Catalyst 6500 Series Switches Installation Guide - Ipland
Catalyst 6500 Series Switches Installation Guide - Ipland Catalyst 6500 Series Switches Installation Guide - Ipland
Attaching the Interface Cables Chapter 3 Installing the Switch Figure 3-48 Disengaging the Front Panel Tab from the Rear of the Cable Guide Assembly 280379 Step 3 Connect and route a network cable from one of the chassis module ports up through the cable management guides and up to the room’s overhead cable trough. When routing network interface cables through the cable guides, you must allow adequate slack in the network cable so that the cable’s bend radius is always shallow and so that the cable management assembly can be pivoted down to permit access to the chassis fan tray assembly. Tip To keep the network interface cables organized and minimize the space they occupy, try bundling them in groups of 12 cables (4 bundles of 12 cables per 48-port module). (See Figure 3-49.) 3-80 Catalyst 6500 Series Switches Installation Guide OL-5781-08
Chapter 3 Installing the Switch Attaching the Interface Cables Figure 3-49 Routing Network Cables Through the Cable Management Assembly 280375 Step 4 Step 5 Step 6 Repeat step 3 for the remainder of the network interface cables. After routing the remaining network interface cables through the cable management guides, you are ready to reinstall the cable management assembly front panel. Position the front panel assembly and insert the front panel tab into the slot at the back of the cable guide system. (See Figure 3-50.) Pivot the front panel assembly down. Make sure that all of the network cables are properly routed, clear of the front panel and that none of them are being pinched. Align the front panel so that you can start the two captive installation screws on the front panel. Caution Step 7 As you reinstall the front panel assembly, make sure that all of the network cables are properly routed over the cable guides, that all network cables maintain the proper bend radius, and that none of the network cables are being pinched between the cable guides and the front panel assembly. Verify that the tab is still engaged in the slot on the back of the cable guide assembly and tighten the two captive installation screws on the front panel assembly. (See Figure 3-51.) OL-5781-08 Catalyst 6500 Series Switches Installation Guide 3-81
- Page 150 and 151: 1 2 3 4 5 6 7 8 9 10 1 1 2 12 3 4 5
- Page 152 and 153: WS-C6500-SFM SWITCH FABRIC MDL WS-C
- Page 154 and 155: WS-C6500-SFM SWITCH FABRIC MDL WS-C
- Page 156 and 157: Installing a Catalyst 6509-V-E Swit
- Page 158 and 159: Installing a Catalyst 6509-V-E Swit
- Page 160 and 161: Installing a Catalyst 6509-V-E Swit
- Page 162 and 163: Installing a Catalyst 6513 or Catal
- Page 164 and 165: WS-X6408 8 PORT GIGABIT ETHERNET WS
- Page 166 and 167: WS-X6K-SUP2-2GE SUPERVISOR2 WS-X6K-
- Page 168 and 169: Generic Installation Procedures Cha
- Page 170 and 171: Generic Installation Procedures Cha
- Page 172 and 173: Establishing the System Ground Chap
- Page 174 and 175: OSM-4OC12 POS-SI 2 1 2 1 4 2 3 1 4
- Page 176 and 177: WS-X6K-SUP2-2GE SUPERVISOR2 WS-X6K-
- Page 178 and 179: 1 2 3 4 5 6 7 8 9 10 1 1 2 12 3 4 5
- Page 180 and 181: Establishing the System Ground Chap
- Page 182 and 183: Attaching the Interface Cables Chap
- Page 184 and 185: Attaching the Interface Cables Chap
- Page 186 and 187: Attaching the Interface Cables Chap
- Page 188 and 189: Attaching the Interface Cables Chap
- Page 190 and 191: Attaching the Interface Cables Chap
- Page 192 and 193: LINK Attaching the Interface Cables
- Page 194 and 195: LINK Attaching the Interface Cables
- Page 196 and 197: Attaching the Interface Cables Chap
- Page 198 and 199: Attaching the Interface Cables Chap
- Page 202 and 203: Attaching the Interface Cables Chap
- Page 204 and 205: Verifying Switch Chassis Installati
- Page 206 and 207: Verifying Switch Chassis Installati
- Page 208 and 209: Removing and Installing the AC-Inpu
- Page 210 and 211: OSM-4OC12 POS-SI 2 1 2 1 4 2 3 1 4
- Page 212 and 213: Removing and Installing the AC-Inpu
- Page 214 and 215: ALL FASTENERS MUST BE FULLY ENGAGED
- Page 216 and 217: Removing and Installing the AC-Inpu
- Page 218 and 219: WS-X6K-SUP2-2GE SUPERVISOR2 WS-X6K-
- Page 220 and 221: Removing and Installing the AC-Inpu
- Page 222 and 223: OSM-4OC12 POS-SI 1 2 1 2 1 1 2 2 3
- Page 224 and 225: Removing and Installing the DC-Inpu
- Page 226 and 227: Removing and Installing the DC-Inpu
- Page 228 and 229: Removing and Installing the DC-Inpu
- Page 230 and 231: Removing and Installing the DC-Inpu
- Page 232 and 233: Removing and Installing the DC-Inpu
- Page 234 and 235: Removing and Installing the DC-Inpu
- Page 236 and 237: Removing and Installing the DC-Inpu
- Page 238 and 239: Removing and Installing the DC-Inpu
- Page 240 and 241: Removing and Installing the DC-Inpu
- Page 242 and 243: Removing and Installing the DC-Inpu
- Page 244 and 245: Removing and Installing the DC-Inpu
- Page 246 and 247: Removing and Installing the DC-Inpu
- Page 248 and 249: Removing and Installing the DC-Inpu
Chapter 3<br />
Installing the Switch<br />
Attaching the Interface Cables<br />
Figure 3-49<br />
Routing Network Cables Through the Cable Management Assembly<br />
280375<br />
Step 4<br />
Step 5<br />
Step 6<br />
Repeat step 3 for the remainder of the network interface cables. After routing the remaining network<br />
interface cables through the cable management guides, you are ready to reinstall the cable management<br />
assembly front panel.<br />
Position the front panel assembly and insert the front panel tab into the slot at the back of the cable guide<br />
system. (See Figure 3-50.)<br />
Pivot the front panel assembly down. Make sure that all of the network cables are properly routed, clear<br />
of the front panel and that none of them are being pinched. Align the front panel so that you can start the<br />
two captive installation screws on the front panel.<br />
Caution<br />
Step 7<br />
As you reinstall the front panel assembly, make sure that all of the network cables are properly routed<br />
over the cable guides, that all network cables maintain the proper bend radius, and that none of the<br />
network cables are being pinched between the cable guides and the front panel assembly.<br />
Verify that the tab is still engaged in the slot on the back of the cable guide assembly and tighten the two<br />
captive installation screws on the front panel assembly. (See Figure 3-51.)<br />
OL-5781-08<br />
<strong>Catalyst</strong> <strong>6500</strong> <strong>Series</strong> <strong>Switches</strong> <strong>Installation</strong> <strong>Guide</strong><br />
3-81