17.11.2014 Views

SUFFiciENcy EcONOMy ANd GRASSROOtS DEvElOPMENt

SUFFiciENcy EcONOMy ANd GRASSROOtS DEvElOPMENt

SUFFiciENcy EcONOMy ANd GRASSROOtS DEvElOPMENt

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

256<br />

The Meaning of Sufficiency Economy <br />

International Conference<br />

Normative O&M expenses for the first year of the Control period (i.e. FY<br />

2009-10) are Rs. 20.25 Lakh per MW. Normative O&M expenses allowed at the<br />

commencement of the Control Period (i.e. FY 2009-10) is escalated at the rate of<br />

5.72% per annum.<br />

Fuel Mix: The biomass power plant is assumed to be designed in such a way<br />

that it uses different types of non-fossil fuels available within the vicinity of biomass<br />

power project such as crop residues, agro-industrial residues, forest residues etc. and<br />

other biomass fuels. The Biomass Power Generating Companies is simulated to<br />

ensure that the fuel management plan ensures adequate availability of fuel to meet<br />

the respective project capacity requirements.<br />

Biomass fuel price during first year of the Control Period (i.e. FY 2009-10) is<br />

presented in the Table VI below. Alternatively, for each subsequent year of the Tariff<br />

Period, the normative escalation factor of 5% per annum is taken into account.<br />

Table VI: Biomass Fuel Price in different States of India (CERC, 2010)<br />

State<br />

Andhra Pradesh<br />

Haryana<br />

Maharashtra<br />

Madhya Pradesh<br />

Punjab<br />

Rajasthan<br />

Tamil Nadu<br />

Uttar Pradesh<br />

Other States<br />

Biomass Price (Rs/MT)<br />

1301<br />

2168<br />

1801<br />

1299<br />

2092<br />

1822<br />

1823<br />

1518<br />

1797<br />

<br />

For Solar Photovoltaic (PV) power, the simulations are applicable for grid<br />

connected PV systems that directly convert solar energy into electricity and are<br />

based on the technologies such as crystalline silicon or thin film etc. as approved by<br />

Ministry of New and Renewable Energy, Govt. of India.<br />

The normative capital cost for setting up Solar Photovoltaic Power Project is<br />

Rs. 1700Lakh/MW for FY 2009-10. The Capacity utilisation factor for Solar PV<br />

project is nineteen to twenty percent. The O&M Expenses are Rs.9 Lakhs/MW for<br />

the 1st year of operation. Normative O&M expenses allowed at the commencement<br />

of the Control Period to be escalated at the rate of 5.72% per annum.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!