COUNCIL MINUTES<br />
TUESDAY 20 DECEMBER 2011<br />
DV11.127 PROPOSED LONG TERM HALF ROAD CLOSURE - MACEWAN STREET, WEST<br />
LEEDERVILLE<br />
PURPOSE OF REPORT:<br />
To approve the temporary, long term closure <strong>of</strong> the southern half <strong>of</strong> MacEwan Street to facilitate<br />
the safe construction <strong>of</strong> a large commercial building.<br />
BACKGROUND:<br />
At its meeting on 19 April 2011, the <strong>Council</strong> approved a development application for the<br />
construction <strong>of</strong> a nine storey building with 3 level basement car park. The building is to be used<br />
for <strong>of</strong>fices, multiple dwellings, a restaurant and a local shop.<br />
The new building is to be constructed on the block <strong>of</strong> land surrounded by L<strong>of</strong>tus Street,<br />
MacEwan Street, Oxford Close and Railway Parade.<br />
DETAILS:<br />
The project builder has submitted a Construction and Traffic Management Plan for this project.<br />
The traffic management plan proposes numerous temporary one day road closures as well as a<br />
large number <strong>of</strong> partial road closures <strong>of</strong> MacEwan Street to facilitate the construction process.<br />
In reviewing those plans, the Administration is <strong>of</strong> the view that it would be safer to close the<br />
southern half <strong>of</strong> MacEwan Street for the duration <strong>of</strong> the construction period. This would allow<br />
the significant number <strong>of</strong> heavy vehicle delivery movements to access the site without<br />
disrupting the traffic in L<strong>of</strong>tus Street; allow the safe assembly <strong>of</strong> heavy trucks adjacent to the<br />
site; and allow the safe and controlled departure <strong>of</strong> heavy trucks via L<strong>of</strong>tus Street.<br />
Due to the narrowness <strong>of</strong> MacEwan Street, the access constraints imposed by the location <strong>of</strong><br />
this site, the lengthy construction period, and the considerable quantities <strong>of</strong> material to be<br />
removed from this site in the initial phase, followed by the large amounts <strong>of</strong> construction<br />
materials need for this project, it is recommended that the southern half <strong>of</strong> MacEwan Street be<br />
temporarily closed for the construction period - approximately 30 months.<br />
Traffic use <strong>of</strong> MacEwan Street is light, particularly in the southern west bound half, as<br />
substantiated by traffic count data.<br />
12 September 2007:<br />
1283 vehicles east bound (northern half); with 213 vehicles west bound (southern half).<br />
18 February 2010:<br />
1343 vehicles east bound (northern half); 243 vehicles west bound (southern half).<br />
The temporary removal <strong>of</strong> the two parking bays on the northern side <strong>of</strong> MacEwan Street will<br />
assist to keep the east bound trafficable section <strong>of</strong> MacEwan Street as wide as possible.<br />
The temporary, long term half road closure will enable the safe delivery and removal <strong>of</strong> material<br />
by large trucks and semi-trailers, whilst maintaining the majority easterly one-way traffic flow on<br />
the northern half <strong>of</strong> this street.<br />
H:\CEO\GOV\COUNCIL MINUTES\11 MINUTES\DECEMBER 2011\B DV.DOCX 115