City of Oxnard - Bicycle and Pedestrian Master Plan Appendices
City of Oxnard - Bicycle and Pedestrian Master Plan Appendices
City of Oxnard - Bicycle and Pedestrian Master Plan Appendices
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Appendix C | Safety Review<br />
Route<br />
Between<br />
Direction<br />
<strong>Bicycle</strong> Lane<br />
With/On<br />
Existing<br />
Bike<br />
Lane<br />
Width<br />
(ft)<br />
Existing<br />
Bike<br />
Lane<br />
Length<br />
(ft)<br />
Meets<br />
St<strong>and</strong>ard<br />
(Preferred<br />
or Min.<br />
Design)<br />
Pleasant Valley Road Syracuse Drive Beaumont Avenue NE No On-Street Parking 8 1135 Preferred<br />
Pleasant Valley Road Beaumont Avenue Etting Road NE No On-Street Parking 5 494 Minimum<br />
Pleasant Valley Road Etting Road Packard Street NE No On-Street Parking 5 1914 Minimum<br />
Pleasant Valley Road Packard Street Pacific Coast Highway NE No On-Street Parking 5 683 Minimum<br />
Pleasant Valley<br />
Road <strong>Oxnard</strong> Boulevard Squires Drive<br />
Pleasant Valley Road <strong>Oxnard</strong> Boulevard Butler Road SW No On-Street Parking 5 350 Minimum<br />
Pleasant Valley Road Butler Road Shakspeare Drive SW No On-Street Parking 5 617 Minimum<br />
Pleasant Valley Road Shakspeare Drive Orange Grove Avenue SW No On-Street Parking 5 353 Minimum<br />
Pleasant Valley Road Orange Grove Avenue Oriole Lane SW No On-Street Parking 5 467 Minimum<br />
Pleasant Valley Road Oriole Lane Olds Road SW No On-Street Parking 5 810 Minimum<br />
Pleasant Valley Road Olds Road Bard Road SW No On-Street Parking 5 224 Minimum<br />
Pleasant Valley Road Bard Road Rose Avenue SW No On-Street Parking 5 2570 Minimum<br />
Pleasant Valley Road Rose Avenue Terrace Avenue SW No On-Street Parking 12 to 5 2034<br />
Pleasant Valley Road Terrace Avenue Squires Drive WB No On-Street Parking 12 to 5 1589<br />
Rice Avenue Fifth Street Gonzales Road<br />
Comments/<br />
Recommendations<br />
Estimate<br />
Cost<br />
Reconstruct <strong>Bicycle</strong> Lane per A.3.3. It<br />
is recommended that channelizing<br />
lines with chevron or diagonal<br />
striping be installed where bicycle<br />
lane exceeds preferred design.<br />
Sidewalk reduction required to meet<br />
preferred design for right turn<br />
pocket at Pacific Coast Highway per<br />
A.3.4. $15,800<br />
Sidewalk reduction required to meet<br />
preferred design for Right Turn<br />
Pocket at Olds Road per A.3.4.<br />
Sidewalk reduction required to meet<br />
preferred design for Right Turn<br />
Pocket at Rose Avenue per A.3.4.<br />
Reconstruct <strong>Bicycle</strong> Lane per A.3.3. It<br />
is recommended that channelizing<br />
lines with chevron or diagonal<br />
striping be installed where bicycle<br />
lane exceeds preferred design $27,950<br />
Reconstruct <strong>Bicycle</strong> Lane per A.3.3. It<br />
is recommended that channelizing<br />
lines with chevron or diagonal<br />
striping be installed where bicycle<br />
lane exceeds preferred design. $23,950<br />
C-28 | Alta <strong>Plan</strong>ning + Design