14.11.2014 Views

Catalyst 6500 Series Switches Installation Guide - Ipland

Catalyst 6500 Series Switches Installation Guide - Ipland

Catalyst 6500 Series Switches Installation Guide - Ipland

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Attaching the Interface Cables<br />

Chapter 3<br />

Installing the Switch<br />

Figure 3-48<br />

Disengaging the Front Panel Tab from the Rear of the Cable <strong>Guide</strong> Assembly<br />

280379<br />

Step 3<br />

Connect and route a network cable from one of the chassis module ports up through the cable<br />

management guides and up to the room’s overhead cable trough. When routing network interface cables<br />

through the cable guides, you must allow adequate slack in the network cable so that the cable’s bend<br />

radius is always shallow and so that the cable management assembly can be pivoted down to permit<br />

access to the chassis fan tray assembly.<br />

Tip<br />

To keep the network interface cables organized and minimize the space they occupy, try bundling them<br />

in groups of 12 cables (4 bundles of 12 cables per 48-port module). (See Figure 3-49.)<br />

3-80<br />

<strong>Catalyst</strong> <strong>6500</strong> <strong>Series</strong> <strong>Switches</strong> <strong>Installation</strong> <strong>Guide</strong><br />

OL-5781-08

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!