OSM-4OC12 POS-SI 2 1 2 1 4 2 3 1 4 2 3 1 4 3 4 3 PCMCIA EJECT 1% Removing and Installing the AC-Input Power Supplies Chapter 4 Removal and Replacement Procedures To remove a power supply, follow these steps: Step 1 Step 2 Step 3 Turn the power switch to the Off (0) position on the PEM for the power supply that you are removing. Figure 4-1 shows the location of the AC-input PEMs on the Catalyst 6503 and Catalyst 6503-E switch chassis. Disconnect the power cord from the power source. Do not touch the metal prongs on the power cord when it is still connected to the PEM. Remove the power cord from the power connection on the PEM. Do not touch the metal prongs embedded in the PEM. Step 4 Loosen the captive installation screws on the power supply. See Figure 4-2 for the Catalyst 6503 and 6503-E switches. Step 5 Step 6 Grasp the power supply handle with one hand, and slide the power supply part of the way out of the chassis. Place your other hand underneath the power supply, as shown in Figure 4-3, and slide the power supply completely out of the chassis. If the power supply bay is to remain empty, install a blank power supply filler plate (Cisco part number 800-16727-01 for the Catalyst 6503 and Catalyst 6503-E switches) over the opening, and secure it with the captive installation screws. Figure 4-1 Catalyst 6503 and Catalyst 6503-E Switches—PEM Location PEM 1 PEM 2 WS-X6K-SUP2-2GE SUPERVISOR2 STATUS SYSTEM CONSOLE PWR MGMT RESET CONSOLE CONSOLE PORT MODE Switch Load 100% PORT 1 PORT 2 OSM-4OC12 POS-SI STATUS 4 PORT OC-12 POS SM IR LINK LINK LINK LINK RESET CARRIER ALARM ACTIVE TX RX PORT 1 RX TX CARRIER ALARM ACTIVE TX RX PORT 2 RX TX CARRIER ALARM ACTIVE TX RX PORT 3 RX TX CARRIER ALARM ACTIVE LINK TX RX PORT4 RX TX LINK 63191 STATUS 4 PORT OC-12 POS SM IR LINK LINK LINK LINK RESET CARRIER ALARM ACTIVE TX RX PORT 1 RX TX CARRIER ALARM ACTIVE TX RX PORT 2 RX TX CARRIER ALARM ACTIVE TX RX PORT 3 RX TX CARRIER ALARM ACTIVE TX RX PORT4 RX TX Figure 4-2 Power Supply Captive Installation Screws Status LEDs INPUT FAN OUTPUT OK OK FAIL 63183 Captive installation screws 4-4 Catalyst 6500 Series Switches Installation Guide OL-5781-08
Chapter 4 Removal and Replacement Procedures Removing and Installing the AC-Input Power Supplies Figure 4-3 Handling an AC-Input Power Supply Power Supply 2 (redundant) INPUT FAN OUTPUT OK OK FAIL 63032 Power Supply 1 INPUT FAN OUTPUT OK OK FAIL Installing a 950 W or 1400 W AC-Input Power Supply To install an AC-input power supply, follow these steps: Step 1 Step 2 Step 3 Step 4 Ensure that the system (earth) ground connection has been made. For ground connection instructions, see the “Establishing the System Ground” section on page 3-52. If necessary, remove the blank power supply filler plate from the chassis power supply bay opening by loosening the captive installation screws. Grasp the power supply handle with one hand. Place your other hand underneath the power supply, as shown in Figure 4-3. Slide the power supply into the power supply bay. Make sure that the power supply is fully seated in the bay. Securely tighten the power supply captive installation screws. See Figure 4-2 for the Catalyst 6503 and Catalyst 6503-E switches. Caution Step 5 Power supply captive installation screws must be tight to ensure protective grounding continuity. At the front of the chassis, plug the power cord into the PEM. OL-5781-08 Catalyst 6500 Series Switches Installation Guide 4-5
- Page 160 and 161: Installing a Catalyst 6509-V-E Swit
- Page 162 and 163: Installing a Catalyst 6513 or Catal
- Page 164 and 165: WS-X6408 8 PORT GIGABIT ETHERNET WS
- Page 166 and 167: WS-X6K-SUP2-2GE SUPERVISOR2 WS-X6K-
- Page 168 and 169: Generic Installation Procedures Cha
- Page 170 and 171: Generic Installation Procedures Cha
- Page 172 and 173: Establishing the System Ground Chap
- Page 174 and 175: OSM-4OC12 POS-SI 2 1 2 1 4 2 3 1 4
- Page 176 and 177: WS-X6K-SUP2-2GE SUPERVISOR2 WS-X6K-
- Page 178 and 179: 1 2 3 4 5 6 7 8 9 10 1 1 2 12 3 4 5
- Page 180 and 181: Establishing the System Ground Chap
- Page 182 and 183: Attaching the Interface Cables Chap
- Page 184 and 185: Attaching the Interface Cables Chap
- Page 186 and 187: Attaching the Interface Cables Chap
- Page 188 and 189: Attaching the Interface Cables Chap
- Page 190 and 191: Attaching the Interface Cables Chap
- Page 192 and 193: LINK Attaching the Interface Cables
- Page 194 and 195: LINK Attaching the Interface Cables
- Page 196 and 197: Attaching the Interface Cables Chap
- Page 198 and 199: Attaching the Interface Cables Chap
- Page 200 and 201: Attaching the Interface Cables Chap
- Page 202 and 203: Attaching the Interface Cables Chap
- Page 204 and 205: Verifying Switch Chassis Installati
- Page 206 and 207: Verifying Switch Chassis Installati
- Page 208 and 209: Removing and Installing the AC-Inpu
- Page 212 and 213: Removing and Installing the AC-Inpu
- Page 214 and 215: ALL FASTENERS MUST BE FULLY ENGAGED
- Page 216 and 217: Removing and Installing the AC-Inpu
- Page 218 and 219: WS-X6K-SUP2-2GE SUPERVISOR2 WS-X6K-
- Page 220 and 221: Removing and Installing the AC-Inpu
- Page 222 and 223: OSM-4OC12 POS-SI 1 2 1 2 1 1 2 2 3
- Page 224 and 225: Removing and Installing the DC-Inpu
- Page 226 and 227: Removing and Installing the DC-Inpu
- Page 228 and 229: Removing and Installing the DC-Inpu
- Page 230 and 231: Removing and Installing the DC-Inpu
- Page 232 and 233: Removing and Installing the DC-Inpu
- Page 234 and 235: Removing and Installing the DC-Inpu
- Page 236 and 237: Removing and Installing the DC-Inpu
- Page 238 and 239: Removing and Installing the DC-Inpu
- Page 240 and 241: Removing and Installing the DC-Inpu
- Page 242 and 243: Removing and Installing the DC-Inpu
- Page 244 and 245: Removing and Installing the DC-Inpu
- Page 246 and 247: Removing and Installing the DC-Inpu
- Page 248 and 249: Removing and Installing the DC-Inpu
- Page 250 and 251: Removing and Installing the DC-Inpu
- Page 252 and 253: Removing and Installing the DC-Inpu
- Page 254 and 255: Removing and Installing the DC-Inpu
- Page 256 and 257: Removing and Installing the DC-Inpu
- Page 258 and 259: Removing and Installing the DC-Inpu
Chapter 4<br />
Removal and Replacement Procedures<br />
Removing and Installing the AC-Input Power Supplies<br />
Figure 4-3<br />
Handling an AC-Input Power Supply<br />
Power Supply 2<br />
(redundant)<br />
INPUT FAN OUTPUT<br />
OK OK FAIL<br />
63032<br />
Power<br />
Supply 1<br />
INPUT FAN OUTPUT<br />
OK OK FAIL<br />
Installing a 950 W or 1400 W AC-Input Power Supply<br />
To install an AC-input power supply, follow these steps:<br />
Step 1<br />
Step 2<br />
Step 3<br />
Step 4<br />
Ensure that the system (earth) ground connection has been made.<br />
For ground connection instructions, see the “Establishing the System Ground” section on page 3-52.<br />
If necessary, remove the blank power supply filler plate from the chassis power supply bay opening by<br />
loosening the captive installation screws.<br />
Grasp the power supply handle with one hand. Place your other hand underneath the power supply, as<br />
shown in Figure 4-3. Slide the power supply into the power supply bay. Make sure that the power supply<br />
is fully seated in the bay.<br />
Securely tighten the power supply captive installation screws.<br />
See Figure 4-2 for the <strong>Catalyst</strong> 6503 and <strong>Catalyst</strong> 6503-E switches.<br />
Caution<br />
Step 5<br />
Power supply captive installation screws must be tight to ensure protective grounding continuity.<br />
At the front of the chassis, plug the power cord into the PEM.<br />
OL-5781-08<br />
<strong>Catalyst</strong> <strong>6500</strong> <strong>Series</strong> <strong>Switches</strong> <strong>Installation</strong> <strong>Guide</strong><br />
4-5