Council Minutes - Town of Cambridge
Council Minutes - Town of Cambridge
Council Minutes - Town of Cambridge
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
COUNCIL MINUTES<br />
TUESDAY 20 DECEMBER 2011<br />
Lake Monger<br />
Reserve<br />
Lake Monger<br />
Reserve<br />
Legal Signing <strong>of</strong><br />
Shared Paths<br />
South sides 550 $90,000 in progress<br />
West side 550 $150,000 in progress<br />
All shared paths painted<br />
with symbols to make them<br />
legal.<br />
$20,000 (includes $10,000 grant)<br />
The shared path on Brompton Road was created by widening the existing 1.5 metre path to a 3<br />
metre width. The section between Empire Avenue and Bent Street has several narrow sections<br />
where the original 1.5 metre wide path could not be widened due to the proximity <strong>of</strong> street<br />
trees. If the trees are relocated, then the path can be made 3.0 metres wide for the entire<br />
length.<br />
The shared path on Salvado Road between Haydn Bunton Drive and Station Street was<br />
deferred due to the development <strong>of</strong> a larger shared path project on Salvado Road between<br />
Selby Street and Haydn Bunton Drive with the City <strong>of</strong> Subiaco. This was reported to <strong>Council</strong> in<br />
April 2011 (Item CR11.32).<br />
Drawing "Appendix I <strong>Town</strong> <strong>of</strong> <strong>Cambridge</strong> Long Term Bike Plan", from the Bike Plan 2009, has<br />
been updated to show the current network <strong>of</strong> shared paths. A copy <strong>of</strong> this plan is provided as<br />
an attachment to this report. The functioning shared paths are shown in red and the paths that<br />
are proposed for construction are shown in purple. The paths that are proposed for<br />
construction may be scheduled on a 5 year program with approximately $500,000 funding per<br />
year as listed in the table below.<br />
Road Section Length Funding<br />
Comment<br />
$<br />
Year 1<br />
West Coast Helston -<br />
500 100,000 The existing alternative bike route is<br />
Highway<br />
Underpass (West)<br />
on-road on Launceston Avenue.<br />
West Coast Underpass -<br />
500 100,000 Uses underpass as a safe crossing<br />
Highway<br />
Rochdale (East)<br />
<strong>of</strong> West Coast Highway. Need<br />
approval from BGPA for access<br />
from east end <strong>of</strong> underpass up to<br />
West Coast Highway.<br />
Railway Parade Haydn Bunton -<br />
West Leederville<br />
Train Station<br />
320 60,000 Required for pedestrians as well.<br />
Requires removal <strong>of</strong> some shrubs<br />
and trees.<br />
(South)<br />
Dodd Street Harborne - End 350 70,000 Missing link and will complement<br />
Southport Street<br />
Tower - Lake<br />
Monger Drive<br />
(West)<br />
Dodd Street roadworks in 2012.<br />
100 50,000 Widen narrow sections (1.7m) and<br />
install guard-rail at traffic signals to<br />
protect path users. Requires<br />
MRWA approval.<br />
Pearson Place Turriff - Peebles 280 50,000 Missing link behind Herdsman<br />
(East)<br />
Shopping Centre.<br />
Grantham Street Selby - Seymour 220 50,000 Widen existing 1.5 m path to 3.0m.<br />
(South)<br />
Crosby Street Peebles -<br />
Grantham (East)<br />
100 20,000 Missing link between Pearson Place<br />
and Grantham Street.<br />
Underwood<br />
Avenue<br />
Meagher -<br />
Brookdale (North)<br />
350 $0 Will be constructed as part <strong>of</strong> Perry<br />
Lakes Development Stage 3.<br />
Total 500,000<br />
H:\CEO\GOV\COUNCIL MINUTES\11 MINUTES\DECEMBER 2011\C CR.DOCX 157