18.11.2014 Views

Santa Clara River Trail Final Master Plan - Development Services ...

Santa Clara River Trail Final Master Plan - Development Services ...

Santa Clara River Trail Final Master Plan - Development Services ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Chapter 7: Project Implementation <strong>Plan</strong><br />

Table 16: Concept Estimate, Segment 4<br />

Concept Estimate <strong>Santa</strong> <strong>Clara</strong> <strong>River</strong> <strong>Trail</strong> Segment 4<br />

Along Victoria Avenue from Gonzales Road to <strong>Santa</strong> <strong>Clara</strong> <strong>River</strong><br />

Concrete Pavement Over Aggregate Base<br />

Bid<br />

Item<br />

Description<br />

Estimated<br />

Quantity Unit Unit Cost Extended Cost<br />

1 Mobilization and Site Requirements 1 LS $51,000.00 $ 51,000.00<br />

2 Implement SWPP/WQMP 1 LS $10,000.00 $ 10,000.00<br />

3 Dust Control 1 LS $5,000.00 $ 5,000.00<br />

4 Erosion Control - MS4 permit 1 LS $10,000.00 $ 10,000.00<br />

5 Clearing and Grubbing 2 Acre $500.00 $ 1,000.00<br />

6 Tree Removal 1 LS $75,000.00 $ 75,000.00<br />

7 Tree Trimming 1 LS $30,000.00 $ 30,000.00<br />

8 Protect Gas Monitoring Wells/Adjust Risers<br />

and Valves to Finish Grade<br />

0 LS $0.00 $ -<br />

9 Rough Grading - Include Surveying 66000 SF $0.65 $ 42,900.00<br />

10 Subgrade Preparation 66000 SF $0.30 $ 19,800.00<br />

11<br />

Construct Portland Cement Concrete<br />

Pavement Over Aggregate Base<br />

66000 SF $8.25 $ 544,500.00<br />

12 Decorative Concrete Pavers 0 LS $0.00 $ -<br />

13 Fine Grade Shoulder 22000 SF $0.50 $ 11,000.00<br />

14 Construct 2' Wide Concrete Traffic Barrier 1 LS $91,000.00 $ 91,000.00<br />

15 Construct Curb and Gutter 0 LF $25.00 $ -<br />

16<br />

Provide and Install Mile Marker/<strong>Trail</strong><br />

Medallions<br />

0<br />

EA $300.00 $ -<br />

17 Pavement Markings and Striping 1 LS $8,300.00 $ 8,300.00<br />

18 Provide and Install Bollards 8 EA $1,500.00 $ 12,000.00<br />

19 Construct Bench Slab 0 EA $500.00 $ -<br />

20 Construct 4-foot Split-Rail Fence 2665 LF $15.00 $ 39,975.00<br />

21<br />

22<br />

Construct 6-foot High Chain Link Fence<br />

(Split face rail)<br />

Construct 4-foot High Ornamental Metal<br />

Fence<br />

0<br />

0<br />

LF $35.00 $ -<br />

LF $65.00 $ -<br />

23 Construct Double Drive Gate 0 EA $6,200.00 $ -<br />

24 Tree Replacement/<strong>Plan</strong>ting 1 LS $10,000.00 $ 10,000.00<br />

104 | Alta <strong>Plan</strong>ning + Design

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!