53<br />

4.2.8 Summary of Interventions in Infrastructure Sector<br />

Interventions & Estimated Costs by Phase<br />

Sub-Sector Relief <strong>Early</strong> <strong>Recovery</strong> <strong>Reconstruction</strong><br />

Rubble <strong>and</strong><br />

ERW<br />

Rubble <strong>and</strong> ERW removal<br />

• Heavy machinery <strong>for</strong> MOPWH<br />

• Rubble <strong>and</strong> ERW removal<br />

Energy:<br />

electricity, fuel,<br />

<strong>and</strong> gas<br />

Water, waste<br />

water <strong>and</strong><br />

sanitation<br />

• Restoration of temporary water<br />

provision<br />

• Water provision to IDPs<br />

• Clearance of transitional solid<br />

waste dump sites<br />

Estimated Cost: $20m Estimated Cost: $14m<br />

• Restoration of power lines<br />

• Equipment <strong>for</strong> network repair<br />

• Alternative temporary electricity<br />

generation<br />

• New supply line from Israel<br />

• Restoring transmission system<br />

• New storage facility<br />

Estimated Cost: $32m Estimated Cost: $153m<br />

• Restore PWA/CMWU capacity<br />

• Continued restoration of<br />

temporary water provision<br />

• Continued water provision to IDPs<br />

• Rehabilitation of water <strong>and</strong><br />

wastewater infrastructure<br />

• Rehabilitation of solid waste<br />

disposal capacity<br />

• Restoration of PWA/CMWU<br />

capacity<br />

• Continued rehabilitation of water<br />

<strong>and</strong> wastewater infrastructure<br />

• Procurement of water from Israel<br />

(15MCM/year)<br />

Housing <strong>and</strong><br />

Shelter<br />

Public<br />

Buildings<br />

Roads<br />

Estimated Cost: $40m Estimated Cost: $80m Estimated Cost: $116m<br />

• Rental subsidy/host family<br />

support <strong>for</strong> those with<br />

uninhabitable housing<br />

• One-time household items<br />

allowance <strong>for</strong> those with<br />

uninhabitable housing<br />

• Temporary shelter solutions <strong>for</strong><br />

those with uninhabitable housing<br />

• Assessment <strong>and</strong> compensation<br />

<strong>for</strong> repair of damaged houses<br />

• <strong>Reconstruction</strong> of houses<br />

• Repair of severely damaged<br />

houses<br />

Estimated Cost: $129m Estimated Cost: $143m Estimated Cost: $910m<br />

• Temporary location <strong>and</strong> furniture<br />

<strong>for</strong> affected ministries<br />

• Repairs of UNRWA installations<br />

• <strong>Reconstruction</strong> of 106 public<br />

buildings<br />

• Rehabilitation of lighting<br />

• Rehabilitation of recreational sites<br />

(parks, sports facilities)<br />

Estimated Cost: $51m Estimated Cost: $97m<br />

• Road repair<br />

Border<br />

Crossings<br />

• Initial limited operation of<br />

crossings<br />

Estimated Cost: $70m<br />

• Rehabilitation of border crossings<br />

Environment<br />

ESTIMATED<br />

SUB-SECTOR<br />

COST<br />

TOTAL SECTOR<br />

COST<br />

Estimated Cost: $5m Estimated Cost: $50m<br />

• Environmental damage <strong>and</strong><br />

hazardous waste management<br />

assessment<br />

Estimated Cost: $ 1m<br />

$169m $332m $1,411m<br />

$1.9b