Emergency Plan - Grand Strand Water and Sewer Authority
Emergency Plan - Grand Strand Water and Sewer Authority
Emergency Plan - Grand Strand Water and Sewer Authority
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Electrical & <strong>Emergency</strong> Power<br />
INCIDENT SUPPORT FUNCTION 13<br />
(ISF-13)<br />
ELECTRICAL & EMERGENCY POWER<br />
PRIMARY:<br />
SUPPORT:<br />
Technical Services<br />
Maintenance<br />
Wastewater Collections<br />
Agricultural Services<br />
Construction<br />
Fleet Services<br />
2.2.41. INTRODUCTION<br />
For the purposes of this ISF, Electrical & <strong>Emergency</strong> Power refers to: maintenance <strong>and</strong> repair of<br />
electrical equipment, maintenance <strong>and</strong> repair of instrumentation <strong>and</strong> SCADA, <strong>and</strong> maintenance<br />
<strong>and</strong> repair of emergency power generating equipment.<br />
2.2.42. MISSION<br />
To ensure electrical equipment <strong>and</strong> systems, SCADA systems, <strong>and</strong> emergency generators remain<br />
fully operational, <strong>and</strong> to coordinate with commercial power companies in restoring power to<br />
priority GSWSA facilities.<br />
2.2.43. CONCEPT of OPERATIONS<br />
The Technical Services Department has overall responsibility for the Electrical & <strong>Emergency</strong><br />
Power function.<br />
2.2.44. RESPONSIBILITIES<br />
Preparedness / Mitigation<br />
Ensure all personnel are familiar with their duties <strong>and</strong> responsibilities under this plan.<br />
Maintain all emergency generators in a constant state of readiness. (Refer to Appendix 9 for<br />
detailed generator information.)<br />
Ensure SCADA monitoring <strong>and</strong> control systems remain fully functional.<br />
Confer with Santee Cooper <strong>and</strong> Horry Electric Cooperative, to impress upon them the criticality<br />
of our facilities <strong>and</strong> services, <strong>and</strong> to share our plans <strong>and</strong> priorities with them.<br />
Response<br />
Obtain briefing <strong>and</strong> receive instructions from appropriate Incident Comm<strong>and</strong> Staff.<br />
Determine the potential impact of the incident on electrical equipment / systems or SCADA<br />
systems.<br />
<strong>Gr<strong>and</strong></strong> <strong>Str<strong>and</strong></strong> <strong>Water</strong> & <strong>Sewer</strong> <strong>Authority</strong> 56 CONFIDENTIAL MATERIALS<br />
<strong>Emergency</strong> Management <strong>Plan</strong> SECURITY SENSITIVE<br />
June 7, 2013 NOT FOR PUBLIC DISCLOSURE