17.11.2014 Views

Feasibility Study for the Industrial Area - Part 1 (PDF 5 MB)

Feasibility Study for the Industrial Area - Part 1 (PDF 5 MB)

Feasibility Study for the Industrial Area - Part 1 (PDF 5 MB)

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Walker Riverside<br />

<strong>Feasibility</strong> <strong>Study</strong><br />

Final Report<br />

Colin Buchanan<br />

in association with<br />

Gavin Black and <strong>Part</strong>ners<br />

Wardell Armstrong<br />

Turner and Townsend<br />

June 2005<br />

TRANSPORT TRAFFIC PLANNING DEVELOPMENT URBAN DESIGN ECONOMICS MARKET RESEARCH


WALKER RIVERSIDE FEASIBILTY STUDY<br />

Project No: 91021<br />

June 2005<br />

Newcombe House<br />

45 Notting Hill Gate<br />

London W11 3PB<br />

Telephone: 020 7309 7000<br />

Email : london@cbuchanan.co.uk<br />

Prepared by:<br />

Approved by:<br />

____________________________________________ ____________________________________________<br />

Martina Juvara<br />

Michael Wrigley<br />

Status: final Issue no: 2 Date: 16 June 2005<br />

(C) Copyright Colin Buchanan and <strong>Part</strong>ners Limited. All rights reserved.<br />

This report has been prepared <strong>for</strong> <strong>the</strong> exclusive use of <strong>the</strong> commissioning party and unless o<strong>the</strong>rwise agreed in writing by Colin Buchanan and <strong>Part</strong>ners Limited, no o<strong>the</strong>r party may copy, reproduce, distribute, make use of, or<br />

rely on <strong>the</strong> contents of <strong>the</strong> report. No liability is accepted by Colin Buchanan and <strong>Part</strong>ners Limited <strong>for</strong> any use of this report, o<strong>the</strong>r than <strong>for</strong> <strong>the</strong> purposes <strong>for</strong> which it was originally prepared and provided.<br />

Opinions and in<strong>for</strong>mation provided in this report are on <strong>the</strong> basis of Colin Buchanan and <strong>Part</strong>ners Limited using due skill, care and diligence in <strong>the</strong> preparation of <strong>the</strong> same and no explicit warranty is provided as to <strong>the</strong>ir<br />

accuracy. It should be noted and is expressly stated that no independent verification of any of <strong>the</strong> documents or in<strong>for</strong>mation supplied to Colin Buchanan and <strong>Part</strong>ners Limited has been made.


Section 1: Baseline Audit...............................................................<br />

1.Introduction..................................................................... 3<br />

2.In<strong>for</strong>mation Ga<strong>the</strong>ring and Initial Consultation................ 5<br />

3.Property and Development:<br />

Overview of Current Situation............................................ 9<br />

4.Regeneration Initiatives.................................................15<br />

5.Planning Policy Audit.....................................................19<br />

6.Transport and Movement Audit..................................... 29<br />

7.Urban Design Audit....................................................... 35<br />

8.Baseline Key Issues...................................................... 43<br />

Section 2: Strategic Options..........................................................<br />

9.Economic Strategy......................................................... 51<br />

10.Strategic Options......................................................... 59<br />

Section 3: Project Packages..........................................................<br />

11.Project Packages......................................................... 69<br />

12.Delivery........................................................................ 95<br />

Contents


Section 1<br />

Baseline Audit


Fig. 1.1 - <strong>Study</strong> <strong>Area</strong><br />

N<br />

A&P Tyne<br />

Fisher Street<br />

White Street<br />

Station Rd<br />

N<br />

Shepherd Offshore<br />

Walker Road<br />

Duco<br />

Wellstream<br />

Wincomblee Road<br />

<strong>Study</strong> area boundary<br />

Individual site boundary<br />

2<br />

Colin Buchanan


www.cbuchanan.co.uk<br />

1. Introduction<br />

1.1 The <strong>Study</strong><br />

Newcastle City Council (NCC) Economic Development Division<br />

appointed Colin Buchanan in November 2004 to carry out a<br />

feasibility study <strong>for</strong> a Newcastle industrial area, Walker Riverside.<br />

Specialist consultants have joined Buchanan:<br />

- Wardell Armstrong, <strong>for</strong> desk-top investigation of ground<br />

conditions<br />

- Gavin Black, <strong>for</strong> property advice and financial viability<br />

- Turner and Townsend, <strong>for</strong> project cost analysis<br />

The objectives of <strong>the</strong> overall study were agreed through <strong>the</strong> initial<br />

brief, our response to it and <strong>the</strong> initial project meetings. They are:<br />

- Definition of key parameters and recommendations <strong>for</strong> <strong>the</strong><br />

future of <strong>the</strong> area in relation to <strong>the</strong> current offshore/marine<br />

cluster vision.<br />

- Improvement of <strong>the</strong> interface with <strong>the</strong> adjacent residential<br />

area, taking into account <strong>the</strong> proposals of <strong>the</strong> Places <strong>for</strong><br />

People Walker Riverside Masterplan (2004).<br />

- Revision of access arrangements to <strong>the</strong> area and, in<br />

particular, to some poorly served sites.<br />

- Definition of measures to streng<strong>the</strong>n <strong>the</strong> identity and image<br />

of <strong>the</strong> area and promote local pride.<br />

- Preparation of “packages” of urban design, infrastructure<br />

and property improvements, which will enhance <strong>the</strong><br />

economic prosperity of <strong>the</strong> area.<br />

1.2 The Report<br />

1.2 The <strong>Area</strong><br />

The area covered by <strong>the</strong> study is <strong>the</strong> Newcastle Walker<br />

Riverside, which is <strong>the</strong> 70 hectare industrial area located at <strong>the</strong><br />

eastern boundary of <strong>the</strong> city of Newcastle between <strong>the</strong> Tyne and<br />

Walker Road.<br />

The study area is a narrow strip of land running along <strong>the</strong> river on<br />

a north/south axis and has an overall river frontage of 2.8 km.<br />

There are major differences in level within <strong>the</strong> strip, which in<br />

some cases (Wincomblee Road south) shelter <strong>the</strong> industrial<br />

sites from <strong>the</strong> residential neighbourhoods. In o<strong>the</strong>r cases,<br />

however, steep slopes restrict local access to sites: this is<br />

particularly severe along White Street and east of Fisher Street.<br />

The site is located 10 miles from Newcastle International Airport,<br />

4 miles from Newcastle Central Railway Station, <strong>the</strong> A1(M) and<br />

A19. The ferry terminal to Scandinavia is also a few miles<br />

downstream, at North Shields.<br />

The area is a Strategic Site within Competitive Newcastle, <strong>the</strong> ten<br />

year economic development strategy launched by <strong>the</strong> City<br />

Council in 1999.<br />

Located in <strong>the</strong> area are a cluster of companies active in <strong>the</strong><br />

marine, offshore and engineering sectors. “Anchors” to <strong>the</strong> area<br />

are three companies: Duco and Wellstream (global offshore<br />

manufacturers) and Sheperd Offshore, a marine logistics<br />

company who also manage <strong>the</strong> public deep water quay on behalf<br />

of <strong>the</strong> Council.<br />

A key site is that of A&P Tyne, which was part of <strong>the</strong> North<br />

Tyneside shipbuilding cluster including Swan Hunter and AMEC,<br />

and which has recently closed.<br />

This report is <strong>the</strong> final outcome of <strong>the</strong> study and comprises <strong>the</strong><br />

reports of <strong>the</strong> previous stages of work. Accordingly it is<br />

subdivided in <strong>the</strong> following main sections, which correspond to<br />

<strong>the</strong> study main stages:<br />

- Section 1: Baseline Assessments<br />

- Section 2: Strategic Options<br />

- Section 3: Project Packages<br />

Each section is <strong>the</strong>n subdivided in chapters, according to<br />

different topics.<br />

Associated reports are <strong>the</strong> Ground Condition Report, as part of<br />

Stage 2 of <strong>the</strong> study, produced by Wardell Armstrong, <strong>the</strong> Cost<br />

Estimates <strong>for</strong> <strong>the</strong> project packages (produced by Turner &<br />

Townsend and summarised in Section 3) and a Colin Buchanan<br />

report on <strong>the</strong> feasibility of transferring freight traffic on Fossway,<br />

which in<strong>for</strong>med <strong>the</strong> Strategic Options.<br />

Walker Riverside <strong>Feasibility</strong> <strong>Study</strong> Section 1 - p. 3


4<br />

Colin Buchanan


www.cbuchanan.co.uk<br />

2. In<strong>for</strong>mation<br />

Ga<strong>the</strong>ring and Initial<br />

Consultation<br />

Walker Riverside <strong>Feasibility</strong> <strong>Study</strong><br />

Section 1 - p. 5


2. Consultation Meetings<br />

As part of <strong>the</strong> in<strong>for</strong>mation ga<strong>the</strong>ring stage, a series of meetings<br />

were held with Council officers, local businesses and<br />

organisations active in <strong>the</strong> regeneration of <strong>the</strong> area. A brief<br />

summary of <strong>the</strong> outcomes is included in this section, while <strong>the</strong><br />

body of in<strong>for</strong>mation has been incorporated in <strong>the</strong> relevant audits.<br />

2.1 Council Officers<br />

The following officers from Newcastle City Council had a<br />

continuous input in <strong>the</strong> progress of <strong>the</strong> study:<br />

- Brian Leay – Strategic Property Manager, Economic<br />

Development Division<br />

- Mick Firth - Group Manager (Dev. Planning), Planning and<br />

Transportation Division<br />

- Liz Bray – Landscape and Ecology Officer, Planning and<br />

Transportation Division<br />

- Peter Aviston - <strong>Area</strong> Director (East), Regeneration<br />

Directorate<br />

- Anne Tavernor - Senoir Transportation Officer, Planning &<br />

Transportation Division<br />

- Derek Ord - Highways<br />

- Brian Kingham - Highways<br />

- Bryan Mullan - Highways<br />

A summary of <strong>the</strong> issues from <strong>the</strong> discussions and related to <strong>the</strong><br />

area is provided below.<br />

Port and Employment Issues<br />

Substantial investment in enhancement works to <strong>the</strong> port area<br />

has recently been completed. The port is a strategic resource<br />

which represents one of <strong>the</strong> few facilities in Newcastle (and <strong>the</strong><br />

north east) capable of accommodating substantial port uses.<br />

Within <strong>the</strong> remainder of <strong>the</strong> industrial Walker Riverside <strong>the</strong>re is<br />

opportunity to accommodate additional employment and<br />

business growth. There is also opportunity to facilitate <strong>the</strong><br />

relocation of existing employers in Newcastle to Walker. This<br />

will create new jobs in <strong>the</strong> area, and ensure jobs are retained in<br />

Newcastle. Such development will enable vacated sites to be<br />

redeveloped, ei<strong>the</strong>r as employment or as o<strong>the</strong>r uses.<br />

If parts of <strong>the</strong> Walker Riverside site are developed as B1 (and<br />

also possibly B2 and B8 uses), which are higher value uses, <strong>the</strong>n<br />

<strong>the</strong>re is a danger that traditional marine/ offshore uses will be<br />

gradually pushed out. Policy may, <strong>the</strong>re<strong>for</strong>e, need to protect land<br />

uses. It should be observed that <strong>the</strong> land available with access<br />

to port facilities is limited.<br />

The opportunity <strong>for</strong> non-employment uses on <strong>the</strong> site, such as<br />

leisure or residential, is considered to be limited. Some retail<br />

facilities to serve day to day eating needs could, however, be<br />

accommodated. Public access to <strong>the</strong> water is included in <strong>the</strong><br />

Places <strong>for</strong> People Master Plan (see Chapter 4) but <strong>the</strong>re are<br />

concerns about safety of visitors and <strong>the</strong>creation of spaces that<br />

are difficult to defend and about retention of riverside industrial<br />

activity .<br />

The provision of a new technical or training facility on Walker<br />

Riverside is planned to upskill residents in Walker and elsewhere<br />

in Newcastle and to ensure that any job opportunities could be<br />

accessed by local people. Notably <strong>the</strong>re is a lack, within <strong>the</strong><br />

younger generation, of traditional marine construction and port<br />

skills, related to <strong>the</strong> offshore industry. Such a facility could also<br />

promote inward investment and job creation, if training schemes<br />

can be linked to new (or potential) employer requirements. Also<br />

it is important that training courses should be closely linked to<br />

<strong>the</strong> development strategy <strong>for</strong> <strong>the</strong> area and thus reflect long term<br />

employment aims.<br />

The Interface with <strong>the</strong> Regenerating Neighbourhood<br />

There is support <strong>for</strong> <strong>the</strong> Places <strong>for</strong> People regeneration<br />

programme <strong>for</strong> residential Walker (Draft <strong>for</strong> Consultation January<br />

2004 - see Chapter 4) and <strong>the</strong>re is a need to identify cross<br />

benefits and integration opportunities between <strong>the</strong> industrial area<br />

and <strong>the</strong> neighbourhood.<br />

Some proposals might generate conflicts and need careful<br />

management. These include <strong>the</strong> Cambrian estate redevelopment<br />

(<strong>the</strong> first step in <strong>the</strong> regeneration programme, and thus very<br />

important to create confidence), which could create difficulties <strong>for</strong><br />

heavy traffic movement on Malaya Drive, <strong>the</strong> proposed<br />

“boulevarding” of Station Road/ Walker Road and <strong>the</strong> creation of a<br />

western gateway at <strong>the</strong> nor<strong>the</strong>rn end of Station Road. <strong>Part</strong>icular<br />

consideration needs to be given to <strong>the</strong> future of <strong>the</strong> scrap yards,<br />

which clearly constitute a bad neighbour <strong>for</strong> <strong>the</strong> regenerating<br />

neighbourhood but are never<strong>the</strong>less viable businesses.<br />

There is support <strong>for</strong> <strong>the</strong> concept of a training facility as interface<br />

between <strong>the</strong> residents and <strong>the</strong> employers of <strong>the</strong> industrial estate.<br />

Highways and Transport<br />

The A186 Station Road/Bath Street <strong>for</strong>ms a route of strategic<br />

importance. Any significant downgrading of this route, to a<br />

primarily residential road (as suggested by <strong>the</strong> Places <strong>for</strong> People<br />

Master Plan), would require de-classification from a primary route<br />

and reallocation of <strong>the</strong> designated freight route to Fossway.<br />

The A187 Fossway has less residential frontage than <strong>the</strong> A186<br />

and could <strong>the</strong>oretically carry a higher proportion of HGVs.<br />

However, this has been found to create significant disbenefits to<br />

Fossway and it would, also, be very difficult to discourage HGVs<br />

from using <strong>the</strong> A186 without appropriate physical measures. A<br />

compromise solution is likely to be <strong>the</strong> only viable option. Fur<strong>the</strong>r<br />

investigation of <strong>the</strong> viability of Fossway as a freight route is<br />

provided in a separate report.<br />

Due to a high accident rate, a road safety scheme was<br />

implemented along Walker Road in 2002, including traffic<br />

management measures and improved pedestrian facilities.<br />

There is a need <strong>for</strong> improved linkage between <strong>the</strong> study area and<br />

<strong>the</strong> National Cycle Route 72.<br />

O<strong>the</strong>r Issues<br />

O<strong>the</strong>r issues include <strong>the</strong> need to preserve <strong>the</strong> ecological<br />

resources of <strong>the</strong> industrial estate, <strong>the</strong> potential to fur<strong>the</strong>r exploit<br />

<strong>the</strong> cultural, historic and industrial heritage of <strong>the</strong> area, <strong>the</strong><br />

provision of woodland areas and <strong>the</strong> opportunity to create better<br />

amenities <strong>for</strong> <strong>the</strong> workers. The poor identity of <strong>the</strong> area (including<br />

poor signage, clutter and derelict fencing) was a particular issue<br />

on which <strong>the</strong> Council would like to see improvements.<br />

6<br />

Colin Buchanan


www.cbuchanan.co.uk<br />

2.2 Regeneration and Community<br />

Organisations<br />

Meetings were held with <strong>the</strong> following:<br />

- Anne Mulroy – Places <strong>for</strong> People<br />

- Nicola Woodward – Llewelyn-Davies, project manager of<br />

<strong>the</strong> Places <strong>for</strong> People Master Plan<br />

- Inspector Peter Fay – Northumbria Police, Community<br />

Liaison Officer <strong>for</strong> <strong>the</strong> area<br />

The meetings provided an understanding of <strong>the</strong> regeneration<br />

programme <strong>for</strong> <strong>the</strong> area, both in terms of proposals and in terms<br />

of potential phasing. Key issues of relevance are:<br />

- <strong>the</strong> importance of providing a new environment <strong>for</strong> <strong>the</strong> main<br />

spine through Walker, through <strong>the</strong> densification and<br />

improvement of Walker Road, and <strong>the</strong> consequent<br />

improved management of heavy lorry traffic;<br />

- <strong>the</strong> aspiration <strong>for</strong> radical change in <strong>the</strong> Church Walk area,<br />

with new housing, limited retail and a broad range of mixed<br />

use as interface with <strong>the</strong> industrial area, with limited lorry<br />

traffic (currently mainly generated by <strong>the</strong> scrap yards and<br />

Territorial Army);<br />

- <strong>the</strong> changes in <strong>the</strong> educational facilities in <strong>the</strong> area and<br />

<strong>the</strong> desire <strong>for</strong> a training facility in ship building and marine<br />

engineering , possibly on Neptune Yard.<br />

Jointly with <strong>the</strong> Pathfinder Programme, a Community Safety<br />

Team was set up in October 2004 and a strategy <strong>for</strong> crime<br />

prevention is being prepared. However, overall crime levels in <strong>the</strong><br />

area are in sharp decline, <strong>for</strong> burglary, car crime, drugs and Anti<br />

Social Behaviour. This is possibly due to <strong>the</strong> increased security<br />

of industrial premises and open spaces (CCTV and security<br />

guards). There are no recently reported assaults or o<strong>the</strong>r violent<br />

crimes in <strong>the</strong> industrial area and on Hadrian’s Way, despite its<br />

isolation. It is possible, however, that this is due to low usage<br />

due to fear of crime. The main concern of <strong>the</strong> Community Safety<br />

Team is <strong>the</strong> management of <strong>the</strong> housing renewal period, when<br />

dwellings are progressively emptied and demolished prior to<br />

reconstruction. Training facilities and rise in local employment is<br />

seen as very beneficial <strong>for</strong> <strong>the</strong> future safety and stability of <strong>the</strong><br />

area.<br />

2.3 Businesses<br />

Meeting were held with with a sample of businesses in <strong>the</strong> area,<br />

as follows:<br />

- The Business Club Meeting (December 2004)<br />

- Andrew McFarlane – Blackett Charlton<br />

- Peter Curry – Dickie Formet<br />

- Neil Morrow – Duco Ltd.<br />

- Peter Fraser – Fraser Hydraulic Power Ltd.<br />

- David Mitten – Houghton International<br />

- Philip Kenney – Jebb Metals (Newcastle Ltd)<br />

- Stewart Wild – NIM Engineering Ltd.<br />

- Bruce Shepherd – Shepherd Offshore<br />

As a result of <strong>the</strong> interviews, it was concluded that, by and large,<br />

<strong>the</strong> active businesses have a positive outlook, with <strong>for</strong>ecasts of<br />

moderate to strong growth. This poses <strong>for</strong> many <strong>the</strong> problem of<br />

expanding <strong>the</strong> premises without moving. It was also apparent that<br />

many businesses in <strong>the</strong> marine/ offshore sector have some<br />

degree of interaction and that <strong>the</strong> main “anchor” companies,<br />

Duco and Wellstream, are indispensable <strong>for</strong> <strong>the</strong> prosperity of <strong>the</strong><br />

area. For <strong>the</strong>se, <strong>the</strong> presence of <strong>the</strong> quay and <strong>the</strong> services of<br />

Shepherd Offshore are necessary requirements. The quay, and<br />

<strong>the</strong> way it is managed, however, does not appear to provide<br />

business advantages to <strong>the</strong> smaller companies, mainly because<br />

of cost.<br />

The area, <strong>the</strong>re<strong>for</strong>e, seems to be operating as a cluster, even if<br />

<strong>the</strong>re is no proactive management and marketing strictly in <strong>the</strong><br />

offshore/ marine sector.<br />

The overwhelming concern of <strong>the</strong> businesses appear to be<br />

access and movement within <strong>the</strong> area, and many pointed out<br />

inappropriate traffic management measures, particularly on<br />

Fisher Street. Parking <strong>for</strong> staff was also a concern, as most<br />

yards are not spacious enough to accommodate both car parking<br />

and lorry movement.<br />

A secondary concern was <strong>the</strong> image of <strong>the</strong> area, particularly<br />

because it does not reflect <strong>the</strong> international role, and high<br />

technology, of <strong>the</strong> companies located <strong>the</strong>re. Crime was not a<br />

concern beyond <strong>the</strong> financial burden of maintaining an<br />

appropriate security system.<br />

There was general support <strong>for</strong> <strong>the</strong> programme of improvements <strong>for</strong><br />

residential Walker, partly seen as an improvement of <strong>the</strong> image of<br />

<strong>the</strong> Walker Riverside, and partly because <strong>the</strong>re is a small but<br />

significant percentage of local employees.<br />

The potential provision of local training facilities is seen as a<br />

positive move by most of <strong>the</strong> medium and small companies (<strong>the</strong><br />

large ones provide in house training), as long as <strong>the</strong>re is close<br />

attention to <strong>the</strong> actual needs f <strong>the</strong> local companies, ra<strong>the</strong>r than<br />

<strong>the</strong> provision of standard technical training.<br />

A table summarising <strong>the</strong> responses is shown overleaf.<br />

Walker Riverside <strong>Feasibility</strong> <strong>Study</strong> Section 1 - p. 7


Fig. 2.1 - Business Interviews Summary<br />

Global company 1<br />

Global company 2<br />

Marine medium 1<br />

Marine medium 2<br />

Marine medium 3<br />

Non marine medium<br />

Marine small<br />

Non marine small<br />

Outlook<br />

Ability to expand<br />

locally<br />

N/A<br />

N/A<br />

Locational advantages<br />

Interaction with local<br />

businesses<br />

Quay<br />

Local work<strong>for</strong>ce<br />

Council support<br />

Local colleges<br />

Training<br />

Future on site facility<br />

In house training/<br />

apprentiship<br />

Access to area<br />

Access to site<br />

Yard size/ parking<br />

Issues<br />

Public transport<br />

Neighbouring yards<br />

quality<br />

Quality of residential<br />

area<br />

Cost of safety<br />

Crime<br />

Very positive<br />

Positive<br />

Indifferent<br />

Negative<br />

Very negative<br />

8<br />

Colin Buchanan


www.cbuchanan.co.uk<br />

3. Property and<br />

Development: Overview<br />

of Current Situation<br />

Walker Riverside <strong>Feasibility</strong> <strong>Study</strong><br />

Section 1 - p. 9


3. Property and<br />

Development: Overview of<br />

Current Situation<br />

An analysis of property supply and market trends is outside <strong>the</strong><br />

scope of this study. The following overview, providing background<br />

in<strong>for</strong>mation, is based on <strong>the</strong> March 2003 Walker Riverside –<br />

Supply and Demand <strong>Study</strong>, updated by <strong>the</strong> in<strong>for</strong>mation provided<br />

by <strong>the</strong> businesses interviewed as part of <strong>the</strong> in<strong>for</strong>mation ga<strong>the</strong>ring<br />

stage (see Chapter 2).<br />

A strategic assessment of <strong>the</strong> potential future position of Walker<br />

Riverside is included, in addition, in Section 2 of this report, to<br />

provide a foundation to <strong>the</strong> development of strategic options <strong>for</strong><br />

<strong>the</strong> <strong>the</strong> area.<br />

3.1 Summary Market Outlook<br />

The Walker Riverside has <strong>the</strong> ambition of developing as a cluster<br />

of marine and offshore industries (see Chapter 5, Planning Policy<br />

Audit). This sector of <strong>the</strong> industrial market is a global one, with<br />

very strong competition, with countries that can manufacture<br />

products cheaper (<strong>the</strong> Far East <strong>for</strong> instance) winning large<br />

portions of <strong>the</strong> market share.<br />

Moreover, traditional, labour intensive sectors (shipbuilding, oil<br />

and gas production) are in long term decline, with virtually only<br />

MOD commissions still available in <strong>the</strong> UK. O<strong>the</strong>r newer, and<br />

knowledge intensive, industries in <strong>the</strong> offshore and renewable<br />

sectors are, however, still growing.<br />

- Shipbuilding: Japan, South Korea and China share around<br />

76% of <strong>the</strong> global market, while <strong>the</strong> EU captures about<br />

10%, particularly in high value/ small scale production. Of<br />

this <strong>the</strong> UK has only around a (progressively decreasing)<br />

1%. The sector, however, is a major employer (approx.<br />

423,000 jobs in 2002, including <strong>the</strong> Royal Navy, compared<br />

<strong>for</strong> example with 297,000 jobs in agriculture).<br />

- Offshore oil and gas: despite <strong>the</strong> fact that <strong>the</strong> UK is a<br />

major gas and oil producer, <strong>the</strong>re is a marked downward<br />

trend. Oil rig construction has virtually halted and has been<br />

supplanted by floating plat<strong>for</strong>ms. The sector supports<br />

104,000 jobs directly and 161,000 indirectly (2002 data).<br />

- Renewable energy: it is a small proportion of <strong>the</strong> energy<br />

market (around 3% in <strong>the</strong> UK), but an expanding one.<br />

Europe is <strong>the</strong> main market <strong>for</strong> renewable energy and <strong>the</strong><br />

UK Government has a target of 10.4% energy supplied by<br />

renewables by 2010/11. It is likely that UK production<br />

growth will concentrate on offshore sites.<br />

- Subsea cabling and technologies: fabrication of umbilicals,<br />

subsea piping, cables and o<strong>the</strong>r floorlines is global, with a<br />

limited number of companies with plants all over <strong>the</strong> world.<br />

The sector is much specialised and rapidly growing. There<br />

is a risk, however, of sudden over supply as happened with<br />

<strong>the</strong> collapse of subsea telecommunication cabling in 2000.<br />

3.2 Competitiveness of Walker Riverside<br />

Walker Riverside is predominantly occupied by companies of <strong>the</strong><br />

marine/offshore-related sector. The key industries of <strong>the</strong> sector<br />

have global operations and could advantageously locate in many<br />

o<strong>the</strong>r areas in <strong>the</strong> world.<br />

Tyneside, however, has a cluster of such industries and is one of<br />

<strong>the</strong> strongest of <strong>the</strong> UK. As such, it enjoys policy support.<br />

In <strong>the</strong> UK, competition is limited to few areas:<br />

- Teesside, mainly associated with Corus and<br />

petrochemical/ chemical industries and Teesport, a<br />

substantial container and bulk good terminal;<br />

- <strong>the</strong> Clyde, serving essentially BAE Systems shipbuilding;<br />

- Aberdeen, serving <strong>the</strong> oil and gas industries, but also<br />

developing in research, design and development in two<br />

Technology Parks;<br />

- Belfast, where <strong>the</strong> main yard, Harland and Wolff employs<br />

less than 500 people;<br />

- Portsmouth and Southampton, with storng connections<br />

with <strong>the</strong> Ministry of Defence, but increasingly diversifying<br />

into electronics, mechanical engineering and research; <strong>the</strong><br />

Regional Development Agency (SEEDA) has encouraged<br />

<strong>the</strong> creation of knowledge intensive enterprise hubs on <strong>the</strong><br />

South Coast;<br />

- Limited marine sector industries at <strong>the</strong> Firth of Forth,<br />

Barrow on Furness, Mersey.<br />

The main advantage of <strong>the</strong> Walker Riverside is its long history of<br />

marine and offshore industry, which is part of <strong>the</strong> Tyneside cluster<br />

and recognised by strategic policy. There is also an established<br />

image and working tradition. O<strong>the</strong>r more specific advantages<br />

identified by <strong>the</strong> 2003 Property <strong>Study</strong> and through <strong>the</strong> interviews<br />

with local businesses are:<br />

- The availability of a 1000m long deep water quay, with<br />

heavy lifting capacity, which is an essential requirement <strong>for</strong><br />

<strong>the</strong> large companies;<br />

- The presence of Duco and Wellstream, which generate a<br />

sizeable demand of supplies from o<strong>the</strong>r local<br />

manufacturers;<br />

- The presence of complementary and competing industries<br />

and <strong>the</strong> “cluster effect”;<br />

- The relatively good strategic accessibility;<br />

- The availability of sites capable of accommodating<br />

significantly sized businesses;<br />

- The availability of skilled work<strong>for</strong>ce within <strong>the</strong> Region (not<br />

always locally); and, very importantly,<br />

- The availability of grants and incentives in some instances,<br />

which counterbalanced <strong>the</strong> o<strong>the</strong>rwise relative expensive<br />

accommodation.<br />

10 Colin Buchanan


www.cbuchanan.co.uk<br />

Fig. 3.1 - Industry Type<br />

N<br />

Marine/ offshore industries<br />

Marine/ offshore vacant/underutilised sites<br />

Non industrial uses<br />

Potential change to non industrial<br />

Walker Riverside <strong>Feasibility</strong> <strong>Study</strong><br />

Section 1 - p. 11


The key limitation of <strong>the</strong> area appears to be <strong>the</strong> lack of specific<br />

support at <strong>the</strong> regional level (One NorthEast, Regional<br />

Development Agency) and <strong>the</strong> wavering promotion of <strong>the</strong> marine/<br />

offshore cluster concept:<br />

- lack of active marketing;<br />

- poor high level investment in enterprise, research and<br />

development and incubator poles, <strong>for</strong> example, by<br />

comparison with o<strong>the</strong>r UK areas.<br />

The effect appears to be that of not adding value to <strong>the</strong> industries<br />

of <strong>the</strong> sector that are located in Walker. The practice, however,<br />

equally unfavourable to industries of different sectors that are<br />

located in <strong>the</strong> area and feel <strong>the</strong>ir businesses are not valued.<br />

O<strong>the</strong>r disadvantages of <strong>the</strong> area are its poor local accessibility,<br />

<strong>the</strong> topographical constraints, <strong>the</strong> restricted yards, and <strong>the</strong> poor<br />

physical image of <strong>the</strong> core area.<br />

3.3 Current Property Situation<br />

site, which came on <strong>the</strong> market during <strong>the</strong> study, with a fur<strong>the</strong>r<br />

6.8 ha (16.8 acres) whose leases expire on or be<strong>for</strong>e 2011. There<br />

is a concentration of available or potentially available land in <strong>the</strong><br />

central part of <strong>the</strong> study area, where constraints (topography,<br />

access, different aspirations of <strong>the</strong> residents) are more acute.<br />

The availability of sites opens up <strong>the</strong> opportunity of upgrading<br />

parts of <strong>the</strong> area, improving <strong>the</strong> infrastructure (particularly<br />

access), and of reviewing land use / occupation policies.<br />

3.4 Site Marketing<br />

The City Council directly manages and markets <strong>the</strong> industrial<br />

Walker Riverside. The area is easily identified through a web<br />

search, in <strong>the</strong> Competitive Newcastle website, where appropriate<br />

contact details are given. Similar contacts are provided on site,<br />

on signposts. The area is well known in <strong>the</strong> industrybecause of<br />

its shipbuilding tradition.<br />

The City Council is freehold owners of approximately 75% of <strong>the</strong><br />

overall area, which is largely let out and subject to ground leases.<br />

The City Council, thus, has a degree of control over <strong>the</strong> area,<br />

particularly where <strong>the</strong> leases are about to expire.<br />

The March 2003 Supply and Demand <strong>Study</strong> descibed around<br />

50% of <strong>the</strong> premises as“pre World War 2”, and less than 30% as<br />

“Modern”. The proportion has slightly changed, with a few more<br />

premises recently developed and a few older ones cleared and<br />

demolished (see Fig. 3.3).<br />

Rental levels are in line with those achieved in o<strong>the</strong>r industrial<br />

locations across Tyne & Wear. However some units on Fisher<br />

Street achieve lower rents, and one recent scheme (UK Land)<br />

struggled to find tenants and none of its occupiers has<br />

associations with <strong>the</strong> marine/ offshore sector.<br />

From <strong>the</strong> site visits, however, it is evident that <strong>the</strong>re is a good<br />

proportion of active and growing industries in <strong>the</strong> Walker<br />

Riverside:<br />

- Duco and Wellstream are growing businesses;<br />

- Most medium and small sized industries of <strong>the</strong> sector have<br />

recently wea<strong>the</strong>red a contraction and are now <strong>for</strong>ecasting<br />

expansion within <strong>the</strong>ir premises or within <strong>the</strong> area itself;<br />

- The companies most closely linked with shipbuilding are<br />

experiencing a decline in activity and have reduced <strong>the</strong><br />

number of staff. They are, however, preparing <strong>the</strong>mselves<br />

<strong>for</strong> future diversification.<br />

- Most recently built units are fully occupied, even if taken<br />

up by businesses not related to <strong>the</strong> marine and offshore<br />

sector.<br />

Never<strong>the</strong>less, it is a time of change in <strong>the</strong> Walker Riverside: in<br />

2002 (prior to <strong>the</strong> suspension of work at A&P Tyne) 45% of<br />

businesses and 83% of <strong>the</strong> land had associations with <strong>the</strong><br />

marine/offshore sector. This proportion might change according to<br />

<strong>the</strong> future of <strong>the</strong> Neptune Yard and <strong>the</strong> A&P site (see Fig. 3.1).<br />

There is no high level marketing strategy at <strong>the</strong> international,<br />

national and regional levels. The Regional Development Agency,<br />

One NorthEast, has not included Walker Riverside on North<br />

Tyneside within its priority commercial areas (see Chapter 5).<br />

The Regional Economic Strategy refers to <strong>the</strong> Renewable Energy<br />

Centre <strong>for</strong> Excellence in Blyth and <strong>the</strong> AMEC offshore industry<br />

Visitor Centre. Closer links with <strong>the</strong>se initiatives could be<br />

developed <strong>for</strong> more effective marketing of <strong>the</strong> Walker Riverside.<br />

3.5 Likely Demand<br />

Manufacturing and shipbuilding are in decline in Tyneside. Many<br />

areas close to <strong>the</strong> city centre have been recently successfully<br />

converted into residential or leisure/ cultural areas.<br />

There are still large areas of <strong>the</strong> Tyneside River Corridor that are<br />

available <strong>for</strong> industrial development. The Property Supply and<br />

Demand <strong>Study</strong> had identified approximately 60 ha of available<br />

land on <strong>the</strong> north bank and 23 ha in <strong>the</strong> south bank (2002). This<br />

figure is likely to increase if <strong>the</strong> whole of A&P Tyne, Swan Hunter<br />

and AMEC sites came to <strong>the</strong> market.<br />

It also has to be remembered that <strong>the</strong> marine/ offshore sector is<br />

a global operation, and as such, <strong>the</strong>re is a global choice of<br />

potential sites.<br />

Incentives and political support are likely to be required to attract<br />

ei<strong>the</strong>r substantial marine work in <strong>the</strong> existing yards or ano<strong>the</strong>r<br />

global player of <strong>the</strong> scale of Duco or Wellstream to Walker<br />

Riverside. In this event, <strong>the</strong> established and well knit fabric of<br />

related industries of <strong>the</strong> area would be sufficient to generate<br />

momentum <strong>for</strong> <strong>the</strong> concept of cluster to come to life again.<br />

Clear branding, marketing and infrastructure investments are<br />

likely to be required, particularly given <strong>the</strong> long term weakness of<br />

shipbuilding activities in <strong>the</strong> area and <strong>the</strong> need to refocus <strong>the</strong><br />

sector (see Section 2).<br />

There are large vacant sites, a number of smaller ones, and<br />

some of <strong>the</strong> leases are about to expire (see Fig. 3.2). Vacant<br />

land amounts to a total of 24 ha (59 acres), including <strong>the</strong> A&P<br />

12 Colin Buchanan


www.cbuchanan.co.uk<br />

Fig. 3.2 - Site availability<br />

N<br />

Vacant land<br />

Leases expiring on or be<strong>for</strong>e 2011<br />

O<strong>the</strong>r sites <strong>for</strong> potential change<br />

Council freehold<br />

Freehold o<strong>the</strong>rs<br />

Walker Riverside <strong>Feasibility</strong> <strong>Study</strong><br />

Section 1 - p. 13


Fig. 3.3 - Building types<br />

N<br />

Recent buildings<br />

Post war buildings<br />

Older premises<br />

14 Colin Buchanan


www.cbuchanan.co.uk<br />

4. Regeneration<br />

Initiatives<br />

Walker Riverside <strong>Feasibility</strong> <strong>Study</strong><br />

Section 1 - p. 15


4. Regeneration Initiatives<br />

There are a number of regeneration initiatives, and strategies,<br />

that are relevant to <strong>the</strong> study area. They are described below.<br />

4.1 Walker Riverside Draft Master Plan<br />

(Places <strong>for</strong> People/Llewelyn Davies, 2004)<br />

This document is also known (and referred to elsewhere in this<br />

report) as <strong>the</strong> Places <strong>for</strong> People Master Plan. It is one of six<br />

Regeneration <strong>Area</strong> Plans identified by Newcastle City Council.<br />

The draft master plan submitted to <strong>the</strong> City Council by it its<br />

regeneration partner, Places <strong>for</strong> People, covers a large part of <strong>the</strong><br />

East End of Newcastle and includes this study area. The master<br />

plan is one of a suite of documents including <strong>the</strong> Statement of<br />

Community Involvement, The Case <strong>for</strong> Change and a Design<br />

Code. The draft master plan is currently proceeding through <strong>the</strong><br />

Statutory Planning Process and will become, subject to <strong>the</strong><br />

preferred option process, <strong>the</strong> basis <strong>for</strong> <strong>the</strong> <strong>Area</strong> Action Plan <strong>for</strong><br />

Walker Riverside.<br />

A Walker Riverside Board has been established with<br />

representation from Newcastle City Council, Places <strong>for</strong> People,<br />

Bridging NewcastleGateshead, English <strong>Part</strong>nerships, One North<br />

East, Chamber of Commerce and <strong>the</strong> local community. This<br />

Board will oversee <strong>the</strong> implementation of <strong>the</strong> regeneration plan <strong>for</strong><br />

Walker Riverside.<br />

The nor<strong>the</strong>rn boundary of <strong>the</strong> master plan area is defined by<br />

Welbeck Road and a straight extension of <strong>the</strong> road down to <strong>the</strong><br />

Tyne towards Low Walker. The nor<strong>the</strong>rn riverside of <strong>the</strong> Tyne up<br />

to <strong>the</strong> residential development of St. Peter’s <strong>for</strong>ms <strong>the</strong> sou<strong>the</strong>rn<br />

boundary.<br />

The overarching approach of <strong>the</strong> Draft Master Plan is driven by<br />

<strong>the</strong> following principles: “To make Walker more sustainable in<br />

every sense: environmentally, economically and socially” and<br />

“Staying ahead of <strong>the</strong> game” (i.e. building new be<strong>for</strong>e any major<br />

demolition takes place).<br />

As a priority <strong>the</strong> Draft Master Plan addresses issues and<br />

proposes change connected with <strong>the</strong> housing stock and<br />

community facilities, toge<strong>the</strong>r with open space and public<br />

transport provision. The key proposals to regenerate <strong>the</strong> area are<br />

as follows:<br />

- 2,500 new homes over a period of 15 years and located in<br />

a belt between Walker Road and <strong>the</strong> River Tyne, starting<br />

with Cambrian development and Pottery Bank.<br />

- The Cambrian development (awarded “Minded to Grant”<br />

status in December 2004) is <strong>the</strong> first step of <strong>the</strong><br />

implementation of <strong>the</strong> master plan, and very important to<br />

increase confidence in <strong>the</strong> area.<br />

- Community and retail cores with a range of services: in <strong>the</strong><br />

west around <strong>the</strong> junction of Walker Road/Pottery Bank and<br />

in <strong>the</strong> east at Church Walk.<br />

- A network of enhanced open spaces, including Walker<br />

Riverside Park, Walker and Harbottle Park, Hadrian’s Way,<br />

Allotments Gardens and Green Fingers connecting <strong>the</strong><br />

considerable quantity of existing scattered open spaces.<br />

- A range of proposals targeting a considerable enhanced<br />

public transport provision and street enhancement<br />

schemes including a tram linking <strong>the</strong> area with <strong>the</strong> Metro<br />

network (subsequntly abandoned on financial grounds), <strong>the</strong><br />

trans<strong>for</strong>mation of Walker Road into an attractive boulevard<br />

and <strong>the</strong> consequent designation of a preferred freight route<br />

entering <strong>the</strong> industrial area from Fisher Street/ Low Walker.<br />

It is expected that that <strong>the</strong> proposed enhancements will<br />

contribute to a better quality of life <strong>for</strong> <strong>the</strong> neighbourhood and<br />

improve <strong>the</strong> overall image of Walker as place to live and work. In<br />

this respect, <strong>the</strong> delivery of <strong>the</strong> Places <strong>for</strong> People Plan would<br />

have indirect benefits <strong>for</strong> <strong>the</strong> industrial area (improved urban<br />

setting, better quality of local life, social stability, improved local<br />

schools and public transport, etc.), which could help supporting<br />

its long term prosperity.<br />

However, as <strong>the</strong> Places <strong>for</strong> People Master Plan also comprises<br />

approximately two thirds of <strong>the</strong> Walker Riverside industrial area,<br />

it also makes suggestions <strong>for</strong> change that will directly affect <strong>the</strong><br />

businesses located alongside <strong>the</strong> river:<br />

- Designation of mixed uses (business, industry, retail,<br />

residential and leisure) in <strong>the</strong> central part of <strong>the</strong> industrial<br />

area<br />

- The identification of Walker Road as a key public transport<br />

route and urban corridor<br />

- The restriction of heavy lorry traffic to <strong>the</strong> Fisher Street /<br />

Fossway route<br />

- The proposals of introducing public access to <strong>the</strong> river<br />

through green links and fingers in <strong>the</strong> south and <strong>the</strong> central<br />

part of <strong>the</strong> area<br />

- The creation of landmark building at <strong>the</strong> sou<strong>the</strong>rn edge of<br />

<strong>the</strong> area.<br />

These proposals reflect an aspiration of better integration<br />

between residential and industrial area and a future of<br />

modernisation and diversification of <strong>the</strong> overall business portfolio<br />

in <strong>the</strong> area, which was not tested in terms of long term viability.<br />

4.2 Newcastle Plan (2004) and Outer East <strong>Area</strong><br />

Regeneration Plan (Draft Version 1.7 – 2003)<br />

These two documents set <strong>the</strong> scene <strong>for</strong> <strong>the</strong> Places <strong>for</strong> People<br />

Master Plan.<br />

The Newcastle Plan is <strong>the</strong> joint document containing <strong>the</strong><br />

Community Strategy and <strong>the</strong> Neighbourhood Renewable Strategy<br />

and sets <strong>the</strong> agenda <strong>for</strong> improving <strong>the</strong> most deprived areas of <strong>the</strong><br />

city and guide <strong>the</strong> allocation of over £13m of Neighbourhood<br />

Renewal Fund.<br />

The Outer East <strong>Area</strong> Regeneration Plan is one of three<br />

regeneration plans <strong>for</strong> <strong>the</strong> East End of <strong>the</strong> city.<br />

Both Plans recognise <strong>the</strong> industrial Walker Riverside as a<br />

strategic site <strong>for</strong> employment in <strong>the</strong> engineering, marine, offshore<br />

and renewables sector.<br />

16 Colin Buchanan


www.cbuchanan.co.uk<br />

The Outer East <strong>Area</strong> Regeneration Plan describes <strong>the</strong> current<br />

strategy as “…being <strong>for</strong>mulated to increase <strong>the</strong> amount of<br />

development land available and to encourage <strong>the</strong> development in<br />

conjunction with <strong>the</strong> private sector of new accommodation in<br />

support of <strong>the</strong> supply chain and clustering companies…”. It<br />

proposes an increase of 1,000 to 1,500 new engineering jobs by<br />

2020 as well as new 28.000 sqm of floorspace by 2010 <strong>for</strong><br />

industrial Walker.<br />

The plan also proposes <strong>the</strong> following:<br />

- Selective purchase of sites and buildings to assemble and<br />

create opportunities <strong>for</strong> new development on brownfield<br />

land;<br />

- Site preparation works to encourage potential investors<br />

e.g. at Neptune Yard;<br />

- Environmental and security works to improve <strong>the</strong> overall<br />

security and physical appearance of <strong>the</strong> area. This<br />

includes a heritage site between Malaya Drive and White<br />

Road/ Walker Road junction;<br />

- Conversion of Wincomblee Workshops to offices and a car<br />

park;<br />

- Supporting private sector partnerships in creating<br />

floorspace targeted at <strong>the</strong> sector e.g. development at Top<br />

Sheds (500 sqm);<br />

- Developing skills training requirements in conjunction with<br />

<strong>the</strong> major employers, colleges and o<strong>the</strong>r organisations;<br />

and<br />

- Develop a web site and a marketing tool <strong>for</strong> companies<br />

engaged in <strong>the</strong> sector (Tyne Offshore Suppliers).<br />

4.3 TyneWear <strong>Part</strong>nership – <strong>the</strong> sub-regional<br />

level<br />

The TyneWear <strong>Part</strong>nership is responsible <strong>for</strong> implementing <strong>the</strong><br />

Single Programme (and European programmes) of <strong>the</strong> Tyne and<br />

Wear sub-region, <strong>the</strong> metropolitan heart of <strong>the</strong> economy of <strong>the</strong><br />

north east. The <strong>Part</strong>nership includes key representatives from <strong>the</strong><br />

private, voluntary, community and public sector.<br />

The <strong>Part</strong>nership has aimed <strong>for</strong> a distinctive sub-regional response<br />

to <strong>the</strong> ONE North East Regional Economic Strategy (RES) on<br />

<strong>the</strong> base of <strong>the</strong> findings of <strong>the</strong> Tyne and Wear Economic Strategy<br />

(TWES).<br />

Schedule B of <strong>the</strong> Delivery Plan 2004/2005 indicates that <strong>the</strong>re<br />

are £650.000 approved <strong>for</strong> a scheme labelled as Walker Riverside<br />

Offshore Scheme.<br />

Walker Riverside <strong>Feasibility</strong> <strong>Study</strong> Section 1 - p. 17


Fig. 4.1 - Places <strong>for</strong> People Plan proposals affecting <strong>the</strong> study area<br />

N<br />

Church Walk local centre<br />

Residential redevelopment<br />

Redevelopment/ new attractive frontage<br />

Mixed use area<br />

Boulevard<br />

Green fingers<br />

Gateway feature<br />

18 Colin Buchanan


www.cbuchanan.co.uk<br />

5. Planning Policy<br />

Audit<br />

Walker Riverside <strong>Feasibility</strong> <strong>Study</strong><br />

Section 1 - p. 19


5. Planning Policy Audit<br />

This section will identify <strong>the</strong> strategic significance of <strong>the</strong> area, <strong>the</strong><br />

development strategy and <strong>the</strong> regional context by reviewing<br />

Regional Planning Guidance <strong>for</strong> <strong>the</strong> North East and <strong>the</strong> Regional<br />

Economic Strategy <strong>for</strong> <strong>the</strong> North East; and provide a local<br />

context and site specific policy, by reviewing <strong>the</strong> Unitary<br />

Development Plan <strong>for</strong> Newcastle, <strong>the</strong> Local Economic<br />

Development Strategy and o<strong>the</strong>r related documents.<br />

5.1 Strategic Planning<br />

Strategic planning policies promote <strong>the</strong> development of a<br />

knowledge based economy, particularly <strong>for</strong> engineering and<br />

manufacturing. They support <strong>the</strong> establishment of clusters,<br />

including <strong>for</strong> offshore and marine industries. They do not,<br />

however, identify or promote <strong>the</strong> Walker Riverside area in any<br />

particular way.<br />

Moreover <strong>the</strong>y note <strong>the</strong> overprovision of employment land and<br />

seek de-allocation of employment sites, except where <strong>the</strong>re is a<br />

realistic potential of port related activity.<br />

5.1.1 Regional Spatial Strategy <strong>for</strong> <strong>the</strong> North<br />

East – RSS 1 (2002)<br />

The Regional Spatial Strategy (RSS) <strong>for</strong> <strong>the</strong> North East was<br />

adopted in 2002 and provides a spatial strategy <strong>for</strong> <strong>the</strong> North<br />

East up to 2021. The RSS is now under review and a<br />

consultation draft was published in November 2004. A summary<br />

of both Plans is provided below, including <strong>the</strong> Plan’s strategy<br />

along with policies that affect <strong>the</strong> Walker River side.<br />

The locational strategy identifies <strong>the</strong> following priority areas <strong>for</strong><br />

growth:<br />

- Majority of new development should be located within <strong>the</strong><br />

built up areas of <strong>the</strong> Tyne, Wear and Tees Conurbations;<br />

- A significant but smaller scale developments in Hartlepool,<br />

Darlington, and <strong>the</strong> main towns serving o<strong>the</strong>r regeneration<br />

areas; and<br />

- Enhance <strong>the</strong> role of market towns and o<strong>the</strong>r main rural<br />

centres.<br />

Employment Strategy<br />

The strategy aims to facilitate an economic renaissance by<br />

encouraging inward investment opportunities, <strong>the</strong> development of<br />

Small/Medium Enterprises (SME’s) and <strong>the</strong> growth of indigenous<br />

businesses. This will be promoted by providing good quality<br />

employment and business sites to meet <strong>the</strong> needs of<br />

businesses.<br />

The Strategy notes that <strong>the</strong>re is an overprovision of employment<br />

land in <strong>the</strong> region and <strong>the</strong>re<strong>for</strong>e a Regional Employment land<br />

survey is being conducted. However, an additional strategic<br />

employment site in <strong>the</strong> broad location of north of Sunderland is<br />

identified.<br />

Cluster development is also being promoted in <strong>the</strong> region. One<br />

NorthEast, <strong>the</strong> Regional Development Agency is promoting <strong>the</strong><br />

following clusters (two of which could be relevant to <strong>the</strong> study<br />

area, indicated by *):<br />

- Automotive;<br />

- Bio-sciences;<br />

- Chemicals;<br />

- Electronics;<br />

- Environmental industries*;<br />

- Food and drink;<br />

- Multi-media;<br />

- Offshore/marine/high value added engineering including<br />

energy*;<br />

- Rural clusters; and<br />

- Tourism and cultural industries.<br />

Sites adjacent to ports and deep water passages are quoted as<br />

being assets in <strong>the</strong> RSS and should be protected where <strong>the</strong>y<br />

have a realistic potential of port related purposes.<br />

Housing Strategy<br />

Housing provision <strong>for</strong> <strong>the</strong> North East Region is set at 5,050<br />

dwellings per annum <strong>for</strong> <strong>the</strong> period 2002-2006 (350 per annum <strong>for</strong><br />

Newcastle Upon Tyne) to reflect <strong>the</strong> RSS strategy of economic<br />

renaissance, reversing out-migration and stabilising population.<br />

An early review is required to reconsider this allocation due to <strong>the</strong><br />

problems of low demand and abandonment in <strong>the</strong> region.<br />

Specific Policy<br />

The following policies are pertinent to <strong>the</strong> Walker Riverside <strong>Area</strong><br />

and its development:<br />

Employment<br />

The policies below support <strong>the</strong> renewal and <strong>the</strong> development of<br />

<strong>the</strong> Walker Riverside area as an existing employment area and<br />

promote cluster development.<br />

- Policy EL3 promotes <strong>the</strong> renewal and modernising of<br />

existing employment areas through development plans and<br />

o<strong>the</strong>r strategies.<br />

- Policy EL5 promotes <strong>the</strong> creation and expansion of<br />

innovative business cluster areas. Development Plans<br />

should ensure that sites are well related to o<strong>the</strong>r<br />

development, accessible by a means of transport, priority<br />

is given to brown field sites, sites should make use of<br />

successful existing employment areas in <strong>the</strong> locality and<br />

<strong>the</strong> creation of necessary physical infrastructure and<br />

support networks.<br />

- Policy EL7 safeguards development sites adjacent to<br />

existing ports <strong>for</strong> industries and port related services that<br />

would benefit from <strong>the</strong>se locations.<br />

Environment<br />

The Walker Riverside area contains a number of environmental<br />

assets, particularly as it contains open space designations, a<br />

Site of Local Conservation Interest (SLCI), and is adjacent to <strong>the</strong><br />

River Tyne, which provides an important habitat <strong>for</strong> wildlife.<br />

- Policy ENV5 regarding biodiversity states that<br />

development plans and o<strong>the</strong>r strategies should aim to<br />

maintain and increase biodiversity.<br />

- Policy ENV10 on open space resists <strong>the</strong> unnecessary<br />

20 Colin Buchanan


www.cbuchanan.co.uk<br />

development on open space.<br />

- Policy ENV14 regarding <strong>the</strong> historic landscape seeks to<br />

preserve, in situ, Scheduled Ancient Monuments.<br />

- Policy ENV15 designates Hadrian’s Wall as a world<br />

heritage site and aims to protect <strong>the</strong> setting of <strong>the</strong> site<br />

from inappropriate development.<br />

Transport<br />

The Walker Riverside <strong>Area</strong> contains a deep water facilities and<br />

<strong>the</strong>re<strong>for</strong>e <strong>the</strong> following policy supports <strong>the</strong> protection of such<br />

sites.<br />

- Policy T16 promotes <strong>the</strong> safeguarding of sites adjacent to<br />

ports <strong>for</strong> associated development.<br />

Energy<br />

identified <strong>for</strong> restricted employment uses. It is likely that this<br />

provision will not be developed in its entirety by 2021. The plan<br />

identifies that Newcastle should allocate up to 165ha of<br />

employment land, including;<br />

- 25ha general employment land;<br />

- 10ha of mixed use allocation; and<br />

- 130ha of prestige employment sites.<br />

Even with <strong>the</strong> likely predicted increase in land requirements,<br />

<strong>the</strong>re remains an oversupply in Northumberland, County Durham<br />

and Tees Valley. However, a potential shortfall is identified in Tyne<br />

and Wear.<br />

Prestigious employment sites are identified within policy 21, and<br />

do not include Walker Riverside. The policy designates <strong>the</strong><br />

following sites:<br />

The RSS supports <strong>the</strong> development off-shore wind clusters which<br />

is reflected in <strong>the</strong> policy below and supporting paragraphs.<br />

- Policy EN2 on renewable energy states that development<br />

plans and o<strong>the</strong>r strategies should identify <strong>the</strong> general<br />

locations of Strategic Wind Resource <strong>Area</strong>s, including offshore<br />

locations.<br />

5.1.2 Regional Spatial Strategy <strong>for</strong> <strong>the</strong> North<br />

East – Consultation Draft - RSS 1 (2004)<br />

The RSS consultation draft was published in November 2004 and<br />

will replace <strong>the</strong> existing RSS (2002). The policies of <strong>the</strong> plan<br />

have an end date of 2021, however, some policies will guide<br />

development over a longer period. The strategy aims to reduce<br />

<strong>the</strong> economic and social disparities between <strong>the</strong> North East and<br />

o<strong>the</strong>r regions, by moving towards a more knowledge based<br />

economy and regenerating areas that have experienced high<br />

levels of socio-economic deprivation, urban dereliction and low<br />

demand.<br />

The locational strategy <strong>for</strong> <strong>the</strong> North East is based on ‘<strong>the</strong> two<br />

city regions concept - <strong>the</strong> Tyne and Wear and Tees Valley. The<br />

RSS supports <strong>the</strong> development of <strong>the</strong>se city regions in<br />

conjunction with developing vibrant rural areas (i.e. market towns<br />

and rural service centres).<br />

Employment Strategy<br />

The strategy builds upon <strong>the</strong> Regional Economic Strategy <strong>for</strong> <strong>the</strong><br />

Region, by supporting <strong>the</strong> continued restructuring of <strong>the</strong> economy<br />

to capture <strong>the</strong> growth potential of new innovative industries such<br />

as <strong>the</strong> renewable energy sector and <strong>the</strong> service and in<strong>for</strong>mation<br />

technology sector. At present, <strong>the</strong> economy of <strong>the</strong> region is<br />

changing with more emphasis on <strong>the</strong> service sector, knowledge<br />

based industries and closer links between universities and<br />

businesses. Employment in manufacturing is expected to<br />

decline. However, <strong>the</strong> Strategy stresses that it remains an<br />

important sector <strong>for</strong> <strong>the</strong> regions economy and provision should be<br />

made <strong>for</strong> fur<strong>the</strong>r developments within this sector.<br />

Following <strong>the</strong> Regional Employment Land Survey and Local Plan<br />

reviews, a number of sites designated <strong>for</strong> employment purposes<br />

have been de-allocated, however, <strong>the</strong>re still remains provision <strong>for</strong><br />

approximately 2,700 ha, which also takes into account sites<br />

- West Hart<strong>for</strong>d, Cramlington - This site is being marketed<br />

as a Bioscience Park, and comprises of 55ha of land with<br />

good transport accessibility.<br />

- Newcastle Great Park - Location <strong>for</strong> digital based<br />

businesses, with a focus on innovation and<br />

entrepreneurship, providing incubator units <strong>for</strong> start-up<br />

firms and facilities <strong>for</strong> technology transfer, financial and<br />

management support.<br />

- Newburn Riverside, Newcastle - Located on <strong>the</strong> north side<br />

of <strong>the</strong> River Tyne which has planning permission <strong>for</strong> B1, B2<br />

and B8 uses.<br />

- North of Sunderland - The site could potentially cross 3<br />

local authorities including Sunderland, Gateshead and<br />

South Tyneside. It will provide land <strong>for</strong> regionally<br />

significant emerging growth sectors and could support<br />

cluster/campus developments to support knowledge based<br />

industries.<br />

- Knowledge Campus, Baltic Business Park Gateshead -<br />

This is an international centre, providing workspaces,<br />

technology based products and on-line services to <strong>the</strong><br />

global product development community.<br />

- North East Technology Park, Sedgefield - Conceived as a<br />

regional centre <strong>for</strong> technology transfer.<br />

- Wynard Business Park – being developed <strong>for</strong> business<br />

purposes, including electronics’ and high tech sectors.<br />

Sites adjacent to ports and deep water passages are considered<br />

assets and should be protected where <strong>the</strong>y have a realistic<br />

potential of port related purposes.<br />

In terms of <strong>the</strong> renewable energy, on -shore wind schemes are<br />

being promoted in certain locations within Policy 44, that have<br />

<strong>the</strong> least environmental impact. With regards proposals <strong>for</strong><br />

offshore wind developments along <strong>the</strong> North East , <strong>the</strong> strategy<br />

supports <strong>the</strong>ir development in principle, subject to local<br />

assessment. The RSS also stresses that it is unlikely that<br />

fur<strong>the</strong>r commercial offshore wind site/wave energy generation will<br />

come <strong>for</strong>ward in <strong>the</strong> region be<strong>for</strong>e 2010, o<strong>the</strong>r than those already<br />

committed. It is also too early to consider <strong>the</strong> potential <strong>for</strong> future<br />

deep water offshore wind developments, although this will be<br />

reviewed in subsequent RSS reviews.<br />

Walker Riverside <strong>Feasibility</strong> <strong>Study</strong> Section 1 - p. 21


Housing Strategy<br />

Housing provision <strong>for</strong> <strong>the</strong> North East Region is set at 6,505<br />

dwellings per annum <strong>for</strong> <strong>the</strong> period 2004-2021 which corresponds<br />

to <strong>the</strong> provision of 790 dwellings per annum <strong>for</strong> Newcastle (350 in<br />

<strong>the</strong> previous strategy). New housing and improvements to<br />

existing stock is required to meet aspirations <strong>for</strong> better housing<br />

and to attract high skilled entrepreneurials. The increase<br />

provision will provide <strong>for</strong> improvement or replacement of dwellings<br />

concurrently with increasing dwelling stock which has been<br />

influenced by Housing Market Restructuring and economic,<br />

demographic and housing model projections.<br />

Specific Policy<br />

The following policies are pertinent to <strong>the</strong> Walker Riverside <strong>Area</strong><br />

and its development:<br />

Employment<br />

- Policy 15 regarding sustainable economic development<br />

promotes <strong>the</strong> majority of new economic development and<br />

investment in <strong>the</strong> main towns of <strong>the</strong> Tyne and Wear and<br />

Tees valley city region. Economic development proposal<br />

should prioritise <strong>the</strong> renewal and reuse of previously<br />

development land and buildings within towns and city<br />

centres and established industrial and commercial<br />

estates.<br />

Environment<br />

- Policy 13 designates Hadrian’s Wall as a World Heritage<br />

Site. Plans and strategies should incorporate <strong>the</strong><br />

principles of <strong>the</strong> Hadrian’s Wall Management Plan and<br />

seek to maintain and enhance <strong>the</strong> quality, diversity and<br />

local distinctiveness of landscape character and seek to<br />

preserve in situ, Scheduled Ancient Monuments.<br />

- Policy 36 seeks to conserve and enhance <strong>the</strong> historic<br />

environment of <strong>the</strong> region.<br />

- Policy 37 states that strategies, plans and programmes<br />

should ensure <strong>the</strong> region’s ecological and geological<br />

resources are protected and enhanced to return key<br />

biodiversity levels to viable levels.<br />

- Policy 38 states that strategies, plans and programmes<br />

should ensure that any development along river corridors<br />

takes account of pollution, flooding and climate change<br />

and <strong>the</strong> necessary mitigation measures incorporated into<br />

schemes.<br />

Energy<br />

- Policy 43 on planning <strong>for</strong> renewable energy states that<br />

development plans and o<strong>the</strong>r strategies should support and<br />

encourage renewable energy proposals and identify<br />

resources.<br />

5.1.3Regional Economic Strategy (2002)<br />

The Regional Economic Strategy (RES) <strong>for</strong> <strong>the</strong> North East was<br />

published in 2000 by One NorthEast - <strong>the</strong> Regional Development<br />

Agency. The RES identifies <strong>the</strong> need to develop a knowledge<br />

based economy, raise aspirations, develop a skilled work<strong>for</strong>ce,<br />

build an enterprise culture and raise employment rates.<br />

The strategy identifies six interlinked strategic objectives, which<br />

are as follows:<br />

- Create wealth and raising productivity of all businesses<br />

and to support <strong>the</strong> success of globally competitive<br />

clusters.<br />

- Establishing a new entrepreneurial culture to streng<strong>the</strong>n<br />

wealth creating capacity. The strategy aims to encourage<br />

new firms by creating an integrated business support unit.<br />

- Creating a healthy labour market, supported by a skilled<br />

work<strong>for</strong>ce by improving basic skills of adults and raising<br />

young peoples achievement level.<br />

- Recognising universities and colleges are at <strong>the</strong> heart of<br />

<strong>the</strong> region’s economy. It is anticipated that research and<br />

technology will be streng<strong>the</strong>ned.<br />

- Meet twenty-first century transport, communication and<br />

property needs to meet expectations of global companies<br />

and to make sites attractive to new companies.<br />

- Realising <strong>the</strong> renaissance of rural and urban communities.<br />

One of <strong>the</strong> key priorities of <strong>the</strong> strategy is to develop key<br />

business clusters and collaborative networks. This is linked to<br />

<strong>the</strong> region’s research and development strengths fostered in <strong>the</strong><br />

universities and individual firms. It defines ‘clusters’ as a<br />

concentration of competing, collaborating or independent<br />

companies or institutions connected to one ano<strong>the</strong>r by market or<br />

non-market links. This approach links learning and employment<br />

opportunities toge<strong>the</strong>r with <strong>the</strong> possibility of improved<br />

environments and accessibility.<br />

Clusters that are being promoted in <strong>the</strong> region include<br />

automotive, base chemicals, bioscience, clothing and textiles,<br />

creative industries, defence and precision engineering, digital,<br />

electronics, environmental industries, food and drink,<br />

nanotechnology, offshore, pharmaceuticals and speciality<br />

chemicals and tourism. With regards to offshore clusters, a<br />

business plan is in hand and is being developed in <strong>the</strong> context of<br />

<strong>the</strong> new Renewable Energy Centre of Excellence, in Blyth,<br />

Northumberland. The region is working with research and<br />

development specialists in Michigan State and in Denmark to<br />

provide research into wind turbine development. The strategy<br />

also identifies <strong>the</strong> Shell Bonga project which is a contract to refit<br />

<strong>the</strong> Hull of Bonga (floating production and storage vessel <strong>for</strong> <strong>the</strong><br />

Nigerian offshore oil and gas industry) at <strong>the</strong> AMEC yard in<br />

Wallsend, Newcastle. AMEC, in conjunction with One NorthEast,<br />

<strong>the</strong> DTI and Trade <strong>Part</strong>ners UK are creating a national visitor<br />

centre that will identify <strong>the</strong> national and regional strengths of <strong>the</strong><br />

offshore industry.<br />

22 Colin Buchanan


www.cbuchanan.co.uk<br />

5.2 Local Policy Context<br />

5.2.1Newcastle Unitary Development Plan (1998)<br />

The Newcastle Unitary Development Plan (UDP) was adopted in<br />

January 1998 and covers <strong>the</strong> period up to 2006. The review of <strong>the</strong><br />

UDP is about to commence and will involve its replacement with<br />

a Local Development Framework (LDF). A Key Issues Report<br />

was published in March 2004 to gain initial comments and<br />

feedback on areas where significant changes of policy or new<br />

issues that have arisen.<br />

Policies in <strong>the</strong> UDP clearly support <strong>the</strong> retention of Walker<br />

Riverside <strong>for</strong> employment uses and specifically support <strong>the</strong><br />

regeneration of <strong>the</strong> wider area.<br />

Employment<br />

With regards to economic development and employment, <strong>the</strong><br />

UDP states that economic revitalisation requires <strong>the</strong> economy to<br />

diversify into new sectors of employment, securing inward<br />

investment, retaining and providing <strong>for</strong> <strong>the</strong> expansion of existing<br />

businesses and assisting new business <strong>for</strong>mation<br />

Newcastle is dominated by <strong>the</strong> service sector and this will<br />

continue in <strong>the</strong> <strong>for</strong>eseeable future. However, <strong>the</strong> need to expand<br />

employment in manufacturing will create a broader economic<br />

base. The UDP states that existing industrial areas which are<br />

well located and close to areas of high unemployment are<br />

valuable and will contribute to <strong>the</strong> range and choice of economic<br />

development opportunities.<br />

Housing Strategy<br />

Land is allocated to allow <strong>for</strong> 10,000 dwellings to provide <strong>the</strong><br />

number, range and choice of dwellings during <strong>the</strong> plan period<br />

1988-2006 (556 per year) and stabilise <strong>the</strong> population.<br />

Site Specific Policies<br />

Employment<br />

The study area is defined within <strong>the</strong> adopted UDP <strong>for</strong> <strong>the</strong><br />

retention of industrial uses (ED3.1). The sou<strong>the</strong>rn end of <strong>the</strong><br />

study area is identified as an area of economic development<br />

(ED1.1), while <strong>the</strong> north of <strong>the</strong> study area is marked as an area<br />

<strong>for</strong> industrial and commercial improvement (See Fig. 5.1). The<br />

following strategic and local policies apply:<br />

Policy No<br />

Employment<br />

ED1<br />

ED1.1<br />

ED3<br />

ED3.1<br />

ED04<br />

ED4.1<br />

Policy Text<br />

Sufficient land will be provided to allow a range and choice of sites and<br />

opportunities by size, location and quality which can secure economic and<br />

employment growth <strong>for</strong> <strong>the</strong> benefit of <strong>the</strong> city and <strong>the</strong> region.<br />

Land is allocated <strong>for</strong> <strong>the</strong> following economic development uses in accordance with<br />

Policy ED1.<br />

Format: Site (<strong>Area</strong> in hectares) Category<br />

A) Offices, high technology industry, R & D (B1) and High Tech uses with clean<br />

industrial processes within use class B2<br />

1. Nor<strong>the</strong>rn development area (80.0) 1<br />

B) Business (B1)<br />

2. Collingwood Clinic (5.4) 2<br />

3. St. Silas, Shields Road (1.0) 4<br />

C) Business and general industry (B1, B2, B8)<br />

4. Newburn Haugh (75.0) 3<br />

5. Walker Riverside <strong>Industrial</strong> Estate (7.9) 4 – Good quality urban site<br />

6. Sandhills (2.7) 4<br />

7. Heaton Junction (5.2) 4<br />

8. Fowberry Road, Scotswood (0.5) 5<br />

D) Airport related uses<br />

9. Newcastle international Airport (203.0) N/A<br />

E) Essential services <strong>for</strong> trunk road users<br />

10.North Brunton (2.0) N/A<br />

Land and premises allocated <strong>for</strong> industrial and business use will be safeguarded <strong>for</strong><br />

primarily classes B1 (Light Industry, Offices, and Research & Development) B2<br />

(General Industry), and B8 (Storage and Distribution); development <strong>for</strong> o<strong>the</strong>r uses<br />

will not be allowed.<br />

In <strong>the</strong> following areas allocated <strong>for</strong> industrial and business use, development will be<br />

restricted to Classes B1, B2 and B8. This restriction does not apply to development<br />

of an existing use which is not B1, B2 or B8 and which does not involve a change of<br />

use:<br />

34) Walker Riverside <strong>Industrial</strong> Park<br />

35) Walker Riverside<br />

Planning permission will be granted <strong>for</strong> development which assists <strong>the</strong><br />

regeneration of older industrial area provided that any proposed scheme is<br />

appropriate having regard to <strong>the</strong> policies of <strong>the</strong> plan and o<strong>the</strong>r material<br />

considerations.<br />

Walker Riverside is identified <strong>for</strong> industrial and commercial improvement in<br />

accordance with Policy ED4.<br />

Walker Riverside <strong>Feasibility</strong> <strong>Study</strong> Section 1 - p. 23


Fig. 5.1 - UDP policy map<br />

Proposed cycle route<br />

Wildlife corridor<br />

Open space<br />

Site of Local Conservation Interest<br />

<strong>Area</strong> <strong>for</strong> industrial and commercial<br />

improvement<br />

Economic development<br />

<strong>Area</strong> retained <strong>for</strong> industrial use<br />

Hadrian’s Wall Strategic Recreational<br />

Route<br />

Secondary Distributor Road<br />

24 Colin Buchanan


www.cbuchanan.co.uk<br />

Environmental<br />

A number of o<strong>the</strong>r designations affect <strong>the</strong> Walker Riverside study area,<br />

including <strong>the</strong> following:<br />

- Open space; Hadrian’s Way Strategic Recreation Route;<br />

Existing Recreation Route; River Tyne Wildlife Corridor; Wildlife<br />

Corridor; Site of Local Conservation Interest (SLCI); Secondary<br />

distributor road; and Proposed cycling route.<br />

A summary of relevant strategic policies and <strong>the</strong> corresponding site<br />

specific policy is provided below which applies to <strong>the</strong> Walker Riverside<br />

<strong>Area</strong>.<br />

Policy No<br />

Environmental<br />

EN4<br />

OS1<br />

Policy Text<br />

Development closely related to <strong>the</strong> rivers and riverside will only be permitted if it:<br />

is appropriate, imaginative and sensitive to river settings;<br />

contributes to <strong>the</strong> renewal and improvement of <strong>the</strong> riverside corridors; and<br />

does not significantly detract from <strong>the</strong> amenity of a riverside corridor or reduce access<br />

to <strong>the</strong> riverside.<br />

The best possible standards in <strong>the</strong> range, amount, distribution, accessibility and quality<br />

of open space will be sought throughout <strong>the</strong> city by:<br />

preventing <strong>the</strong> loss of open space to development;<br />

maintaining and improving <strong>the</strong> existing open space;<br />

creating new open space where opportunities occur and in association with new<br />

development;<br />

promoting recreation in <strong>the</strong> countryside through schemes <strong>for</strong> environmental<br />

improvement, public access, and appropriate facilities; and<br />

pursing provision <strong>for</strong> all needs in <strong>the</strong> community, including those of children, <strong>the</strong> elderly<br />

and people with disabilities.<br />

0S1.4 Development which would cause demonstrable harm to any public open space or private<br />

open space <strong>for</strong> outdoor sport, will not be allowed. Harm includes <strong>the</strong> loss of <strong>the</strong> space in<br />

whole or part development, and will <strong>the</strong>re<strong>for</strong>e only be allowed in exceptional<br />

circumstances in accordance with policy OS1.5.<br />

OS1.5<br />

OS1.6<br />

OS2<br />

OS2.1<br />

NC1<br />

NC1.1<br />

NC1.3<br />

NC1.5<br />

NC1.6<br />

C4<br />

Development affecting an open space subject to policy OS1.4 may only be allowed if any<br />

of <strong>the</strong> following exceptional circumstances apply:<br />

it is <strong>for</strong> recreational purposes relevant to <strong>the</strong> use of <strong>the</strong> space;<br />

it is <strong>for</strong> new or improved essential local community facilities <strong>for</strong> which <strong>the</strong>re are no<br />

alternative sites;<br />

<strong>the</strong> only mean of retaining or enhancing <strong>the</strong> open space is through development of a<br />

small part; and<br />

alternative provision of equivalent community benefit is made available.<br />

Sites are identified as open space <strong>for</strong> <strong>the</strong> purposes of policies OS1, OS1.4 and OS1.5.<br />

This includes Walker Riverside Park – an area of countryside character.<br />

A recreation route network is defined which will:<br />

give safe, easy access <strong>for</strong> walkers, cyclists and horse riders to key open spaces,<br />

recreation sites and leisure facilities;<br />

be accessible to all neighborhoods;<br />

link <strong>the</strong> urban are with <strong>the</strong> countryside;<br />

allow recreation in <strong>the</strong> countryside subject to wildlife considerations;<br />

link with recreational routes in adjoining districts to create strategic routes of regional<br />

and national importance <strong>the</strong>reby widening recreation choice; and<br />

be accessible to all sections of <strong>the</strong> community.<br />

Hadrian’s Way - <strong>the</strong> designated route of Hadrian’s Wall Path National Trail will be<br />

developed as a strategic recreational route of regional and national importance.<br />

The nature conservation resources of <strong>the</strong> city will be maintained and enhanced by <strong>the</strong><br />

protection of habitats and features and a requirement on all new development to take<br />

account of <strong>the</strong> needs of wildlife.<br />

Development which would cause demonstrable harm to a site of Nature Conservation<br />

Importance (SNCI) or site of Local Conservation Importance (SLCI) will only be allowed:<br />

Where <strong>the</strong>re is a proven public interest which outweighs <strong>the</strong> harm to <strong>the</strong> site;<br />

Where it can be shown that <strong>the</strong> need <strong>for</strong> <strong>the</strong> development cannot be met in o<strong>the</strong>r<br />

locations where less harm to wildlife interests would be caused, or by reasonable<br />

alternative means; and<br />

Where it is possible to impose conditions, or where planning obligations have been<br />

entered into which prevent damaging impacts on wildlife habitats or important natural<br />

features.<br />

Walker Riverside is defined as a site of Local Conservation Interest (SLCI) <strong>for</strong> <strong>the</strong><br />

purpose of NC1.1:<br />

Development which would harm <strong>the</strong> nature conservation value of a wildlife corridor will<br />

be allowed only in exceptional circumstances.<br />

Wildlife corridors are identified <strong>for</strong> <strong>the</strong> purpose of Policy NC1.5 and include Walker<br />

Riverside.<br />

Development which would harm sites or areas of archaeological interest and <strong>the</strong>ir<br />

setting will not be allowed.<br />

C4.1 Hadrian’s Wall is identified as a Scheduled Ancient Monument <strong>for</strong> <strong>the</strong> purposes of Policy<br />

C4.<br />

Transport<br />

T5<br />

The needs of pedestrians, cyclists and horse riders will be acknowledged city-wide and<br />

in new developments.<br />

T5.4 The citywide network of cycle routes will be extended by development of <strong>the</strong> following<br />

routes shown on <strong>the</strong> proposal map which are designated as cycle routes.<br />

Walker Riverside <strong>Feasibility</strong> <strong>Study</strong><br />

Section 1 - p. 25


5.2.2Local Economic Development Strategy<br />

The Local Economic Development Strategy was published in 1999. The focus of <strong>the</strong> economic<br />

strategy is <strong>the</strong> strategic business sites. The Council has identified 5 sites, including Walker<br />

Riverside which are being promoted <strong>for</strong> cluster development which are as follows:<br />

Strategic Sites Size (ha) Commentary<br />

Newcastle Great Park and<br />

Newcastle Airport<br />

Newburn Riverside<br />

Ouseburn Valley<br />

Newcastle Town Centre –<br />

including Grainger Town<br />

Walker Riverside Strategic<br />

Investment Site<br />

240<br />

92<br />

100<br />

3.6<br />

70<br />

Promoted as a mixed use site – earmarked <strong>for</strong> business,<br />

residential and commercial development and open<br />

parkland. The site has a business park and has attract<br />

international software companies including Sage.<br />

One of <strong>the</strong> largest land reclamation projects. New<br />

industrial and business park. The business park has<br />

planning consent <strong>for</strong> B1, B2 and B8 – office, general<br />

industrial and warehousing. Occupiers include One<br />

NorthEast and DEFRA.<br />

Allocated in <strong>the</strong> Newcastle UDP <strong>for</strong> mix use development<br />

– including industrial, leisure and recreational. It provides<br />

300 micro-businesses and is one of 3 cultural clusters<br />

Proposals <strong>for</strong> this area includes <strong>the</strong> provision of high<br />

quality office space and a range of o<strong>the</strong>r uses including<br />

residential, retail and leisure.<br />

The area is allocated in <strong>the</strong> UDP <strong>for</strong> economic<br />

development, industrial and business uses. The area is<br />

traditionally associated with shipbuilding and engineering<br />

and now focussing on offshore development. Major<br />

companies located here include Wellstream and Duco.<br />

The public quay provides <strong>the</strong> heaviest lift capacity on <strong>the</strong><br />

east coast and stretches <strong>for</strong> approx. 1000 metres. The<br />

focus of this area will be <strong>for</strong> primarily <strong>the</strong> marine, offshore<br />

and renewable sectors.<br />

Fig. 5.2 - Strategic sites location<br />

1<br />

2 5<br />

4<br />

3<br />

1. Newcastle Great Park<br />

2. Newburn Riverside<br />

3. Ouseburn Valley<br />

4. Grainger and City Centre<br />

5. Walker Riverside<br />

26 Colin Buchanan


www.cbuchanan.co.uk<br />

5.2.3 The Newcastle Biodiversity Action Plan<br />

(Oct 2001)<br />

The Newcastle Biodiversity Action Plan was published in October<br />

2001 and aims to protect, maintain and improve biodiversity or<br />

wildlife within <strong>the</strong> city. The guidance provided within this Plan is<br />

relevant to developing strategies <strong>for</strong> <strong>the</strong> Walker Riverside site, in<br />

terms of providing advice on wildlife and biodiversity which could<br />

be affected by its future development. The review of <strong>the</strong> UDP has<br />

identified that part of <strong>the</strong> study area is a site of Local<br />

Conservation Interest (SLCI)<br />

Habitat Action Plans<br />

A number of Habitat Action Plans are relevant to <strong>the</strong> Walker<br />

Riverside study area, including: <strong>Industrial</strong> land; manmade<br />

structures; Parks, Open Space and roadside verges; and <strong>the</strong><br />

Tyne Estuary and <strong>the</strong> Tidal Streams<br />

<strong>Industrial</strong> Land<br />

The action plan is concerned only with <strong>the</strong> management of ‘green<br />

areas’ within <strong>the</strong> boundaries of: industrial estates and business<br />

parks; o<strong>the</strong>r business premises; golf courses; vacant land;<br />

derelict land and railway lines, used and disused.<br />

The Plan notes that underused industrial estates within <strong>the</strong> city<br />

provide a valuable habitat, due to <strong>the</strong> succession of vegetation on<br />

vacant sites/underused sites and are classified as grassland or<br />

scrub. It also encourages wildlife friendly management of green<br />

space on all types of industrial land, audit council owned land<br />

and introduce biodiversity management plans on appropriate<br />

sites. All planning development briefs should include biodiversity<br />

terms and encourage sustainable management practices.<br />

Man Made Structures<br />

Man made structures provide important habitats <strong>for</strong> wildlife,<br />

principally <strong>for</strong> breeding and shelter. The plan aims to improve<br />

local knowledge of species using man made structures, establish<br />

mechanism to liaise with city ecologist, ensure that development<br />

proposals will not impact on species using a building, and that in<br />

new development, opportunities <strong>for</strong> habitat creation are taken.<br />

Parks, Open Space and Roadside Verges<br />

e.g. preventing salmon migration.<br />

- Diffuse pollution (agriculture, urban/road drainage) - may<br />

lead to toxic contamination and/or nutrient enrichment.<br />

- Contaminated land - large stretches of riverside are<br />

disused industrial sites (brownfield sites) and are affected<br />

by past activities on <strong>the</strong> site. The land may be<br />

contaminated requiring cleaning be<strong>for</strong>e redevelopment can<br />

progress or be<strong>for</strong>e ecological improvements can occur.<br />

Some sites are beneficial to wildlife, as <strong>the</strong>y can be<br />

relatively undisturbed in an o<strong>the</strong>rwise highly developed area<br />

- Estuarine sediment contamination – historical<br />

contamination is present and can affect <strong>the</strong> water quality<br />

or <strong>the</strong> interests of o<strong>the</strong>r river users<br />

- Navigation - navigation rights exist in <strong>the</strong> estuary and<br />

vessel activity may cause disturbance to wildlife and<br />

indirect damage to estuary habitats. Sub-tidal dredging is<br />

necessary to maintain navigation channels.<br />

- Impoundments/barrages – plans <strong>for</strong> <strong>the</strong> regeneration of <strong>the</strong><br />

Lower Ouseburn include investigation of <strong>the</strong> impoundment<br />

of <strong>the</strong> tidal stretch of <strong>the</strong> river. This will alter <strong>the</strong><br />

hydrophysical nature of <strong>the</strong> impounded stretch and<br />

<strong>the</strong>re<strong>for</strong>e <strong>the</strong> habitat.<br />

- Development - <strong>the</strong> decline in traditional riverside industry<br />

on <strong>the</strong> Tyne has made a number of development sites<br />

available. Increasing intensification of land use in<br />

- Newcastle puts pressure on <strong>the</strong>se sites, with potential<br />

loss of important riverine and associated habitat.<br />

- Climate change - increased storminess and sea level rise<br />

can affect <strong>the</strong> tidal heights within <strong>the</strong> estuary. The warming<br />

of <strong>the</strong> water is likely to extend <strong>the</strong> range of some marine<br />

fish species into <strong>the</strong> region’s estuaries.<br />

- Recreational pressure – <strong>the</strong> improvement of water quality<br />

in <strong>the</strong> Tyne will lead to an increase in recreational pressure<br />

with <strong>the</strong> potential to increase disturbance to wildlife and<br />

damage to habitat if not controlled.<br />

- Tri-Butyl-Tin (TBT) contamination from ship building<br />

industry and boating activities.<br />

Parks,open space and roadside verges are comprised of a range<br />

of habitats including trees and grassland, but also ponds and<br />

wetlands in some cases. Walker Riverside Park is designated as<br />

a countryside site and is managed by <strong>the</strong> Ranger Service.<br />

Tyne Estuary and <strong>the</strong> Tidal Streams<br />

The Tyne Estuary and <strong>the</strong> Tidal Streams provides a valuable<br />

habitat <strong>for</strong> both marine and terrestrial wildlife. Watercourses fulfil<br />

a variety of important socio-economic functions, including<br />

transport, pollution dispersal, amenity and as a biodiversity<br />

resource. The estuary is a very important habitat, incorporating a<br />

wide range of species. The reduction in industrial activity has<br />

improved <strong>the</strong> water quality of <strong>the</strong> River Tyne of <strong>the</strong> last 15 years<br />

and possibility contributed to <strong>the</strong> reappearance of otters on <strong>the</strong><br />

Tyne. Issues to consider include <strong>the</strong> following:<br />

- Point source pollution (sewage, trade, vessels) - can result<br />

in a deterioration in water quality leading to poor ecological<br />

health and may act as a barrier within <strong>the</strong> wildlife corridor<br />

A number of objectives are identified including: ensuring that river<br />

corridor and in-river development does not degrade <strong>the</strong><br />

conservation status of estuary, tidal streams and riparian<br />

habitats, and ensuring that dredging and development within <strong>the</strong><br />

estuary does not degrade <strong>the</strong> conservation status of mudflats and<br />

water quality amongst o<strong>the</strong>r things.<br />

Species Actions Plans have also been developed <strong>for</strong> a number of<br />

species including:<br />

- Red Squirrel ( Sciurus vulgaris)<br />

- Otter (Lutra lutra)<br />

- Brown Hare ( Lepus europeus)<br />

- Great Crested Newt ( Triturus cristatus)<br />

- Barn Owl ( Tyto alba)<br />

- Skylark ( Alauda arvensis)<br />

- Song Thrush (Turdus philomelos)<br />

- Grey <strong>Part</strong>ridge (Perdix perdix)<br />

- Tree Sparrow ( Passer montanus)<br />

Walker Riverside <strong>Feasibility</strong> <strong>Study</strong> Section 1 - p. 27


5.2.4 Walker Riverside Masterplan – Policies<br />

Consultation Draft (1998)<br />

A draft masterplan <strong>for</strong> <strong>the</strong> Walker Riverside <strong>Area</strong> was published in<br />

1998 <strong>for</strong> consultation. The masterplan was intended to guide <strong>the</strong><br />

development of <strong>the</strong> industrial estate <strong>for</strong> <strong>the</strong> next 5 years. This<br />

plan was not adopted. However, it provides a useful context<br />

paper.<br />

The masterplan rolls <strong>for</strong>ward <strong>the</strong> feasibility study which was<br />

undertaken in 1997 by Economic Research Services, and<br />

The policies of <strong>the</strong> draft masterplan concentrated on six <strong>the</strong>mes,<br />

which included <strong>the</strong> following:<br />

focuses on issues such as site preparation, landuse priorities, - Quay facilities<br />

environmental improvements, quay and access improvements<br />

and local skill development. The masterplan also notes <strong>the</strong><br />

success of <strong>the</strong> SRB programme on <strong>the</strong> riverside, which has<br />

resulted in <strong>the</strong> completion of a number of significant projects.<br />

The masterplan identified a number of opportunities in <strong>the</strong> area<br />

- Establishing an offshore and marine related cluster<br />

Priority should be given to establishing and promoting<br />

offshore and marine related cluster. This will be promoted<br />

through <strong>the</strong> provision of financial and non-financial support<br />

and appointment of a dedicated marketing officer.<br />

Improvement of quay facilities <strong>for</strong> those companies with<br />

quayside locations who wish to expand.<br />

Assess <strong>the</strong> current level of use of <strong>the</strong> public quay in order<br />

to consider <strong>the</strong> viability of an upriver extension.<br />

which are integrated into <strong>the</strong> policies. In particular, this includes - Availability of local labour pool and relevant skills<br />

<strong>the</strong> following:<br />

Provide a co-ordinated approach to <strong>the</strong> provision of an<br />

- The presence of an established offshore cluster that appropriately skilled local labour pool, to maximise local<br />

includes customers, suppliers and research and<br />

development competitors.<br />

employment opportunities <strong>for</strong> residents in <strong>the</strong> East End<br />

and Walker area.<br />

- The public quay is an asset to <strong>the</strong> Walker Riverside <strong>Area</strong> Provide support to residents of <strong>the</strong> East End through<br />

and provides a deep water berth of 8m minimum, 1000m in<br />

length and has a heavy lift capacity.<br />

- The area is largely council owned, so provides <strong>the</strong><br />

existing schemes <strong>for</strong> reskilling and upskilling to improve<br />

access to jobs opportunities within <strong>the</strong> Walker Riverside<br />

opportunity to guide development , ensure <strong>the</strong> - Creation of development opportunity sites<br />

implementation of <strong>the</strong> plan and provide an integrated<br />

approach to maintenance.<br />

area.<br />

Priority should be given to <strong>the</strong> creation of development<br />

opportunity sites that promote <strong>the</strong> marine and offshore<br />

- Provides access to <strong>the</strong> north sea and European markets, sector, focusing on Malaya Drive and Welbeck Road.<br />

thus offering locational advantages.<br />

Where existing occupiers of key sites within <strong>the</strong> area do<br />

- Opportunity to improve access and increasing <strong>the</strong> use of not fit into <strong>the</strong> marine or offshore related sector,<br />

<strong>the</strong> public quay<br />

- Availability of sites and premises provides <strong>the</strong> capacity <strong>for</strong><br />

future growth and expansion of new and existing<br />

businesses.<br />

- Regeneration of Walker Riverside provides <strong>the</strong> opportunity<br />

to enhance <strong>the</strong> marine and terrestrial environment of <strong>the</strong><br />

River Tyne <strong>for</strong> <strong>the</strong> benefit of both business, wildlife and <strong>the</strong><br />

image of <strong>the</strong> whole area.<br />

opportunities will be taken to make <strong>the</strong>se sites available<br />

<strong>for</strong> companies within <strong>the</strong> sector – this excludes well<br />

established firms and supply chain firms.<br />

The <strong>for</strong>mer Swan Hunter car park site will be brought<br />

<strong>for</strong>ward <strong>for</strong> development.<br />

Hadrian’s Way cycle path will be designed to avoid<br />

prejudicing <strong>the</strong> development of opportunity sites.<br />

- Highways and accessibility<br />

However, <strong>the</strong> plan identifies a number of problems including<br />

fragmentation of sites; topographical issues which makes site<br />

assembly difficult and costly to remediate; <strong>the</strong> quay wall has<br />

fallen into disrepair; poor accessibility, poor image regarding <strong>the</strong><br />

condition of individual buildings and <strong>the</strong> estate as a whole; few<br />

large available sites; prolonged vacancy/incompatible uses and<br />

crime and vandalism.<br />

Access within <strong>the</strong> Walker Riverside should be improved as<br />

current access arrangements are not appropriate to<br />

accommodate vehicles that service <strong>the</strong> marine industry.<br />

Neptune Road will be realigned and improved at its junction<br />

with Oil Mill Lane following <strong>the</strong> demolition of <strong>the</strong> railway<br />

bridge to improve access to <strong>the</strong> north of <strong>the</strong> site.<br />

The Council aims to promote cycling by developing <strong>the</strong><br />

cycle network and requiring new or expanding businesses<br />

to provide cycle parking.<br />

Improve public transport provision.<br />

Investigate <strong>the</strong> problems of on street parking and promote<br />

appropriate improvement measures.<br />

28 Colin Buchanan


www.cbuchanan.co.uk<br />

6. Transport and<br />

Movement Audit<br />

Walker Riverside <strong>Feasibility</strong> <strong>Study</strong><br />

Section 1 - p. 29


6. Transport and Movement<br />

Audit<br />

6.1 Document Review<br />

6.1.1Local Transport Plan (2001-2006)<br />

The key objectives of <strong>the</strong> Tyne and Wear Local Transport Plan<br />

(LTP) 2001-2006 are to:<br />

- Improve access to services and facilities <strong>for</strong> all, particularly<br />

those with mobility problems;<br />

- Promote economic growth through regeneration and<br />

improved prosperity;<br />

- Improve links between public transport networks and<br />

improve integration of land use and transportation planning;<br />

and<br />

- Improve road safety and reduce <strong>the</strong> fear of transport related<br />

crime.<br />

The core strategies adopted to achieve <strong>the</strong>se objectives are:<br />

- Changing land use patterns to reduce <strong>the</strong> need to travel<br />

and to provide greater choice;<br />

- Increasing transport choice by providing alternatives to <strong>the</strong><br />

car and to road freight transport;<br />

- Managing traffic to inhibit growth and to reduce its adverse<br />

effects on safety and environment;<br />

- Providing increased road capacity but only where this is<br />

essential after allowing <strong>for</strong> <strong>the</strong> effects of <strong>the</strong> above traffic<br />

reduction measures; and<br />

- Safeguarding <strong>the</strong> historic investment in infrastructure by<br />

maintaining it in a safe and usable condition.<br />

Within <strong>the</strong> LTP District Annexe <strong>for</strong> Newcastle a number of major<br />

and minor schemes are outlined as part of <strong>the</strong> City Council’s<br />

implementation plan. Schemes relevant to <strong>the</strong> Walker Riverside<br />

area include:<br />

- Integrated transport: enhanced transport facilities are<br />

sought along Fossway, Shields Road and Walker Road,<br />

which are key corridors in <strong>the</strong> Going <strong>for</strong> Growth proposals<br />

<strong>for</strong> <strong>the</strong> City’s East End. The principal aims are safety<br />

measures, public transport priorities and facilities, access<br />

<strong>for</strong> pedestrians and cyclists, and environmental<br />

improvements.<br />

- Hadrian’s Way Cycle Route: development and improvement<br />

of this key cycle route into a high quality tourist cycle<br />

route. Works associated with this in <strong>the</strong> Walker area have<br />

been completed.<br />

6.1.2Towards 2016: The Challenge<br />

The Nexus report ‘Towards 2016: The Challenge’ sets out a<br />

fifteen year plan <strong>for</strong> developing public transport in <strong>the</strong> Tyne and<br />

Wear area.<br />

The report outlines a substantial extension of <strong>the</strong> current Metro<br />

network, known as Project Orpheus, using an extended light rail<br />

system toge<strong>the</strong>r with <strong>the</strong> best of bus technology. The Project<br />

Orpheus proposals <strong>for</strong> new LRT lines included a route from<br />

Walker to <strong>the</strong> city centre and beyond, potentially connecting to<br />

<strong>the</strong> existing network at Byker. The report shows an indicative<br />

route only <strong>for</strong> <strong>the</strong> extension.<br />

The Orpheus proposals are now being reviewed due to funding<br />

difficulties and lower-cost non-LRT schemes are likely to come<br />

<strong>for</strong>ward.<br />

6.1.3Walker Riverside Places <strong>for</strong> People Master<br />

Plan (Llewelyn Davies, 2004)<br />

The Places <strong>for</strong> People Master Plan identifies public transport as<br />

especially important to <strong>the</strong> area as <strong>the</strong>re is currently low car<br />

ownership and high bus use.<br />

As part of <strong>the</strong> study’s strategies and proposals, <strong>the</strong> following are<br />

recommended:<br />

- High quality public transport route, to run along <strong>the</strong> Walker<br />

Road corridor (A186) providing a dramatically improved<br />

level of accessibility, and good interchange with <strong>the</strong> Metro.<br />

Real time in<strong>for</strong>mation, high quality waiting areas and a<br />

bespoke livery are considered <strong>for</strong> this route.<br />

- Safe walk and cycle networks – well designed, attractive<br />

pedestrian links to encourage walking and clear, direct<br />

routes <strong>for</strong> cyclists that link into <strong>the</strong> existing network.<br />

- Speed and traffic management – to limit speeds in<br />

residential areas.<br />

- Parking management – a balance of on and off-street<br />

parking to be provided, considering security, safety, land<br />

economy and environment<br />

6.2 Strategic Network<br />

Despite its somewhat circuitous alignment <strong>the</strong> A186 Walker<br />

Road <strong>for</strong>ms a strategically important east-west corridor in<br />

Newcastle and is <strong>the</strong> ‘natural’ route <strong>for</strong> traffic heading east out of<br />

<strong>the</strong> sou<strong>the</strong>rn side of <strong>the</strong> city centre. The road connects with <strong>the</strong><br />

A167 (M) Central Motorway East, some four kilometres to <strong>the</strong><br />

west of Walker, which is a major distributor road built to urban<br />

motorway standards. To <strong>the</strong> north of Walker <strong>the</strong> A186 joins <strong>the</strong><br />

A187 in Wallsend.<br />

Toge<strong>the</strong>r with <strong>the</strong> A193 Shields Road by-pass, <strong>the</strong> A187 Fossway<br />

<strong>for</strong>ms a much more direct east-west route and also connects to<br />

<strong>the</strong> Central Motorway East. Just to <strong>the</strong> north of Fossway, and<br />

running broadly parallel to it, <strong>the</strong> A193 Shields Road offers an<br />

alternative east-west route, though it is generally fronted by more<br />

residential properties than Fossway.<br />

30 Colin Buchanan


www.cbuchanan.co.uk<br />

Fig. 6.1 - Local highway network<br />

N<br />

Main roads (A 186 - A 187)<br />

Internal access road<br />

Inadequate highway alignments<br />

Access to individual sites<br />

Sites with difficult access<br />

Cycleway NCN Route 72<br />

Walker Riverside <strong>Feasibility</strong> <strong>Study</strong><br />

Section 1 - p. 31


The Council’s preferred route to/from <strong>the</strong> spine road of <strong>the</strong> study<br />

area <strong>for</strong> abnormal loads is Malaya Drive. From Malaya Drive<br />

<strong>the</strong>re is a northbound route via Bath Street and Waverdale Drive,<br />

<strong>the</strong>n ei<strong>the</strong>r west via <strong>the</strong> A187 Fossway or east via Neptune Road.<br />

Notwithstanding <strong>the</strong> desire to reduce heavy vehicle traffic on<br />

Walker Road and thus facilitate <strong>the</strong> regeneration of active<br />

frontages, it appears that it will be inappropriate to re-route all<br />

heavy traffic on Fossway, as this will require substantial physical<br />

alterations to <strong>the</strong> carriageway and dramatically change <strong>the</strong> nature<br />

of that corridor.<br />

6.3 Local Transport and Movement Audit<br />

This section details <strong>the</strong> existing highways infrastructure, public<br />

transport and cycle provision.<br />

6.3.1 Existing highways infrastructure<br />

The study area is mainly served by a single north-south spine<br />

route consisting of Wincomblee Road/White Street/Fisher Street<br />

which is accessed from <strong>the</strong> A186 (currently a major arterial route)<br />

at four points. The entire study area is subject to a 30mph speed<br />

limit.<br />

A186<br />

The A186 Walker Road/Station Road/Bath Street is a 10.5 metre<br />

wide single carriageway road carrying some 11,000 vehicles per<br />

day. Along Station Road traffic flow is interrupted due to on-street<br />

parking, and a high number of junctions. Fur<strong>the</strong>r north along<br />

Bath Street, <strong>the</strong>re is less interruption to traffic flow.<br />

The A186 <strong>for</strong>ms priority junctions with Malaya Drive and Station<br />

Road, both of which have good visibility and adequate geometry<br />

to accommodate HGVs. Both also have right-turn ghost islands,<br />

although <strong>the</strong> one at Malaya Drive is narrow.<br />

At Welbeck Road <strong>the</strong> main road <strong>for</strong>ms a four-arm roundabout,<br />

with a small, kerbed central island, that is built to minimum<br />

design standards in terms of inscribed circle diameter and central<br />

island and has poor deflection in all directions.<br />

Internal study area<br />

The highway infrastructure in <strong>the</strong> area to <strong>the</strong> south of, and<br />

including, Malaya Drive is generally better than in <strong>the</strong> remainder<br />

of <strong>the</strong> study area, a reflection of <strong>the</strong> improvements already carried<br />

out <strong>the</strong>re. The carriageways and footways are in good condition,<br />

and <strong>the</strong> junctions appear to operate satisfactorily. However, <strong>the</strong><br />

route to <strong>the</strong> Walker Public Quay is convoluted due, in part, to <strong>the</strong><br />

steep topography of <strong>the</strong> area. A new link from this point north,<br />

perhaps through to Stai<strong>the</strong>s Street, would significantly improve<br />

accessibility to this area.<br />

Additionally, <strong>the</strong> straight road alignments encourages high<br />

speeds, and footways are present on <strong>the</strong> east side only of both<br />

Wincomblee Road and Nelson Road. The pedestrian link<br />

between Wincomblee Road and Nelson Road, via steps, is in<br />

need of maintenance, having overgrown vegetation, litter and<br />

broken street lighting. Fur<strong>the</strong>r, <strong>the</strong>re may be operational<br />

problems at <strong>the</strong> nor<strong>the</strong>rn end of Nelson Road/Swan Road when<br />

HGVs are off-loading. Malaya Drive has footway provision on <strong>the</strong><br />

sou<strong>the</strong>rn side only.<br />

North of Malaya Drive, Wincomblee Road narrows in width to<br />

around 5.5 metres in places, with footways on both sides of<br />

sub-standard width. The access junction to riverside frontages<br />

off Wincomblee Road, located approximately 85 metres south<br />

of <strong>the</strong> junction with White Street is currently an un-marked<br />

priority junction of very poor standard. The junction has poor<br />

visibility and a constrained geometry which creates operational<br />

difficulties. HGVs were observed struggling to negotiate <strong>the</strong><br />

junction and significantly affecting o<strong>the</strong>r traffic when doing so.<br />

A left-turn out of <strong>the</strong> junction would be difficult <strong>for</strong> cars and not<br />

possible <strong>for</strong> HGVs due to <strong>the</strong> junction layout. The steep<br />

topography in <strong>the</strong> vicinity of <strong>the</strong> junction means that<br />

improvements would be difficult.<br />

The junction of Wincomblee Road and White Street is priority<br />

controlled. Swept path analysis at <strong>the</strong> junction indicates that a<br />

FTA design articulated vehicle would have to encroach<br />

significantly onto opposing traffic lanes when turning at <strong>the</strong><br />

junction. White Street has a relatively straight, wide<br />

carriageway and wide footways on both sides, with relatively<br />

few frontages and junctions, with <strong>the</strong> potential <strong>for</strong> high traffic<br />

speeds.<br />

Stai<strong>the</strong>s Street provides access to riverside frontages, but<br />

currently has tight radii at three bends in <strong>the</strong> road, partly a<br />

result of <strong>the</strong> steep topography. The footways are in very poor<br />

condition. However, <strong>the</strong> road does have a good, wide priority<br />

junction with White Street, with a splitter island and <strong>the</strong>re<br />

appears to be space to improve <strong>the</strong> geometry of <strong>the</strong> road in <strong>the</strong><br />

vicinity of <strong>the</strong> junction.<br />

The junction of White Street/Welbeck Road/Fisher Street is<br />

currently a standard roundabout, with a central island built to<br />

minimum standard. The junction has very poor deflection in<br />

<strong>the</strong> north-south direction. Anecdotal evidence suggests that<br />

large articulated HGVs are unable to per<strong>for</strong>m a u-turn at <strong>the</strong><br />

junction. Swept path analysis confirms that a FTA design<br />

articulated vehicle would struggle to per<strong>for</strong>m a u-turn at <strong>the</strong><br />

junction. It is not, however, immediately apparent why u-turn<br />

manoeuvres would be necessary at <strong>the</strong> junction. Welbeck<br />

Road has a very wide, straight carriageway, with wide footways<br />

on both sides.<br />

Fisher Street has a reasonably wide carriageway, which has<br />

been narrowed in <strong>the</strong> vicinity of its junction with Ambrose<br />

Place. It has a relatively steep gradient in <strong>the</strong> vicinity of<br />

Welbeck Road. High levels of frontage activity and traffic<br />

calming measures interrupt traffic flow along this road. Fur<strong>the</strong>r<br />

north, at Neptune Road, <strong>the</strong> carriageway widens eventually<br />

<strong>for</strong>ming a standard roundabout junction with Maurice Road.<br />

Traffic calming<br />

Traffic calming has been implemented along Fisher Street in<br />

<strong>the</strong> <strong>for</strong>m of a single chicane, adjacent to Abingdon Road, and a<br />

mini-roundabout at <strong>the</strong> junction with Oil Mill Road. However,<br />

<strong>the</strong> implementations appear to have limited effect. The miniroundabout<br />

has been installed with no alteration to <strong>the</strong> existing<br />

geometry of <strong>the</strong> junction and with an over-runable central<br />

island. Observations suggest that vehicles are still negotiating<br />

<strong>the</strong> junction at inappropriate speeds. Swept path analysis<br />

indicates that two FTA design articulated vehicles could pass<br />

32 Colin Buchanan


www.cbuchanan.co.uk<br />

Fig. 6.2 - Public transport and cycle facilities<br />

N<br />

Bus route 12<br />

Bus route 18/19<br />

Bus route 34<br />

Bus route 35A/ 35B<br />

Bus route 39<br />

Bus route 40<br />

Bus stops<br />

Cycleway NCN Route 72<br />

Walker Riverside <strong>Feasibility</strong> <strong>Study</strong><br />

Section 1 - p. 33


each o<strong>the</strong>r whilst negotiating <strong>the</strong> junction.<br />

Additionally, road humps have been implemented along <strong>the</strong> roads<br />

surrounding <strong>the</strong> adjacent residential area - on Oil Mill Road,<br />

Abingdon Road, and Woodside Avenue.<br />

Parking<br />

Much of <strong>the</strong> study area has unrestricted parking and what<br />

restrictions are in place are generally poorly signed with faded<br />

road markings, indicating a need <strong>for</strong> a review of <strong>the</strong> parking<br />

arrangements in <strong>the</strong> area. There is ‘no waiting at any time’<br />

restrictions along both sides of Bath Street. There is also no<br />

waiting, Monday to Friday, 8am-6:30pm along much of Fisher<br />

Street.<br />

Significant on-street parking demand was only observed at White<br />

Street, on both sides of <strong>the</strong> road between Mitchell Street and<br />

Mary’s Place, and to a lesser extent on Station Road. Also, <strong>the</strong><br />

public car park off Abingdon Road was observed to be well used.<br />

Many of <strong>the</strong> businesses within <strong>the</strong> study area currently have only<br />

limited space <strong>for</strong> parking within <strong>the</strong>ir premises.<br />

6.3.2Public transport and cycle provision<br />

The study area is currently relatively well served by public<br />

transport ( see Figure 6.2) with high frequency services running<br />

along Walker Road/Station Road and White Street/Fisher Street<br />

that link <strong>the</strong> area to metro stations and <strong>the</strong> city centre. However,<br />

no services cover <strong>the</strong> area south of White Street, leaving <strong>the</strong><br />

sou<strong>the</strong>rn extreme of <strong>the</strong> study area around one kilometre from<br />

<strong>the</strong> nearest bus stop.<br />

Along White Street/Fisher Street, Superoute 12 offers four<br />

services an hour during <strong>the</strong> day and hourly services in <strong>the</strong><br />

evening between Wallsend metro station and Two Ball Lonnen,<br />

via <strong>the</strong> city centre and Byker metro station. There is also an<br />

hourly daytime service between Wallsend and Central Station<br />

along this route.<br />

north-south through <strong>the</strong> study area along <strong>the</strong> alignment of a<br />

dismantled railway. This is a long-distance, coast to coast cycle<br />

route, connecting <strong>the</strong> area with Newcastle city centre and<br />

beyond. Within <strong>the</strong> study area <strong>the</strong> route has wide, tarmac<br />

surfacing in good condition and is mostly lit. The route crosses<br />

Malaya Drive, Welbeck Road, and Neptune Road at-grade. At<br />

Neptune Road a toucan crossing is provided, with tactile paving<br />

and guard-rail. Similar facilities have been removed from Malaya<br />

Drive and Welbeck Road due to vandalism, with only <strong>the</strong> tactile<br />

paving and associated road markings remaining.<br />

The cycle route is accessible from a limited number of points<br />

only. From Malaya Drive, Welbeck Road it can be accessed atgrade<br />

via gradual, sloping paths, while at White Street it is<br />

accessed via steep steps. We understand that <strong>the</strong> route is well<br />

used by both leisure and commuter cyclists.<br />

6.3.3Accidents<br />

Accident data <strong>for</strong> <strong>the</strong> three-year period to 2004 have been<br />

obtained from <strong>the</strong> Tyne and Wear Traffic and Accident Data Unit.<br />

This indicated that <strong>the</strong>re were a total of 11 accidents within <strong>the</strong><br />

study area, none of which involved HGVs (although one record<br />

implicated a HGV as part of <strong>the</strong> cause of <strong>the</strong> accident).<br />

There was one fatal accident within <strong>the</strong> study area, at <strong>the</strong><br />

junction of Bath Street and White Street, involving a police car in<br />

pursuit of ano<strong>the</strong>r vehicle. A cluster of three serious accidents<br />

and one slight accident occurred at <strong>the</strong> junction of Malaya Drive<br />

and Station Road. Also, <strong>the</strong>re were two slight accidents at <strong>the</strong><br />

junction of Bath Street/Welbeck Road, and one slight accident at<br />

<strong>the</strong> junction of White Street/Wincomblee Road.<br />

‘Superoute’ is a network of high quality bus services across <strong>the</strong><br />

Tyne and Wear region, offering frequent, high quality services with<br />

modern buses, shelters and road improvements. Bus stops<br />

within <strong>the</strong> study area generally have a bus flag and timetable<br />

in<strong>for</strong>mation only, with only some having shelters and none having<br />

kassel kerbing, despite being on ‘Superoutes’. Fur<strong>the</strong>r, none of<br />

<strong>the</strong> stops have real-time in<strong>for</strong>mation provision.<br />

An additional four services per hour run along Station Road/<br />

Walker Road, all serving <strong>the</strong> city centre. 12 services an hour run<br />

along Bath Street (including Superoute 40) between Walker bus<br />

station or Wallsend metro station and Chapel House, via <strong>the</strong> city<br />

centre and Byker metro station. Waverdale Avenue, has six<br />

services an hour, served by Superoute 40.<br />

There are no railway lines in <strong>the</strong> vicinity of <strong>the</strong> site. However, <strong>the</strong><br />

St James-Whitley Bay metro line runs to <strong>the</strong> north of <strong>the</strong> area,<br />

with Wallsend Station (which also serves as a bus interchange)<br />

located some 700 metres from <strong>the</strong> nor<strong>the</strong>rn extreme of <strong>the</strong> study<br />

area. The line offers a 12 minute daytime service frequency<br />

Mondays to Fridays (10 minute on Saturdays) to <strong>the</strong> city centre.<br />

Route 72 (‘Hadrian’s Way’) of <strong>the</strong> National Cycle Network runs<br />

Fisher Street spine<br />

34 Colin Buchanan


www.cbuchanan.co.uk<br />

7. Urban Design Audit<br />

Walker Riverside <strong>Feasibility</strong> <strong>Study</strong><br />

Section 1 - p. 35


7. Urban Design Audit<br />

7.1 General Environment<br />

The study area is located along <strong>the</strong> riverside within <strong>the</strong> area of<br />

Walker in <strong>the</strong> East End of Newcastle.<br />

Walker has a broadly level topography, with <strong>the</strong> exception of <strong>the</strong><br />

steep slopes of <strong>the</strong> Tyne gorge that are <strong>the</strong> key feature of <strong>the</strong><br />

study area itself. As <strong>the</strong> Tyne has been deepened and narrowed<br />

to accommodate shipbuilding, <strong>the</strong> industrial riverside has a<br />

combination of steep slopes and flat man-made waterside plots.<br />

<strong>Industrial</strong> growth was shaped by <strong>the</strong> railways and <strong>the</strong> river and a<br />

railway once ran along <strong>the</strong> top of <strong>the</strong> cliff and <strong>the</strong> route has now<br />

been adapted to provide part of Hadrian’s Way National Trail, <strong>the</strong><br />

off road recreational cycle and pedestrian route, which goes<br />

through <strong>the</strong> study area.<br />

Walker is predominantly residential, with homogeneous low rise<br />

and low density brick terraces and semis built in <strong>the</strong> 30s and<br />

50s, with occasional 1960s tower blocks and 1970s precincts of<br />

blocks and terraces. Cleared plots and boarded properties are a<br />

recurrent feature.<br />

The industrial riverside is a compact strip of industrial buildings of<br />

varying quality and very large and visible cranes. The area has no<br />

overall boundary demarcation, but generally occupies <strong>the</strong> slopes<br />

and riverbanks east of Hadrian’s Way, with <strong>the</strong> exception of <strong>the</strong><br />

central portion of Station Road/ Bath Street where a number of<br />

mixed industrial and trade activities are located in close proximity<br />

to <strong>the</strong> residential area. The nor<strong>the</strong>rn boundary is an administrative<br />

one and property one (Newcastle City boundary and limit of<br />

Newcastle City Council freehold ownership), with o<strong>the</strong>rwise no<br />

o<strong>the</strong>r physiscal demarcation. The sou<strong>the</strong>rn boundary is Walker<br />

Park, a traditionally laid out urban park built over disused<br />

shipyards and <strong>the</strong> only proper park of <strong>the</strong> East End. The opposite<br />

bank is by and large occupied by <strong>the</strong> Hebburn New Town<br />

Riverside Park and its sweeping grassed slopes.<br />

The river is quite active at this location: large cargo vessels are<br />

often moored at <strong>the</strong> public quay; <strong>the</strong>re is movement of people and<br />

goods on <strong>the</strong> riverbank in <strong>the</strong> south portion of <strong>the</strong> area and <strong>the</strong>re<br />

are small leisure boats moored all along <strong>the</strong> south bank.<br />

There is little mature planting in <strong>the</strong> whole area, ei<strong>the</strong>r as<br />

woodlands or street trees. Mixed scrub and lawns are <strong>the</strong> main<br />

landscape components of <strong>the</strong> industrial Walker Riverside.<br />

7.2 Approaches and Legibility<br />

Walker Riverside is approached from <strong>the</strong> city centre via Walker<br />

Road (A186) and from <strong>the</strong> A19 via Hadrian Road (A187).<br />

From Walker Road:<br />

- The route crosses run down residential areas, with many<br />

cleared sites, boarded properties and vacant shops. The<br />

street itself is relatively wide and featureless (it is however<br />

a prime target <strong>for</strong> change in <strong>the</strong> Places <strong>for</strong> People Master<br />

plan, see Section 3).<br />

- The approach to <strong>the</strong> study area is marked by <strong>the</strong> gas<br />

holder past Pottery Bank.<br />

- The arrival into <strong>the</strong> area is marked by <strong>the</strong> metal scrap yard<br />

of Station Road. Despite quite good fencing and landscape<br />

edging <strong>the</strong> scrap yards are very visible, with piles of scrap,<br />

lorry traffic, as well as noise.<br />

- There are no gateways or substantial signage that point<br />

out <strong>the</strong> Malaya Drive access to <strong>the</strong> area.<br />

- Once Wincomblee Road is reached <strong>the</strong> big yellow cranes<br />

of <strong>the</strong> quay are immediately visible and become a hallmark<br />

<strong>for</strong> <strong>the</strong> area.<br />

From Hadrian Road <strong>the</strong>re are two possible routes into <strong>the</strong> area.<br />

From Neptune Road into Fisher Street:<br />

- The route skirts all <strong>the</strong> major shipyards of Wallsend to<br />

arrive in front of <strong>the</strong> A&P Tyne site. It is clearly an<br />

industrial route, at present noticeably quiet.<br />

- The approach to <strong>the</strong> area is marked by Segedunum and its<br />

visitor tower.<br />

- There is no clear demarcation of <strong>the</strong> Walker Riverside,<br />

except <strong>the</strong> City boundary sign and a sharp bent into Fisher<br />

Street. Signage and features mainly relate to Hadrian’s<br />

Way cycle route.<br />

- The <strong>for</strong>est of cranes marks <strong>the</strong> arrival, with <strong>the</strong> pocket of<br />

housing and <strong>the</strong> playground somewhat at odds with <strong>the</strong><br />

area.<br />

From Waverdale Avenue and Welbeck Road:<br />

- The route, past <strong>the</strong> Wallsend shipyards and Segedunum,<br />

enters <strong>the</strong> Walker residential neighbourhood, in a location<br />

that has generally better housing than Walker Road.<br />

- There is nothing that marks <strong>the</strong> arrival at Welbeck Road,<br />

particularly with <strong>the</strong> Bath Street Workshops so well<br />

screened by planting.<br />

- Past <strong>the</strong> <strong>for</strong>mer railway bridge (Hadrian’s Way), brightly<br />

painted in blue, <strong>the</strong> cranes of <strong>the</strong> shipyards and <strong>the</strong><br />

Hebburn church spire open up in a sweeping view of <strong>the</strong><br />

area.<br />

36 Colin Buchanan


www.cbuchanan.co.uk<br />

Fig. 7.1 - Landmarks, features and views<br />

N<br />

Landmarks<br />

Features<br />

Primary view corridors<br />

Walker Riverside <strong>Feasibility</strong> <strong>Study</strong><br />

Section 1 - p. 37


7.3 Character<br />

The industrial Walker Riverside is decidedly different from <strong>the</strong> rest<br />

of Walker. This is because of topography, land use and building<br />

types. Despite being compact and and distinguishable, it is not<br />

an homogeneous area. The following character areas have been<br />

identified:<br />

Wincomblee Road <strong>Area</strong>, also known as <strong>the</strong> Walker<br />

Riverside <strong>Industrial</strong> Park<br />

This area is characterised by level topography (with <strong>the</strong> exception<br />

of <strong>the</strong> road itself, which reaches from <strong>the</strong> upper level) and a firm<br />

sloping boundary up to Hadrian’s Way, which shelters <strong>the</strong> area<br />

from <strong>the</strong> residential neighbourhood.<br />

It has its primary frontage onto <strong>the</strong> river, where a 1000m long<br />

quay with heavy lift cranes, which are visible from a considerable<br />

distance along <strong>the</strong> riverside.<br />

It is characterised by recent metal clad industrial units of various<br />

sizes: from <strong>the</strong> very large bespoke sheds of Wellstream to a<br />

group of speculative medium sized units. Massive reels of cables<br />

populate <strong>the</strong> yards.<br />

Roads are wide and quiet, with (we understand) <strong>the</strong> occasional<br />

burst of heavy vehicle traffic at times of unloading ships.<br />

The environment is very well cared <strong>for</strong>, with lawns and decorative<br />

planting, continuous well maintained blue security fencing <strong>for</strong><br />

most part of <strong>the</strong> area, recent lighting units, CCTV and coherent<br />

signage (in <strong>the</strong> City Council house style).<br />

Mixed scrub and young woodland planting is found on <strong>the</strong> slope<br />

up to Hadrian’s Way, where it constitutes an attractive<br />

background, an efficient barrier (doubled up by additional fencing)<br />

and an area of wildlife interest. The overall character of this area<br />

is that of a modern and efficient industrial estate, appropriate to<br />

<strong>the</strong> global role of <strong>the</strong> main players of <strong>the</strong> area.<br />

White Street <strong>Area</strong>, between Malaya Drive and Welbeck<br />

Road<br />

This area displays a radical change from <strong>the</strong> previous and<br />

adjacent one. It is characterised by several changes in level, with<br />

retaining walls and different plat<strong>for</strong>ms, from Hadrian’s Way level<br />

down to <strong>the</strong> riverside. Despite its riverside location, it has no<br />

direct river frontage or river use.<br />

It has a large majority of pre war buildings, generally unattractive,<br />

in red brick with, in many instances, metal clad roof additions.<br />

Notable exceptions are <strong>the</strong> Wincomblee Workshop, an attractive<br />

period building needing refurbishment, and <strong>the</strong> recently<br />

completed Shepherd Offshore development. Substantial retaining<br />

walls of various quality are present, and are generally in poor<br />

condition .<br />

The differences in level, retaining walls and progressive change<br />

have generated an intricate pattern of development, where<br />

access, vehicular manoeuvring and business expansion are<br />

particularly constrained. Access roads are convoluted and<br />

unattractive.<br />

Landscape is limited to self-sown scrub in abandoned or<br />

unusable parts of <strong>the</strong> area. Despite <strong>the</strong> difficulties in orientation,<br />

<strong>the</strong>re is no coherent signage system or lighting. The footways are<br />

in poor conditions at points and retaining walls have been<br />

patched up with unmatching materials.<br />

The overall appearance is that of an old industrial estate with very<br />

little quality. This is not always appropriate to <strong>the</strong> nature of <strong>the</strong><br />

businesses that occupy this area.<br />

Fisher Street shipyards<br />

This is a broadly flat and open area with direct frontage onto <strong>the</strong><br />

river.<br />

It is characterised by large open areas, where <strong>the</strong> land has been<br />

cleared (Neptune Yard is <strong>the</strong> largest cleared site in <strong>the</strong> Walker<br />

Riverside) or where slipways and dry docks lay currently empty.<br />

There are three building types: <strong>the</strong> large grey metal sheds of <strong>the</strong><br />

shipyard, two rows of brick terraced housing and <strong>the</strong> cranes. The<br />

frontage on Fisher Street is long and monotonous, also because<br />

of <strong>the</strong> lack of activity.<br />

There are very limited green areas, with <strong>the</strong> exception of an out of<br />

place playground and a few trees recently planted in <strong>the</strong> car park.<br />

There is no signage, except <strong>for</strong> site hoardings and very poor<br />

wooden fencing in proximity of <strong>the</strong> houses.<br />

This area has a lot of character, due to <strong>the</strong> views on <strong>the</strong> cranes<br />

and on <strong>the</strong> Hebburn river bend, but lies sadly silent and unused.<br />

Fisher Street industrial units<br />

This is <strong>the</strong> roadside row of post war and recent industrial units<br />

located between Fisher Street and Hadrian’s Way. There are<br />

some differences in levels as <strong>the</strong> units follow <strong>the</strong> gradient of <strong>the</strong><br />

road.<br />

The area is characterised by being very densely built with very<br />

limited yard space. The nor<strong>the</strong>rn part of <strong>the</strong> area is made up of<br />

mainly post war buildings, with a common office frontage <strong>for</strong> a<br />

part of it. There are several vacant units. The sou<strong>the</strong>rn part is<br />

made of recent units arranged around two small common yards.<br />

Vacant dilapidated buildings frame <strong>the</strong> area at ei<strong>the</strong>r end. This<br />

part of <strong>the</strong> study area offers accommodation to a very wide range<br />

of business sectors and has a limited marine character, despite<br />

enjoying impressive views on <strong>the</strong> river and <strong>the</strong> shipbuilding<br />

cranes.<br />

The Fisher Street frontage is of overall average quality, but<br />

generally well kept: appropriate fencing, tidy hoardings, etc.<br />

There are no street trees or o<strong>the</strong>r <strong>for</strong>ms of planting and <strong>the</strong>re is a<br />

need to rely on street parking, which sometimes can generate a<br />

messy appearance. The Hadrian’s Way frontage is of lower<br />

quality, with untidy and old backs of buildings exposed.<br />

The overall appearance is that of a densely developed<br />

employment area, which could easily accommodate a range of<br />

office/ research and small scale production businesses.<br />

Bath Street/Station Road between Malaya Drive and<br />

Welbeck Road<br />

This is a broadly flat area, at <strong>the</strong> western side of <strong>the</strong> ridge of<br />

Hadrian’s Way and it is surrounded by residential<br />

neighbourhoods.<br />

38 Colin Buchanan


www.cbuchanan.co.uk<br />

Fig. 7.2 - Character areas<br />

N<br />

Fisher Street shipyards<br />

Fisher Street industrial units<br />

White Street <strong>Area</strong><br />

Bath Street/Station Road<br />

Hadrian’s Way<br />

Wincomblee Road <strong>Area</strong><br />

Recent buildings<br />

Post war buildings<br />

Older premises<br />

Walker Riverside <strong>Feasibility</strong> <strong>Study</strong><br />

Section 1 - p. 39


It has a variety of building types, from <strong>the</strong> recent small units on<br />

Bath Street, to a cash&carry metal shed, a traditional style brick<br />

hotel, to <strong>the</strong> metal scrap yards. These are <strong>the</strong> single largest<br />

occupiers and <strong>the</strong> most visible ones: <strong>the</strong>ir high levels of activity<br />

tends to generate high level of lorry traffic and local noise. O<strong>the</strong>r<br />

sites in this area are vacant or underutilised.<br />

A number of mature trees and attractive landscape edges are<br />

present and soften <strong>the</strong> impact of <strong>the</strong> built development.<br />

The overall appearance is that of an unsightly and inappropriate<br />

low grade mixed commercial area.<br />

Hadrian’s Way<br />

This is a pedestrian and cycle corridor, part of <strong>the</strong> National Cycle<br />

Network and linking <strong>the</strong> centre of Newcastle with Roman sites<br />

and <strong>the</strong> Scandinavian ferry. At this location it follows <strong>the</strong><br />

alignment of <strong>the</strong> <strong>for</strong>mer railway line on <strong>the</strong> ridge of <strong>the</strong> gorge. It is<br />

<strong>the</strong>re<strong>for</strong>e relatively flat, with <strong>the</strong> exception of <strong>the</strong> access points<br />

and <strong>the</strong> areas where <strong>for</strong>mer bridges have been removed.<br />

The corridor is simply paved in tarmac and is flanked by grass<br />

strips and natural mixed vegetation. For most part of its Walker<br />

Riverside stretch, <strong>the</strong> trail passes behind industrial premises.<br />

This fact raises a number of issues: <strong>the</strong> path is often secluded<br />

and poorly overlooked, <strong>the</strong>re have been reports of vandalisms,<br />

and <strong>the</strong> unsightly backs of industrial buildings are exposed to<br />

view. <strong>Part</strong>icularly poor is <strong>the</strong> open view onto <strong>the</strong> piles of scrap<br />

metals of <strong>the</strong> two Station Road yards. The landscape buffer at<br />

this location is also thinner than elsewhere.<br />

7.4 Culture and Tourism<br />

The area is very close to Hadrian’s Wall and <strong>the</strong> archaeological<br />

remains of <strong>the</strong> <strong>for</strong>t of Segedunum in Wallsend. The<br />

archaeological potential of <strong>the</strong> area is addressed in <strong>the</strong> Stage 2<br />

report of this study, on ground conditions.<br />

Never<strong>the</strong>less, <strong>the</strong> area has a complex and interesting landscape<br />

and industrial archaeology. The river corridor, <strong>the</strong> vegetated<br />

slopes and banks, <strong>the</strong> industrial structures (bridges, cranes,<br />

walls and buildings) could all contribute to a rich cultural<br />

experience of <strong>the</strong> area. Tourism and heritage do not appear to be<br />

considered as valuable resources and <strong>the</strong>y could be fur<strong>the</strong>r<br />

exploited in terms, at least, of interpretation and image.<br />

7.5 Crime<br />

The industrial Waker Riverside does not appear to have serious<br />

crime problems in recent years. Anecdotal reports of burglary and<br />

intimidation appear to belong to <strong>the</strong> past, with all interviewd<br />

businesses and <strong>the</strong> Police confirming major improvements in<br />

recent years.<br />

This could be due to <strong>the</strong> introduction of CCTV systems or<br />

security guards in most premises.<br />

Today, vandalism and flytipping are <strong>the</strong> main cause <strong>for</strong> concern.<br />

A Police report and strategy <strong>for</strong> <strong>the</strong> wider Walker area is currently<br />

in preparation and will be made available when ready.<br />

The trail, however, incorporates <strong>the</strong> very attractive old stone<br />

railway structures and on well designed paving and art pieces at<br />

<strong>the</strong> approaches. It is pepper potted with industrial remains, but it<br />

has no interpretation panels.<br />

The trail offers a valuable recreational link, but has long stretches<br />

of poor frontages, which will take a long time be<strong>for</strong>e <strong>the</strong>y can be<br />

progressively improved.<br />

Nature and culture at Walker Riverside<br />

40 Colin Buchanan


www.cbuchanan.co.uk<br />

Fig. 7.3 - Public realm<br />

N<br />

Railings in good condition<br />

Railings in poor condition<br />

Masonry in good condition<br />

Masonry in poor condition<br />

Wooden fencing<br />

Landscape<br />

Poor state of repair<br />

Walker Riverside <strong>Feasibility</strong> <strong>Study</strong><br />

Section 1 - p. 41


42 Colin Buchanan


www.cbuchanan.co.uk<br />

8. Baseline Key Issues<br />

Walker Riverside <strong>Feasibility</strong> <strong>Study</strong><br />

Section 1 - p. 43


8. Baseline Key Issues<br />

This section summarises <strong>the</strong> key issues of <strong>the</strong> report and<br />

highlights <strong>the</strong> potential way <strong>for</strong>ward, which will in<strong>for</strong>m <strong>the</strong><br />

development of a strategy.<br />

8.1 Property and Development<br />

- The area works as a “de facto” cluster of marine/offshore<br />

industries, at least in part of <strong>the</strong> site. More than half <strong>the</strong><br />

sites are occupied by customers, suppliers and<br />

competitors of <strong>the</strong> sector.<br />

- The marine/ offshore sector has global operators, with very<br />

stiff competition and an unlimited choice of sites on a<br />

global scale. Incentives are normally offered to attract large<br />

companies, which generate many direct and indirect jobs.<br />

- There is no pro-active marketing of <strong>the</strong> area, at <strong>the</strong><br />

international or national level. However, <strong>the</strong> City Council<br />

(landowner of most of <strong>the</strong> area) have been very active in <strong>the</strong><br />

past 10-15 years and attracted two major global players to<br />

<strong>the</strong> area and SRB funding <strong>for</strong> <strong>the</strong> construction of high<br />

quality units.<br />

- Very recent speculative units could not be let to<br />

companies of <strong>the</strong> sector and achieved very low rents.<br />

- Many companies of <strong>the</strong> offshore and engineering sector<br />

seem to have stable or growing business. There are also<br />

pockets of low value occupiers.<br />

- There is a good number of sites that are vacant or have<br />

leases expiring in <strong>the</strong> near future. Some of <strong>the</strong>se sites<br />

have access, topographical and ground condition<br />

constraints. Many, however, have quay access. A<br />

comprehensive approach to <strong>the</strong> improvement and<br />

occupation of <strong>the</strong>se sites is necessary.<br />

8.2 Regeneration<br />

- The study area is located in predominantly residential<br />

Walker, an area included in <strong>the</strong> government Pathfinder<br />

Programme, <strong>for</strong> which a master plan <strong>for</strong> regeneration has<br />

been recently prepared (Places <strong>for</strong> People Master Plan).<br />

- It is <strong>the</strong> early days of <strong>the</strong> implementation of <strong>the</strong> master<br />

plan, with a first set of redeveloped housing near <strong>the</strong><br />

industrial Walker Riverside being awarded “minded to<br />

grant” planning status in December 2004.<br />

- Ultimately <strong>the</strong> master plan will create a much improved<br />

neighbourhood, reversing <strong>the</strong> trend of population loss and<br />

general decline. Homes, schools, shops, community<br />

facilities and public transport will be improved and will, at<br />

least indirectly, positively affect <strong>the</strong> study area.<br />

8.3 Planning Policy<br />

- Regional policies support <strong>the</strong> development of some<br />

specific clusters, including <strong>the</strong> marine/ offshore/ high value<br />

added engineering. Walker Riverside, however, is not<br />

included in any of <strong>the</strong>ir “prestige” employment sites.<br />

- They seek to protect wharves and deep water quays,<br />

where <strong>the</strong>re is a realistic prospect of port related activities.<br />

- Regional policies stress <strong>the</strong> importance of developing<br />

knowledge based industries and indicate that <strong>the</strong>re is<br />

overprovision of general employment land and seek deallocation<br />

of industrial sites.<br />

- Local policies identify <strong>the</strong> Walker Riverside <strong>for</strong> retention of<br />

industrial uses (B1, B2, B8) and particularly identify <strong>the</strong><br />

sou<strong>the</strong>rn end of <strong>the</strong> study area <strong>for</strong> economic development,<br />

and <strong>the</strong> nor<strong>the</strong>rn section <strong>for</strong> industrial and commercial<br />

improvement.<br />

- The environmental potential of <strong>the</strong> study area is identified<br />

by <strong>the</strong> UDP and Biodiversity Action Plan, which seek to<br />

protect and enhance <strong>the</strong> environmental and wildlife<br />

potential of <strong>the</strong> area.<br />

- The (un-adopted) Walker Riverside master Plan (1998)<br />

identifies a vision <strong>for</strong> <strong>the</strong> area as a cluster of marine/<br />

offshore businesses.<br />

8.4 Transport and Movement<br />

- The area has good strategic links to <strong>the</strong> motorways and<br />

city centre. The current freight route to <strong>the</strong> centre (A186,<br />

Walker Road) needs re-evaluation in <strong>the</strong> light of <strong>the</strong> Places<br />

<strong>for</strong> People Master Plan. The suitability of Fossway as an<br />

alternative freight route could not be confirmed.<br />

- Within <strong>the</strong> study area, <strong>the</strong> spine Wincomblee Road/ White<br />

Street/ Fisher Street could provide a suitable internal<br />

distributor road if improvements are carried out at specific<br />

inadequate stretches and junctions.<br />

- Access to <strong>the</strong> public quay is convoluted. Access to<br />

riverside sites between Malaya Drive and Welbeck Road is<br />

particularly difficult and potential infrastructure<br />

improvements should be evaluated.<br />

- There is no comprehensive parking management in <strong>the</strong><br />

area, which generate conflicts in certain portion of <strong>the</strong><br />

study area, particularly where individual sites do not have<br />

large yards and parking facilities within <strong>the</strong>ir premises.<br />

- The study area is relatively well served by public transport<br />

(with <strong>the</strong> exception of <strong>the</strong> sou<strong>the</strong>rn part), but bus waiting<br />

facilities and in<strong>for</strong>mation are poor.<br />

- Some specific proposals (boulevarding of Walker Road,<br />

access to <strong>the</strong> river <strong>for</strong> leisure, improved urban setting and<br />

pressures on <strong>the</strong> Station Road businesses) need careful<br />

and strategic management.<br />

- Proposals <strong>for</strong> a training facility on site (School of<br />

Technology), promoted by Newcastle College and <strong>the</strong> City<br />

Council, and seeking liaison with <strong>the</strong> local businesses<br />

could provide a valuable asset to <strong>the</strong> area.<br />

44 Colin Buchanan


www.cbuchanan.co.uk<br />

8.5 Urban Design and Environment<br />

8.6 Immediate Improvements<br />

- The area’s topography (<strong>the</strong> Tyne gorge and flat man made<br />

riverside plots) generate many differences in level, which on<br />

one hand shelter <strong>the</strong> area from <strong>the</strong> residential<br />

neighbourhood, but on <strong>the</strong> o<strong>the</strong>r make access and legibility<br />

particularly difficult.<br />

- There are few landmarks and features to help legibility and<br />

orientation and signage is inconsistent and of poor quality.<br />

- There are distinct character areas, with well defined<br />

boundaries: <strong>the</strong> sou<strong>the</strong>rn part of <strong>the</strong> site has a tidy<br />

appearance and well cared <strong>for</strong> environment, while <strong>the</strong> White<br />

Street <strong>Area</strong> and Bath Street/ Station Road <strong>Area</strong> have a poor<br />

image and little urban qualities: old and dilapidated<br />

buildings, confused access, poor environment. Fisher<br />

Street is ra<strong>the</strong>r dominated by cleared sites and <strong>the</strong> silent<br />

shipyard, although <strong>the</strong> inland sites are densely built and<br />

occupied.<br />

- Landscape is limited to Hadrian’s Way and a few road<br />

verges. Scrub vegetation has developed in a few abandoned<br />

sites. There is no mature planting. Additional and coherent<br />

landscape opportunities should be identified.<br />

- The landscape, industrial archaeology and cultural heritage<br />

of <strong>the</strong> area have not been built upon or exploited <strong>for</strong> <strong>the</strong><br />

promotion of <strong>the</strong> area.<br />

- There are no serious crime problems, and crime rates have<br />

sharply fallen in recent years. This is probably due to <strong>the</strong><br />

progressive installation of CCTV on <strong>the</strong> premises and <strong>the</strong><br />

employment of security guards.<br />

There are sets of potential improvement packages, which would<br />

greatly benefit <strong>the</strong> area, whatever its strategic role in <strong>the</strong> future.<br />

These are (subject to detailed feasibility and cost assessment)<br />

listed below.<br />

Functional improvements:<br />

- Improved junctions off White Street.<br />

- Improved bus waiting facilities within <strong>the</strong> area and on<br />

Walker Road/ Station Road. Introduction of “real time<br />

in<strong>for</strong>mation”, particularly at poorly frequented stops.<br />

- Evaluation of potential extension of buses to <strong>the</strong> sou<strong>the</strong>rn<br />

part of Wincomblee Road, in terms of infrastructure and<br />

potential patronage.<br />

- Development of comprehensive parking management <strong>for</strong><br />

<strong>the</strong> area.<br />

- Extension of CCTV to public spaces, and Hadrian’s Way in<br />

particular.<br />

Image and brand streng<strong>the</strong>ning:<br />

- Design and installation of a complete set of bespoke<br />

signs.<br />

- Repair to all broken and inadequate footways, steps and<br />

passages, even to sites awaiting redevelopment. Sacrificial<br />

and temporary work may be required.<br />

- Development of a programme of improvement of all edges:<br />

repairing railings, introducing see-through metal fencing<br />

(ra<strong>the</strong>r than blank wooden and masonry fencing) and<br />

landscape.<br />

- Introduction of interpretation panels on <strong>the</strong> cultural and<br />

natural heritage.<br />

- Clearance or cosmetic maintenance works to abandoned<br />

premises.<br />

Walker Riverside <strong>Feasibility</strong> <strong>Study</strong> Section 1 - p. 45


Fig. 8.1 - Issues<br />

N<br />

Old and dilapidated buildings<br />

Vacant land<br />

“Bad neighbours” to residential areas<br />

Inadequate highway alignments<br />

Difficult access to individual sites<br />

Sites with difficult access<br />

Poor property boundaries<br />

Public realm in poor state of repair<br />

46 Colin Buchanan


www.cbuchanan.co.uk<br />

Fig. 8.2 - Opportunities<br />

N<br />

Vacant land<br />

Leases expiring on or be<strong>for</strong>e 2011<br />

Neighbourhood improvements<br />

Landscape<br />

Landmarks and features<br />

View corridors<br />

Walker Riverside <strong>Feasibility</strong> <strong>Study</strong><br />

Section 1 - p. 47

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!