14.11.2014 Views

Catalyst 6500 Series Switches Installation Guide - Ipland

Catalyst 6500 Series Switches Installation Guide - Ipland

Catalyst 6500 Series Switches Installation Guide - Ipland

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CHAPTER<br />

2<br />

Preparing for <strong>Installation</strong><br />

Note In this publication, the term <strong>Catalyst</strong> <strong>6500</strong> series refers only to the switch chassis listed in Chapter 1.<br />

The <strong>Catalyst</strong> 6000 series switches (<strong>Catalyst</strong> 6006 and <strong>Catalyst</strong> 6009 switches) are described in a<br />

separate publication, the <strong>Catalyst</strong> 6000 <strong>Series</strong> Switch <strong>Installation</strong> <strong>Guide</strong>.<br />

Planning a proper location for the switch and the layout of your equipment rack or wiring closet is<br />

essential for successful system operation. You should install the switch in an enclosed, secure area,<br />

ensuring that only qualified personnel have access to the switch and control of the environment.<br />

Equipment placed too close together or inadequately ventilated can cause system overtemperature<br />

conditions. In addition, poor equipment placement can make chassis panels inaccessible and difficult to<br />

maintain.<br />

This chapter describes how to prepare your site for switch installation and contains these sections:<br />

• Safety, page 2-2<br />

• Site Requirements, page 2-2<br />

• Power Requirements, page 2-22<br />

• Cabling Requirements, page 2-24<br />

• Site Preparation Checklist, page 2-24<br />

OL-5781-08<br />

<strong>Catalyst</strong> <strong>6500</strong> <strong>Series</strong> <strong>Switches</strong> <strong>Installation</strong> <strong>Guide</strong><br />

2-1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!