Council Minutes - Town of Cambridge
Council Minutes - Town of Cambridge
Council Minutes - Town of Cambridge
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
COUNCIL MINUTES<br />
TUESDAY 20 DECEMBER 2011<br />
CR11.154 ROAD ASSET MANAGEMENT AND 20 YEAR PROGRAM FOR ROAD<br />
RESURFACING<br />
PURPOSE OF REPORT:<br />
To review required expenditure levels and the revised 20 Year Program (2010-2029) for Road<br />
Resurfacing as a prerequisite to preparing the Draft 2012/13 Budget.<br />
BACKGROUND:<br />
<strong>Council</strong> last reviewed this Road Resurfacing Program in November 2010 (Item CR10.39) 'Road<br />
Asset Management and Twenty Year Program for Road Resurfacing' and decided that:-<br />
“(i)<br />
(ii)<br />
the updated 20 Year Program (2010-2029) for Road Resurfacing be endorsed as an<br />
asset management program;<br />
the first year <strong>of</strong> the program be considered for funding in the 2011/12 Draft Budget”.<br />
The 20 Year Program (2010-2029) for Road Resurfacing was first developed in 2009 and lists a<br />
total <strong>of</strong> 144 kilometres <strong>of</strong> roads for resurfacing over a 20 year period. There is an additional 22<br />
kilometres <strong>of</strong> roads which are not on the program at this state. It was updated in November<br />
2011 to show:-<br />
<br />
<br />
<br />
<br />
<br />
Roads that were resurfaced in the 2010/2011 Budget.<br />
Roads that are funded for resurfacing in the current 2011/2012 Budget.<br />
Roads that will be funded by Metropolitan Regional Road Grants in the 2012/13 Budget.<br />
Roads that should be considered for applying for Metropolitan Regional Road Grants in<br />
2013/2014.<br />
Roads that should be considered for resurfacing as a priority in the 2012/2013 Budget.<br />
This program for the same 2010-2029 period is now presented as a planning tool for preparing<br />
the Draft 2012/13 Budget. The roads resurfaced in the 2009/10, 2010/11 and 2011/12 Budgets<br />
are retained on this program to show past trends.<br />
An independent review <strong>of</strong> road asset condition is generally carried out every 5 years with the<br />
next one due in 2014. This will generate a new twenty year program for the period<br />
2015–2034.<br />
DETAILS:<br />
The <strong>Town</strong> manages a total <strong>of</strong> 166 kilometres <strong>of</strong> sealed roads <strong>of</strong> which 8 kilometres is dual<br />
carriageway. In addition, the <strong>Town</strong> manages 21 kilometres <strong>of</strong> laneways (ROW's) <strong>of</strong> which 14<br />
kilometres is sealed and the balance is programmed to be upgraded to a seal standard over the<br />
next 10 years.<br />
The current strategy for maintaining these roads and lanes was originally derived from the<br />
ARRB road study carried out during 2004 and reported to <strong>Council</strong> on 24 November 2004. In<br />
2009, Pavement Analysis Pty Ltd confirmed that the <strong>Town</strong>’s road asset management was<br />
operating effectively and provided the first version <strong>of</strong> the 20 Year Program (2010-2029) for<br />
Road Resurfacing. This was reported to <strong>Council</strong> in October 2009 (Item IC09.87).<br />
H:\CEO\GOV\COUNCIL MINUTES\11 MINUTES\DECEMBER 2011\C CR.DOCX 144