15.11.2014 Views

City of Oxnard - Bicycle and Pedestrian Master Plan Appendices

City of Oxnard - Bicycle and Pedestrian Master Plan Appendices

City of Oxnard - Bicycle and Pedestrian Master Plan Appendices

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Appendix C | Safety Review<br />

Route<br />

Between<br />

Direction<br />

<strong>Bicycle</strong> Lane<br />

With/On<br />

Existing<br />

Bike<br />

Lane<br />

Width<br />

(ft)<br />

Existing<br />

Bike<br />

Lane<br />

Length<br />

(ft)<br />

Meets<br />

St<strong>and</strong>ard<br />

(Preferred<br />

or Min.<br />

Design)<br />

Pleasant Valley Road Syracuse Drive Beaumont Avenue NE No On-Street Parking 8 1135 Preferred<br />

Pleasant Valley Road Beaumont Avenue Etting Road NE No On-Street Parking 5 494 Minimum<br />

Pleasant Valley Road Etting Road Packard Street NE No On-Street Parking 5 1914 Minimum<br />

Pleasant Valley Road Packard Street Pacific Coast Highway NE No On-Street Parking 5 683 Minimum<br />

Pleasant Valley<br />

Road <strong>Oxnard</strong> Boulevard Squires Drive<br />

Pleasant Valley Road <strong>Oxnard</strong> Boulevard Butler Road SW No On-Street Parking 5 350 Minimum<br />

Pleasant Valley Road Butler Road Shakspeare Drive SW No On-Street Parking 5 617 Minimum<br />

Pleasant Valley Road Shakspeare Drive Orange Grove Avenue SW No On-Street Parking 5 353 Minimum<br />

Pleasant Valley Road Orange Grove Avenue Oriole Lane SW No On-Street Parking 5 467 Minimum<br />

Pleasant Valley Road Oriole Lane Olds Road SW No On-Street Parking 5 810 Minimum<br />

Pleasant Valley Road Olds Road Bard Road SW No On-Street Parking 5 224 Minimum<br />

Pleasant Valley Road Bard Road Rose Avenue SW No On-Street Parking 5 2570 Minimum<br />

Pleasant Valley Road Rose Avenue Terrace Avenue SW No On-Street Parking 12 to 5 2034<br />

Pleasant Valley Road Terrace Avenue Squires Drive WB No On-Street Parking 12 to 5 1589<br />

Rice Avenue Fifth Street Gonzales Road<br />

Comments/<br />

Recommendations<br />

Estimate<br />

Cost<br />

Reconstruct <strong>Bicycle</strong> Lane per A.3.3. It<br />

is recommended that channelizing<br />

lines with chevron or diagonal<br />

striping be installed where bicycle<br />

lane exceeds preferred design.<br />

Sidewalk reduction required to meet<br />

preferred design for right turn<br />

pocket at Pacific Coast Highway per<br />

A.3.4. $15,800<br />

Sidewalk reduction required to meet<br />

preferred design for Right Turn<br />

Pocket at Olds Road per A.3.4.<br />

Sidewalk reduction required to meet<br />

preferred design for Right Turn<br />

Pocket at Rose Avenue per A.3.4.<br />

Reconstruct <strong>Bicycle</strong> Lane per A.3.3. It<br />

is recommended that channelizing<br />

lines with chevron or diagonal<br />

striping be installed where bicycle<br />

lane exceeds preferred design $27,950<br />

Reconstruct <strong>Bicycle</strong> Lane per A.3.3. It<br />

is recommended that channelizing<br />

lines with chevron or diagonal<br />

striping be installed where bicycle<br />

lane exceeds preferred design. $23,950<br />

C-28 | Alta <strong>Plan</strong>ning + Design

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!