17.11.2014 Views

SUFFiciENcy EcONOMy ANd GRASSROOtS DEvElOPMENt

SUFFiciENcy EcONOMy ANd GRASSROOtS DEvElOPMENt

SUFFiciENcy EcONOMy ANd GRASSROOtS DEvElOPMENt

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

254<br />

The Meaning of Sufficiency Economy <br />

International Conference<br />

Table III: Benchmarks for determining the generation tariff from Wind <br />

(TERI 2006)<br />

Table III: Benchmarks for determining the generation tariff from Wind (TERI 2006)<br />

Table IV: Benchmarks for determining the generation tariff from bio-mass<br />

Table III: Benchmarks for determining (TERI the 2006) generation tariff from Wind (TERI 2006)<br />

Table IV: Benchmarks for determining the generation tariff from bio-mass (TERI 2006)<br />

Table IV: Benchmarks for determining the generation tariff from bio-mass (TERI 2006)<br />

For cost analysis, CERC 2010 report has been considered. The Tariff Period<br />

For cost analysis, CERC 2010 report has been considered. The Tariff Period for Renewable Energy power<br />

projects for Renewable except in case Energy of Small power hydro projects projects below except 5 MW, in case Solar of PV, Small and Solar hydro thermal projects power below projects<br />

is For considered 5 cost MW, analysis, Solar to be CERC PV, thirteen and 2010 Solar (13) report years thermal has been (CERC power considered. 2010). projects In The case Tariff is of considered Solar Period PV for and Renewable to be Solar thirteen thermal Energy (13)<br />

power<br />

projects years except the (CERC Tariff in case Period 2010). of Small is In taken case hydro to of be projects Solar twenty PV below five and years 5 MW, Solar (25) Solar thermal years. PV, (CERC and power Solar 2010) projects thermal Tariff power the period Tariff projects under<br />

these is considered Regulations to be is thirteen considered (13) years from (CERC the date 2010). of commercial In case of operation Solar PV of and the Solar renewable thermal energy power<br />

generating projects<br />

Period<br />

the<br />

is<br />

stations. Tariff<br />

taken<br />

Period<br />

to be<br />

is<br />

twenty<br />

taken to<br />

five<br />

be twenty<br />

years<br />

five<br />

(25)<br />

years<br />

years.<br />

(25)<br />

(CERC<br />

years. (CERC<br />

2010) Tariff<br />

2010) Tariff<br />

period<br />

period<br />

under<br />

under<br />

these these Regulations Regulations is considered is considered from the from date the of commercial date of commercial operation of operation the renewable of the energy<br />

generating renewable stations. energy generating stations.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!