Santa Clara River Trail Final Master Plan - Development Services ...
Santa Clara River Trail Final Master Plan - Development Services ...
Santa Clara River Trail Final Master Plan - Development Services ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Santa</strong> <strong>Clara</strong> <strong>River</strong> <strong>Trail</strong> <strong>Plan</strong><br />
25<br />
Miscellaneous Minor Drainage Structures<br />
(field inlets, culvert Headwall, etc)<br />
1 LS $20,000.00 $ 20,000.00<br />
26 Slough Walls/Low Retaining walls 1000 LF $100.00 $ 100,000.00<br />
27<br />
Channel Crossing - Pedestrian/Bicycle<br />
Bridge - Grade transition<br />
1 LS $50,000.00 $ 50,000.00<br />
28 Provide and Install Benches 0 EA $2,500.00 $ -<br />
29 Landscape and Irrigation Improvements 1 LS $2,500.00 $ 2,500.00<br />
30 Provide and Install Directional, Etiquette,<br />
Regulatory and Warning Signs 4 EA $250.00 $ 1,000.00<br />
31 Provide and Install Wayfinding Signs 2 EA $750.00 $ 1,500.00<br />
32 Provide and Install Interpretive Signs 0 EA $5,000.00 $ -<br />
33 Construct Entry Monument Structure 1 LS $10,000.00 $ 10,000.00<br />
34 Provide and Install Trash Receptacles 2 EA $1,800.00 $ 3,600.00<br />
35 Provide and Install Lighting 0 EA $5,000.00 $ -<br />
36 Provide and Install Bike Racks 0 EA $1,500.00 $ -<br />
37 Provide and Install Drinking Fountain 0 EA $5,000.00 $ -<br />
38 Provide and Install Conduit for Surveillance<br />
Cameras<br />
39 Provide and Install Camera and Video<br />
Surveillance System<br />
0 LF $25.00<br />
0 EA $2,500.00<br />
$ -<br />
$ -<br />
40 Provide and Install Police Call Box 0 EA $6,000.00 $ -<br />
Sub-Total = $ 1,150,075.00<br />
20% Design, Engineering, Environmental and Permitting = $ 230,015.00<br />
20% Contingency = $ 230,015.00<br />
$ 1,610,105.00<br />
City of Oxnard | 105