EL7211 - Peabody Energy

EL7211 - Peabody Energy EL7211 - Peabody Energy

peabodyenergy.com
from peabodyenergy.com More from this publisher

Presentation to Jerrys Plains Community<br />

Exploration Licence <strong>EL7211</strong><br />

Wambo Coal Pty Ltd<br />

15 December 2008


Exploration License - <strong>EL7211</strong><br />

• Granted on 29 September 2008<br />

• Valid for 3 years<br />

<strong>EL7211</strong><br />

• Contains 135 conditions, clauses and sub clauses<br />

governing:<br />

- Further approvals required<br />

- Protecting the environment<br />

- Entry to land and landholder liaison<br />

- Exploration<br />

- Rehabilitation<br />

- Reporting


<strong>EL7211</strong> - Exploration Area<br />

• Formerly ELA3465<br />

• Comprises 967 hectares<br />

• Directly affects 23<br />

landholders<br />

• Contains:-<br />

- Southern portion of Jerrys<br />

Plains village<br />

- Sensitive areas* including:<br />

• Convict pit<br />

• Cemetery<br />

• Community hall<br />

• Historic residences<br />

*Note:- <strong>Peabody</strong> will not drill<br />

in the sensitive areas


<strong>EL7211</strong> - Exploration Strategy<br />

• Exploration to commence February 2009 after negotiation of<br />

access agreements, further approvals and procurement of<br />

exploration services<br />

• Purpose in 2009 is to establish the potential of the coal<br />

resource down to the Bowfield Seam (up to 650m deep)<br />

• Depending on the results obtained from the initial drilling the<br />

programme will be progressively expanded to establish a<br />

250m grid of boreholes that will enable a definition of the<br />

resource to a measured status according to the JORC Code*<br />

*The Australasian Code for Reporting of Exploration Results, Mineral Resources and<br />

Ore Reserves (2004), utilised by analysts and investors for investment purposes


<strong>EL7211</strong> - Target Seams<br />

Sydney Centre Point<br />

Target Seams<br />

Skywalk Level 260 m<br />

Whybrow<br />

Redbank Creek<br />

Wambo<br />

Whynot<br />

Arrowfield<br />

Bowfield<br />

+ 650m<br />

305m


EL 7211 - Drilling Programme 2009 to 2011<br />

(Number of Holes)<br />

Year<br />

EL 7211<br />

2009<br />

2010<br />

2011<br />

Total<br />

19<br />

20<br />

36<br />

75*<br />

*75 holes equal 22,128<br />

metres of drilling


EL 7211 Location of Drill Holes (2009 to 2011)


DMJP11<br />

DMJP10<br />

DMJP4<br />

WJ11<br />

WJ52<br />

WJ51<br />

WJ05<br />

NJ29<br />

WJ10<br />

WJ53<br />

NJ27<br />

NJ8<br />

NJ7<br />

DC4<br />

WJ06<br />

WJ04<br />

WJ50<br />

WJ22<br />

WJ24<br />

NJ18<br />

WJ20<br />

WJ18<br />

WJ19<br />

NJ14<br />

WJ09<br />

WJ17<br />

NJ31<br />

WJ37<br />

WJ30<br />

WJ28<br />

WJ29<br />

EL 7211 Location of Drill Holes<br />

6403000N<br />

6396000N<br />

6397000N<br />

6398000N<br />

6399000N<br />

6400000N<br />

6401000N<br />

6402000N<br />

301000E<br />

302000E<br />

303000E<br />

304000E<br />

305000E<br />

306000E<br />

307000E<br />

Jones Reserve Road<br />

ELAE4<br />

ELAE1 ELAD1ELAE2<br />

ELAD2ELAE3ELAD38<br />

ELAC1 ELAE5<br />

ELAE6 ELAC2 ELAE7 NLWA1<br />

ELAD3ELAE8 ELAD4ELAE9 ELAD5ELAE10<br />

ELAD39NLWE1<br />

NLWD1<br />

ELAB1<br />

ELAC3<br />

NLWC1<br />

ELAB2<br />

ELAE11 ELAE12 ELAE13 ELAE14<br />

NLWE2 NLWB1<br />

ELAD6ELAE15 ELAD7ELAE16 ELAD8ELAE17<br />

ELAD9NLWE3<br />

NLWD2NLWE4<br />

ELAE18 ELAC4 ELAE19 ELAA1 ELAE20 ELAC5<br />

Redmanvale Road<br />

ELAE24 ELAB3 ELAE25 ELAC6 ELAE26 ELAB4<br />

NLWA2 NLWE5 NLWC2 NLWE6 NLWA3<br />

ELAD10 ELAE21ELAD11 ELAE22ELAD12 ELAE23ELAD13<br />

NLWE7 NLWD3NLWE8 NLWD4NLWE9<br />

ELAD14<br />

ELAE27ELAD15<br />

ELAE28<br />

ELAA2 ELAE29 ELAC7 ELAE30 ELAA3 ELAE31 ELAC8<br />

NLWA4 NLWE15 NLWC5 NLWE16 NLWA5 NLWE17 NLWC6<br />

ELAE32ELAD16 ELAE33ELAD17 ELAE34ELAD18<br />

ELAE35<br />

ELAA4 ELAA5 ELAA6<br />

ELAE44 ELAE45 ELAE46 ELAE47 ELAE48<br />

ELAC13 ELAC14 ELAC15 NLWC8<br />

ELAA7 ELAE62 ELAC18 ELAE63 ELAA8 ELAE64 NLWC11<br />

NLWC3 NLWE10 NLWB2<br />

NLWC4 NLWE11<br />

NLWD5NLWE12NLWD6NLWE13 NLWD7NLWE14<br />

NLWE18NLWD8<br />

ELAB9 ELAE69 ELAC19 ELAE70 NLWE46 NLWE47 NLWC13<br />

ELAE72 ELAA9 ELAE73 ELAC20<br />

ELAE74<br />

NLWD9NLWE19<br />

NLWA7 NLWE41<br />

RIVER<br />

NLWE20NLWD10<br />

ELAC9 ELAE36 ELAB5 ELAE37 ELAC10 ELAE38 ELAB6 ELAE39 ELAC11 ELAE40 ELAC12 NLWB3 NLWE21 NLWC7 NLWE22 NLWB4 NLWE23<br />

ELAE41ELAD19<br />

ELAE42ELAD20 ELAE43ELAD21 ELAE75ELAD22 ELAE76ELAD23<br />

ELAE49ELAD24 ELAE50ELAD25 ELAE51ELAD26 ELAE52ELAD27 ELAE53ELAD28<br />

ELAE54NLWD14<br />

NLWE29<br />

NLWD11 NLWE24NLWD12 NLWE25NLWD13<br />

NLWE26 NLWE27 NLWC9 NLWE28<br />

A 444<br />

"Mont<br />

301000E<br />

302000E<br />

303000E<br />

304000E<br />

305000E<br />

306000E<br />

307000E<br />

NLWA6<br />

NLWE30NLWD15<br />

NLWE31 NLWE32<br />

ELAC16 ELAE55 ELAB7 ELAE56 ELAC17 ELAE57 ELAB8 NLWB5 NLWE33 NLWC10 NLWE34 NLWB6 NLWE35 NLWE36<br />

ELAE58ELAD29<br />

ELAE59ELAD30<br />

ELAE60ELAD31<br />

ELAE61 NLWE37NLWD16 NLWE38NLWD17 NLWE39NLWD18<br />

NLWE40<br />

NLWC12<br />

ELAD32 ELAE65ELAD33 ELAE66ELAD34 ELAE67ELAD35<br />

ELAE68 NLWE43NLWD19<br />

NLWE44NLWD20<br />

NLWE45<br />

ELAD36 ELAE71ELAD37<br />

NLWE48<br />

NLWE42<br />

6403000N<br />

6398000N<br />

6399000N<br />

6400000N<br />

6401000N<br />

6402000N<br />

6397000N<br />

6396000N<br />

• Drilling occurs on a predetermined<br />

pattern:<br />

- Initial drilling to establish the<br />

potential, ● holes<br />

- Thereafter drilling is aimed at<br />

infilling the data, progressively<br />

establishing a 1km grid, ● and<br />

● holes, then 500m grid, ●<br />

holes, and finally 250m grid, ●<br />

holes.<br />

• Final position of the holes<br />

determined by agreement with<br />

land owner, environmental<br />

constraints, topography and<br />

surface infrastructure


<strong>EL7211</strong> Drill Site Detail<br />

Tailings and<br />

waste material<br />

removed from<br />

site<br />

Earth bund to<br />

contain drill<br />

water flows<br />

Bales to trap silt<br />

and suspended<br />

materials<br />

Vehicles inspected to prevent<br />

Transfer of weeds and<br />

hydrocarbon spills<br />

Drill area, maximum<br />

50m x 50m<br />

No chemical or<br />

fuel storage on<br />

site<br />

Support vehicle<br />

for compressors,<br />

drill rods, waste,<br />

oil, fuel, etc.<br />

Each site<br />

rehabilitated,<br />

inspected and<br />

report issued<br />

Access from<br />

uphill to prevent<br />

bogging and<br />

unnecessary<br />

disturbance<br />

Wambo drilling rigs will be smaller<br />

and quieter diesel units which do not<br />

require compressors<br />

Temporary<br />

safety fence


<strong>EL7211</strong> Access Agreements and Compensation<br />

• Governed by Sections 138 to 158 of Mining Act 1992<br />

• To make provision for:<br />

- Periods during which permitted to access land<br />

- Land where prospecting may take place and means of entry<br />

- Types of prospecting allowed<br />

- Conditions to be observed while prospecting<br />

- Things that have to be done to protect the environment<br />

- Compensation payable to the landholder<br />

- Manner of resolving disputes that arise<br />

- Manner of varying the agreement<br />

- Other matters agreed to be included<br />

• Compensation will be negotiated with each land holder as appropriate and<br />

will be based on duration of entry and benchmark payments in the area


<strong>EL7211</strong> <strong>Peabody</strong> Undertakings<br />

• Compliance with <strong>EL7211</strong> conditions<br />

• Drilling and other intrusive exploration activities will not be undertaken in<br />

the precincts of the convict pit, cemetery, community hall and historic<br />

buildings<br />

• Forming a working group representing landholders on whose properties<br />

exploration will take place to establish exploration protocols:<br />

- Entry notification<br />

- Drill site standards<br />

- Liaison programme (addressing inquiries and complaints)<br />

- Final Inspections<br />

- Feedback sheets<br />

• Regular feedback on progress with exploration activities and resultant<br />

changes to exploration area through community meetings, Wambo<br />

Community Consultative Committee and newsletters


Thank You<br />

Questions?

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!