Catalyst 6500 Series Switches Installation Guide - Ipland

Catalyst 6500 Series Switches Installation Guide - Ipland Catalyst 6500 Series Switches Installation Guide - Ipland

ipland.com.ua
from ipland.com.ua More from this publisher
14.11.2014 Views

CISCO SYSTEMS, INC 1 2 3 4 INPUT OK Removing and Installing the DC-Input Power Supplies Chapter 4 Removal and Replacement Procedures Note If you are not going to remove the IPM, skip steps 7 and 8 and go to step 9. Step 7 Loosen the IPM captive installation screws on the power supply. See Figure 4-41. Step 8 Lift up on both IPM latches and remove the IPM. See Figure 4-43. Figure 4-43 Removing the IPM Module RUN INSTALL FAN OK OUTPUT FAIL 191309 Step 9 Loosen the captive installation screw on the power supply (Figure 4-41). Caution Step 10 Use both hands to install and remove power supplies. Each DC-input power supply weighs 35 pounds (16 kg). Grasp the power supply handle with one hand and slide the power supply part of the way out of the chassis. Place your other hand underneath the power supply, as shown in Figure 4-44 (without IPM) and in Figure 4-45 (with IPM), and slide the power supply completely out of the chassis. Note If the power supply bay is to remain empty, install a blank power supply filler plate (Cisco part number 700-03104-01) over the opening, and secure it with the captive installation screws. 4-62 Catalyst 6500 Series Switches Installation Guide OL-5781-08

CISCO SYSTEMS, INC CISCO SYSTEMS, INC FAN OK 1 2 3 4 INPUT OK FAN OK Chapter 4 Removal and Replacement Procedures Removing and Installing the DC-Input Power Supplies Figure 4-44 Handling a DC-Input Power Supply without IPM RUN INSTALL 1 2 3 4 INPUT OK OUTPUT FAIL 191308 Figure 4-45 Handling a DC-Input Power Supply with IPM RUN INSTALL OUTPUT FAIL OL-5781-08 Catalyst 6500 Series Switches Installation Guide 4-63

CISCO SYSTEMS, INC<br />

1 2 3 4<br />

INPUT OK<br />

Removing and Installing the DC-Input Power Supplies<br />

Chapter 4<br />

Removal and Replacement Procedures<br />

Note If you are not going to remove the IPM, skip steps 7 and 8 and go to step 9.<br />

Step 7 Loosen the IPM captive installation screws on the power supply. See Figure 4-41.<br />

Step 8 Lift up on both IPM latches and remove the IPM. See Figure 4-43.<br />

Figure 4-43<br />

Removing the IPM Module<br />

RUN<br />

INSTALL<br />

FAN<br />

OK<br />

OUTPUT<br />

FAIL<br />

191309<br />

Step 9 Loosen the captive installation screw on the power supply (Figure 4-41).<br />

Caution<br />

Step 10<br />

Use both hands to install and remove power supplies. Each DC-input power supply weighs 35 pounds<br />

(16 kg).<br />

Grasp the power supply handle with one hand and slide the power supply part of the way out of the<br />

chassis. Place your other hand underneath the power supply, as shown in Figure 4-44 (without IPM) and<br />

in Figure 4-45 (with IPM), and slide the power supply completely out of the chassis.<br />

Note<br />

If the power supply bay is to remain empty, install a blank power supply filler plate (Cisco part number<br />

700-03104-01) over the opening, and secure it with the captive installation screws.<br />

4-62<br />

<strong>Catalyst</strong> <strong>6500</strong> <strong>Series</strong> <strong>Switches</strong> <strong>Installation</strong> <strong>Guide</strong><br />

OL-5781-08

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!