<strong>Santa</strong> <strong>Clara</strong> <strong>River</strong> <strong>Trail</strong> <strong>Plan</strong><br />

(VCWPD) gates at N. Ventura Road approximately 2,000 feet west of Highway 101 (Segment 1). Phase 3<br />

is the most isolated and should be built simultaneously with Phases 1, 2 or 4 or when they are complete<br />

to provide natural surveillance on the trail and minimize vandalism.<br />

Phase 4: Pending SCR-3 Levee System Public Safety Project<br />

Phase 4 is the approximately .5 mile trail segment from the VCWPD access gate at N. Ventura Road to<br />

the east side of Highway 101 (Segment 2). Phase 4 could occur simultaneously with the VCWPD SCR-3<br />

Levee System Public Safety project or at any time thereafter, depending on availability of funding. Special<br />

attention will need to be paid to rerouting trail users during construction of the levee and trail projects to<br />

ensure their safe passage between SCRT segments 1 and 3.<br />

Cost Estimates<br />

The construction costs for the <strong>Santa</strong> <strong>Clara</strong> <strong>River</strong> <strong>Trail</strong> will depend on a number of factors, most<br />

specifically, the final alignment and design of the trail segments. Preliminary estimates for construction<br />

are based on unit costs and estimates needed for grading and paving a 12-foot-wide concrete trail and the<br />

recommended trail amenities. The total estimated cost for the preferred alignment of the <strong>Santa</strong> <strong>Clara</strong><br />

<strong>River</strong> <strong>Trail</strong> is just over $7.1 million in 2011 dollars.<br />

The costs for <strong>Santa</strong> <strong>Clara</strong> <strong>River</strong> <strong>Trail</strong> (see Tables 13 through 16) do not include the potential landfill post<br />

closure amendment, or easement or property acquisition costs for trail development.<br />

Table 12: Concept Estimates Total<br />

Concept Estimate <strong>Santa</strong> <strong>Clara</strong> <strong>River</strong> <strong>Trail</strong> Segment 1 $ 2,692,970.00<br />

Concept Estimate <strong>Santa</strong> <strong>Clara</strong> <strong>River</strong> <strong>Trail</strong> Segment 2 $ 903,714.00<br />

Concept Estimate <strong>Santa</strong> <strong>Clara</strong> <strong>River</strong> <strong>Trail</strong> Segment 3 $ 1,920,870.00<br />

Concept Estimate <strong>Santa</strong> <strong>Clara</strong> <strong>River</strong> <strong>Trail</strong> Segment 4 $ 1,610,105.00<br />

TOTAL $ 7,127,659.00<br />

City of Oxnard | 97