connecting to N. Patterson<br />

Road at the intersection of Patterson and Vineyard Ave (this Segment was not chosen for the final<br />

alignment).<br />

12 | Alta <strong>Plan</strong>ning + Design

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!