14.11.2014 Views

Catalyst 6500 Series Switches Installation Guide - Ipland

Catalyst 6500 Series Switches Installation Guide - Ipland

Catalyst 6500 Series Switches Installation Guide - Ipland

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Chapter 4<br />

Removal and Replacement Procedures<br />

Installing the Remote Power Cycling Feature Control Wires (Optional)<br />

Required Tools and Components<br />

The following tools and components are required to perform this procedure:<br />

• Relay controller box.<br />

We strongly recommend that you purchase a relay controller box that uses a NO (normally open)<br />

relay to control the remote power cycling.<br />

• Small flat-blade screwdriver<br />

• 18 AWG (maximum) control wire<br />

• Wire cutter<br />

• Wire stripper<br />

Installing the Remote Power-Cycling Control Wires<br />

To install the two control wires from the relay controller box to the 8700 W power supply, follow these<br />

steps:<br />

Step 1<br />

Step 2<br />

Step 3<br />

Step 4<br />

Step 5<br />

Step 6<br />

Step 7<br />

Remove the relay controller box from its shipping packaging.<br />

Install the relay controller box following the installation documentation supplied with the product.<br />

Measure and cut two pieces of 18 AWG control wire long enough to run between the relay controller box<br />

terminals and the terminal block on the 8700 W power supply.<br />

Strip approximately 1/4-inch of insulation from each end of both control wires.<br />

Connect the two control wires to the relay controller box terminals following the instruction<br />

documentation supplied with the relay controller box.<br />

Identify which pair of terminals on the power supply terminal block (either terminals 1 and 2 for a NO<br />

relay (recommended) or terminals 2 and 3 for a NC relay) where you need to connect the control wires.<br />

Using a small flat-blade screwdriver, depress the wire release mechanism for one of the terminals on the<br />

power supply terminal block and insert the bare wire into the terminal. (See Figure 4-78.) Remove the<br />

screwdriver to secure the wire. Gently tug on the wire to verify that it is secure in the terminal block.<br />

Repeat Step 6 for the second control wire.<br />

OL-5781-08<br />

<strong>Catalyst</strong> <strong>6500</strong> <strong>Series</strong> <strong>Switches</strong> <strong>Installation</strong> <strong>Guide</strong><br />

4-99

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!