18.11.2014 Views

EOI for Empanelment of Consultants for Preparation of State-wise ...

EOI for Empanelment of Consultants for Preparation of State-wise ...

EOI for Empanelment of Consultants for Preparation of State-wise ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>EOI</strong> <strong>for</strong> <strong>Empanelment</strong> <strong>of</strong> <strong>Consultants</strong> <strong>for</strong> <strong>Preparation</strong> <strong>of</strong> <strong>State</strong>-<strong>wise</strong> Energy Savings Plan / General Consultancy<br />

and <strong>for</strong> <strong>Preparation</strong> <strong>of</strong> Detail Project Reports on Waste Heat Recovery in some Selected Units <strong>of</strong> Small &<br />

Medium Enterprises (SME) Clusters along with Demonstration in a few <strong>of</strong> them<br />

Step 2: Demonstration & Knowledge Dissemination in selective Units<br />

a) Demonstrations in a single unit <strong>for</strong> some clusters may be carried out in each <strong>State</strong>. The units<br />

which have the maximum potential <strong>of</strong> waste heat recovery will be preferred <strong>for</strong><br />

demonstration. Selection <strong>of</strong> ‘Demonstration Unit’ will be done in mutual consultation <strong>of</strong><br />

BEE / SDA / Industry Association the consultant and the unit representative.<br />

b) Develop fabrication / modification <strong>of</strong> the existing structure as per the design scheme. This<br />

may include ducting, channeling, electrical and civil works.<br />

c) Trial run <strong>of</strong> the scheme and measurement <strong>of</strong> all parameters after the implementation.<br />

d) Fine tuning <strong>of</strong> the process parameters after successful utilization <strong>of</strong> the waste heat.<br />

e) Estimation <strong>of</strong> actual saving through standard empirical relations and suggest <strong>for</strong> suitable<br />

monitoring mechanism.<br />

f) <strong>Preparation</strong> <strong>of</strong> the project report with findings at each step <strong>of</strong> the project.<br />

g) Conduct workshop / training programmes to disseminate the findings <strong>of</strong> the successful<br />

demonstration on site. The consultant will also prepare a 2-page leaflet describing the<br />

project activities.<br />

The consultants will be empanelled separately <strong>for</strong> each task. Any interested consultant may apply<br />

<strong>for</strong> carrying out both the tasks or <strong>for</strong> any one <strong>of</strong> the task.<br />

5.0 TIMELINE<br />

The time period <strong>for</strong> preparation <strong>of</strong> <strong>State</strong>-<strong>wise</strong> Energy Savings Plan is approximately six months<br />

from the time <strong>of</strong> starting the task. The time period <strong>for</strong> preparation <strong>of</strong> Detail Project Reports to<br />

explore the potential <strong>of</strong> waste heat recovery in some selected units <strong>of</strong> small & medium<br />

enterprises (SME) clusters along with demonstration in a few <strong>of</strong> them is also approximately one<br />

year from the time <strong>of</strong> starting the task. However, the time period <strong>for</strong> achieving the deliverables <strong>of</strong><br />

both the tasks may vary as per the requirement <strong>of</strong> the <strong>State</strong> Governments.<br />

6.0 SELECTION PROCESS<br />

6.1 Pre-Qualification Criteria <strong>of</strong> <strong>Consultants</strong> / Consortium <strong>of</strong> <strong>Consultants</strong><br />

The Consultant interested in being considered <strong>for</strong> Task 1 must fulfil the following criteria:<br />

Should be a firm/company registered/incorporated in India.<br />

Should have at least 3 BEE Certified Energy Auditors/Energy Managers as on the date <strong>of</strong><br />

applying. A photocopy <strong>of</strong> the certificates <strong>of</strong> BEE Certified Energy Auditors/Energy<br />

Managers should be enclosed as pro<strong>of</strong>.<br />

Page 15

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!