City of Oxnard - Bicycle and Pedestrian Master Plan Appendices
City of Oxnard - Bicycle and Pedestrian Master Plan Appendices
City of Oxnard - Bicycle and Pedestrian Master Plan Appendices
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Appendix C | Safety Review<br />
Route<br />
Between<br />
H Street Erica Place Bluebell Street SB<br />
Direction<br />
<strong>Bicycle</strong> Lane<br />
With/On<br />
Existing<br />
Bike<br />
Lane<br />
Width<br />
Existing<br />
Bike<br />
Lane<br />
Length<br />
Meets<br />
St<strong>and</strong>ard<br />
(Preferred<br />
or Min.<br />
(ft) (ft) Design)<br />
On-Street Parallel<br />
Parking 15 780 Preferred<br />
H Street Bluebell Street Gonzales Road SB<br />
On-Street Parallel<br />
Parking 15 875 Preferred<br />
H Street Gonzales Road Rosewood Drive SB No On-Street Parking 8 212 Preferred<br />
On-Street Parallel<br />
H Street Rosewood Drive Janetwood Drive SB<br />
Parking 12 750 Minimum<br />
On-Street Parallel<br />
H Street Janetwood Drive Ivywood Drive SB<br />
Parking 12 341 Minimum<br />
On-Street Parallel<br />
H Street Ivywood Drive Huntswood Way SB<br />
Parking 12 273 Minimum<br />
On-Street Parallel<br />
H Street Huntswood Way Glenwood Drive SB<br />
Parking 12 276 Minimum<br />
On-Street Parallel<br />
H Street Glenwood Drive Devonshire Drive SB<br />
Parking 12 1101 Minimum<br />
On-Street Parallel<br />
H Street Devonshire Drive Robert Avenue SB<br />
Parking 12 289 Minimum<br />
On-Street Parallel<br />
H Street Robert Avenue Roderick Avenue SB<br />
Parking 12 310 Minimum<br />
On-Street Parallel<br />
H Street Roderick Avenue Douglas Avenue SB<br />
Parking 12 338 Minimum<br />
On-Street Parallel<br />
H Street Douglas Avenue Doris Avenue SB<br />
Parking 12 339 Minimum<br />
On-Street Parallel<br />
H Street Doris Avenue Deodar Avenue SB<br />
Parking 12 308 Minimum<br />
On-Street Parallel<br />
H Street Deodar Avenue Beverly Drive SB<br />
Parking 12 300 Minimum<br />
On-Street Parallel<br />
H Street Beverly Drive Magnolia Avenue SB<br />
Parking 12 643 Minimum<br />
On-Street Parallel<br />
H Street Magnolia Avenue Second Street SB<br />
Parking 12 1036 Minimum<br />
H Street Second Street Fifth Street SB<br />
Harbor Blvd Fifth Street Channel Isl<strong>and</strong>s Boulevard<br />
On-Street Parallel<br />
Parking 12 1441 Minimum<br />
Comments/<br />
Recommendations<br />
Estimate<br />
Cost<br />
Reconstruct <strong>Bicycle</strong> Lane per A.3.2.<br />
preferred design. $12,050<br />
Reconstruct <strong>Bicycle</strong> Lane per A.3.2.<br />
preferred design. Construct <strong>Bicycle</strong><br />
Lane per A.3.4. at Gonzales Road. $19,950<br />
Reconstruct <strong>Bicycle</strong> Lane per A.3.2.<br />
minimum design. $9,900<br />
Reconstruct <strong>Bicycle</strong> Lane per A.3.2.<br />
minimum design. $11,450<br />
Reconstruct <strong>Bicycle</strong> Lane per A.3.2.<br />
minimum design. $11,100<br />
Reconstruct <strong>Bicycle</strong> Lane per A.3.2.<br />
minimum design. $11,100<br />
Reconstruct <strong>Bicycle</strong> Lane per A.3.2.<br />
minimum design. $15,600<br />
Reconstruct <strong>Bicycle</strong> Lane per A.3.2.<br />
minimum design. $11,200<br />
Reconstruct <strong>Bicycle</strong> Lane per A.3.2.<br />
minimum design. $11,300<br />
Reconstruct <strong>Bicycle</strong> Lane per A.3.2.<br />
minimum design. $11,450<br />
Reconstruct <strong>Bicycle</strong> Lane per A.3.2.<br />
minimum design. $11,450<br />
Reconstruct <strong>Bicycle</strong> Lane per A.3.2.<br />
minimum design. $11,300<br />
Reconstruct <strong>Bicycle</strong> Lane per A.3.2.<br />
minimum design. $11,250<br />
Reconstruct <strong>Bicycle</strong> Lane per A.3.2.<br />
minimum design. $13,100<br />
Reconstruct <strong>Bicycle</strong> Lane per A.3.2.<br />
minimum design. $15,400<br />
Reconstruct <strong>Bicycle</strong> Lane per A.3.2.<br />
minimum design. Sidewalk reduction<br />
required to meet preferred design<br />
for right turn pocket at Fifth Avenue<br />
per A.3.4. $17,400<br />
C-16 | Alta <strong>Plan</strong>ning + Design