Unichiller in Desktop Housing - HUBER
Unichiller in Desktop Housing - HUBER
Unichiller in Desktop Housing - HUBER
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Start up<br />
General<br />
All models must be moved and <strong>in</strong>stalled <strong>in</strong> an upright position. Provide for a stable<br />
<strong>in</strong>stallation and make sure that the thermostat cannot tilt. Ensure that sufficient fresh<br />
air is available for the circulation pump and compressors at the <strong>in</strong>stallation site. The<br />
warm exhaust air must be able to escape unh<strong>in</strong>dered upwards.<br />
Water-cool<strong>in</strong>g (valid for units with water cool<strong>in</strong>g)<br />
A cool<strong>in</strong>g water controller is used <strong>in</strong> Huber temper<strong>in</strong>g devices with water cool<strong>in</strong>g, <strong>in</strong><br />
order to reduce the cool<strong>in</strong>g water consumption. This only allows as much cool<strong>in</strong>g water<br />
to flow as is required by the current load situation of the temper<strong>in</strong>g device. Only little<br />
cool<strong>in</strong>g water is consumed, if the required refrigerat<strong>in</strong>g capacity is low. No cool<strong>in</strong>g<br />
water flows <strong>in</strong> the OFF state. Only use pressure-resistant hoses <strong>in</strong> the cool<strong>in</strong>g water<br />
circuit.<br />
Connection diagram:<br />
water <strong>in</strong>let water outlet dra<strong>in</strong><strong>in</strong>g / water<br />
Caution!<br />
Depend<strong>in</strong>g upon mode of operation and available cool<strong>in</strong>g water pressure, a cool<strong>in</strong>g<br />
water pressure of > 2 bar can build up <strong>in</strong> the cool<strong>in</strong>g water supply l<strong>in</strong>e. In order to<br />
avoid flood<strong>in</strong>g of the premises, check the leak tightness and quality of the hoses, hose<br />
connections <strong>in</strong> regular <strong>in</strong>tervals, and if necessary take appropriate measures<br />
(Replacement). Close down the cool<strong>in</strong>g water supply to the temper<strong>in</strong>g device even<br />
dur<strong>in</strong>g shorter shutdowns (e.g. over night).<br />
Re<strong>in</strong>forced hoses must be used for <strong>in</strong>creased safety requirements.<br />
Preparation of devices with water-cool<strong>in</strong>g:<br />
Establish the hose connections for the cool<strong>in</strong>g water. The filter screen has to be<br />
<strong>in</strong>serted <strong>in</strong>to the cool<strong>in</strong>g water <strong>in</strong>let. Please <strong>in</strong>fer the position of the cool<strong>in</strong>g water<br />
connections from the connection diagram <strong>in</strong> the appendix. Cool<strong>in</strong>g water connectors<br />
Dra<strong>in</strong>age with seal cap held closed and /or close. Open all stop valves. Please <strong>in</strong>fer the<br />
m<strong>in</strong>imum / maximum differential pressure <strong>in</strong> the cool<strong>in</strong>g water circuit and the<br />
recommended cool<strong>in</strong>g water <strong>in</strong>let temperature from the data sheet.<br />
Information on water quality can be found on our website (www.huber-onl<strong>in</strong>e.com)<br />
under "Download / Safety data sheets thermofluids / Characteristics of water".<br />
19