14.11.2014 Views

Catalyst 6500 Series Switches Installation Guide - Ipland

Catalyst 6500 Series Switches Installation Guide - Ipland

Catalyst 6500 Series Switches Installation Guide - Ipland

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Appendix C<br />

Repacking the Switch<br />

Figure C-1<br />

Packing Material<br />

Top<br />

packing<br />

material<br />

Docs and<br />

accessories<br />

go in here<br />

Power<br />

supply(s)<br />

go in here<br />

Figure C-2<br />

Final Package<br />

12985<br />

12984<br />

Note<br />

Do not use tape to hold the outside carton to the bottom pallet. Packing straps must be added to hold the<br />

entire package together and to add strength to the package.<br />

C-2<br />

<strong>Catalyst</strong> <strong>6500</strong> <strong>Series</strong> <strong>Switches</strong> <strong>Installation</strong> <strong>Guide</strong><br />

OL-5781-08

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!