17.11.2014 Views

building a better future - Cemex

building a better future - Cemex

building a better future - Cemex

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

progress towards our targets<br />

Lead in Sustainable Construction<br />

2009 2010 2011<br />

Target<br />

2015 Progress Assurance<br />

Production covered with CEMEX CO2 Footprint Tool (%) 1 NA 60 87 100<br />

Cement NA 100 100 100<br />

Aggregates NA 50 83 100<br />

Ready Mix 1 NA 41 83 100<br />

Enhance our Carbon Strategy<br />

Specific net CO2 emissions (kg CO2/metric ton of cementitious product) 2 627 629 612 594 4<br />

Reduction in CO2 emissions per ton of cementitious product from 1990 baseline (%) 20.7 20.5 22.7 25<br />

Alternative fuels rate (%) 16.4 20.3 24.7 35 4<br />

Excellence in Environmental and Biodiversity Management<br />

Clinker produced with continuous monitoring of major emissions: Dust, NOx and SOx (%) 60 74 80 100 4<br />

Specific dust emissions (g/ton clinker) 2 106 89 101 120 4<br />

Specific NOX emissions (g/tons clinker) 2 1,063 1,134 1,094 1,600 4<br />

Specific SOX emissions (g/ton clinker) 410 334 335 520 4<br />

Active sites with quarry rehabilitation plans (%) 82 85 89 100<br />

Active sites with high biodiversity value where biodiversity action plans are actively<br />

implemented (%)<br />

29 38 38 100<br />

Operations with an Environmental Management System implemented (%) 50 76 86 100<br />

High priority to Health and Safety<br />

Lost-time injury (LTI) frequency rate, employees (per million hours worked) 3.2 2.6 2.3 0.5 4<br />

Compliance with CSI Driving Safety Recommended Practices (%) NA 64 79 100<br />

Compliance with CSI Contractor Safety Recommended Practices (%) NA 63 82 100<br />

Operations with a Safety Management System implemented (%) 98 98 99 100<br />

Operations with a Health Management System implemented (%) 76 79 82 100<br />

Fully achieved target On track to achieve target Extra effort required to achieve target<br />

1. Data recalculated taking into consideration the scope set: fixed and managed plants<br />

2. Target restated setting a more challenging goal<br />

< previous 7 next>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!