Chapter 7: Project Implementation <strong>Plan</strong><br />

Table 15: Concept Estimate, Segment 3<br />

Concept Estimate <strong>Santa</strong> <strong>Clara</strong> <strong>River</strong> <strong>Trail</strong> Segment 3<br />

From End of Segment 2 750-feet Easterly of Highway 100 Running Easterly Along the <strong>Santa</strong> <strong>Clara</strong> <strong>River</strong><br />

Levee Road Approximately 2-miles to Central Avenue<br />

Concrete Pavement Over Aggregate Base<br />

Bid<br />

Item<br />

Description<br />

Estimated<br />

Quantity Unit Unit Cost Extended Cost<br />

1 Mobilization and Site Requirements 1 LS $60,000.00 $ 60,000.00<br />

2 Implement SWPP/WQMP 1 LS $12,000.00 $ 12,000.00<br />

3 Dust Control 1 LS $6,000.00 $ 6,000.00<br />

4 Erosion Control - MS4 permit 1 LS $13,000.00 $ 13,000.00<br />

5 Clearing and Grubbing 3.9 Acre $500.00 $ 1,950.00<br />

6 Tree Removal 0 LS $0.00 $ -<br />

7 Tree Trimming 0 LS $0.00 $ -<br />

8 Protect Gas Monitoring Wells/Adjust<br />

Risers and Valves to Finish Grade<br />

0 LS $0.00 $ -<br />

9 Rough Grading - Include Surveying 127000 SF $0.65 $ 82,550.00<br />

10 Subgrade Preparation 127000 SF $0.30 $ 38,100.00<br />

11 Construct Portland Cement Concrete<br />

Pavement Over Aggregate Base<br />

127000 SF $8.25 $ 1,047,750.00<br />

12<br />

Decorative Concrete Pavers (Windrow<br />

Park Gateway)<br />

1 LS $10,000.00<br />

$ 10,000.00<br />

13 Fine Grade Shoulder 42400 SF $0.50 $ 21,200.00<br />

14<br />

Construct 2' Wide Concrete Traffic<br />

Barrier<br />

0 LS $0.00<br />

$ -<br />

15 Construct Curb and Gutter 0 LF $25.00 $ -<br />

16<br />

Provide and Install Mile Marker/<strong>Trail</strong><br />

Medallions<br />

8<br />

EA $300.00 $ 2,400.00<br />

17 Pavement Markings and Striping 1 LS $16,000.00 $ 16,000.00<br />

18 Provide and Install Bollards 4 EA $1,500.00 $ 6,000.00<br />

19 Construct Bench Slab 4 EA $500.00 $ 2,000.00<br />

20 Construct 4-foot Split-Rail Fence 0 LF $15.00 $ -<br />

21 Construct 6-foot High Chain Link Fence 0 LF $35.00 $ -<br />

22<br />

Construct 4-foot High Ornamental Metal<br />

Fence<br />

0<br />

LF $65.00 $ -<br />

23 Construct Double Drive Gate 0 EA $6,200.00 $ -<br />

102 | Alta <strong>Plan</strong>ning + Design