Catalyst 6500 Series Switches Installation Guide - Ipland
Catalyst 6500 Series Switches Installation Guide - Ipland Catalyst 6500 Series Switches Installation Guide - Ipland
Attaching the Interface Cables Chapter 3 Installing the Switch Using the Catalyst 6509-V-E Cable Management System The optional cable management system on the Catalyst 6509-V-E switch chassis has the capacity to hold several hundred Catagory 5, 6, or 6a copper network interface cables or fiber-optic network interface cables. In order to maximize the capacity of this cable management system, observe the following guidelines: • In a fully populated chassis with every port in use, you may want to route the network cables coming from the ports on the module in slot 9 (left-most slot in the chassis) out the left side of the chassis and the network cables coming from the ports on the module in slot 1 (right-most slot in the chassis) out of the right side of the chassis and up to the room’s overhead cable trough instead of routing them through the chassis cable management system. Routing the cables this way provides additional room for the cables from the chassis inner slots (slot 2 through slot 8 to be routed through the cable management assembly guides then to the overhead trough). • You must make sure that there is adequate slack in each network cable so that the cable management assembly can be disengaged and pivoted down to allow access to the fan trays. • When you route the network cables up from the module port through the cable management guides, you must also allow adequate cable slack to maintain a shallow radius of curvature. Excessive bend in the network cables can break wires and damage connectors. This is especially true with optical-fiber cables, which are more prone to damage from excessive bending and inadequate strain relief than copper cables. If you are attaching and routing network interface cables on a Catalyst 6509-V-E switch chassis that has the cable management system installed, perform the following steps: Step 1 Step 2 Remove the cable management system’s front panel assembly by loosening the two captive installation screws. (See Figure 3-47.) Pivot the front panel assembly up to disengage the front panel tab from the slot at the rear of the cable management assembly. (See Figure 3-48.) This exposes the six cable guides allowing you to route the network interface cables. Set the front panel aside. 3-78 Catalyst 6500 Series Switches Installation Guide OL-5781-08
Chapter 3 Installing the Switch Attaching the Interface Cables Figure 3-47 Removing the Cable Management Front Panel Assembly 2 1 280374 1 Front panel assembly 2 Front panel tab OL-5781-08 Catalyst 6500 Series Switches Installation Guide 3-79
- Page 148 and 149: 1 2 3 4 5 6 7 8 9 10 1 1 2 12 3 4 5
- Page 150 and 151: 1 2 3 4 5 6 7 8 9 10 1 1 2 12 3 4 5
- Page 152 and 153: WS-C6500-SFM SWITCH FABRIC MDL WS-C
- Page 154 and 155: WS-C6500-SFM SWITCH FABRIC MDL WS-C
- Page 156 and 157: Installing a Catalyst 6509-V-E Swit
- Page 158 and 159: Installing a Catalyst 6509-V-E Swit
- Page 160 and 161: Installing a Catalyst 6509-V-E Swit
- Page 162 and 163: Installing a Catalyst 6513 or Catal
- Page 164 and 165: WS-X6408 8 PORT GIGABIT ETHERNET WS
- Page 166 and 167: WS-X6K-SUP2-2GE SUPERVISOR2 WS-X6K-
- Page 168 and 169: Generic Installation Procedures Cha
- Page 170 and 171: Generic Installation Procedures Cha
- Page 172 and 173: Establishing the System Ground Chap
- Page 174 and 175: OSM-4OC12 POS-SI 2 1 2 1 4 2 3 1 4
- Page 176 and 177: WS-X6K-SUP2-2GE SUPERVISOR2 WS-X6K-
- Page 178 and 179: 1 2 3 4 5 6 7 8 9 10 1 1 2 12 3 4 5
- Page 180 and 181: Establishing the System Ground Chap
- Page 182 and 183: Attaching the Interface Cables Chap
- Page 184 and 185: Attaching the Interface Cables Chap
- Page 186 and 187: Attaching the Interface Cables Chap
- Page 188 and 189: Attaching the Interface Cables Chap
- Page 190 and 191: Attaching the Interface Cables Chap
- Page 192 and 193: LINK Attaching the Interface Cables
- Page 194 and 195: LINK Attaching the Interface Cables
- Page 196 and 197: Attaching the Interface Cables Chap
- Page 200 and 201: Attaching the Interface Cables Chap
- Page 202 and 203: Attaching the Interface Cables Chap
- Page 204 and 205: Verifying Switch Chassis Installati
- Page 206 and 207: Verifying Switch Chassis Installati
- Page 208 and 209: Removing and Installing the AC-Inpu
- Page 210 and 211: OSM-4OC12 POS-SI 2 1 2 1 4 2 3 1 4
- Page 212 and 213: Removing and Installing the AC-Inpu
- Page 214 and 215: ALL FASTENERS MUST BE FULLY ENGAGED
- Page 216 and 217: Removing and Installing the AC-Inpu
- Page 218 and 219: WS-X6K-SUP2-2GE SUPERVISOR2 WS-X6K-
- Page 220 and 221: Removing and Installing the AC-Inpu
- Page 222 and 223: OSM-4OC12 POS-SI 1 2 1 2 1 1 2 2 3
- Page 224 and 225: Removing and Installing the DC-Inpu
- Page 226 and 227: Removing and Installing the DC-Inpu
- Page 228 and 229: Removing and Installing the DC-Inpu
- Page 230 and 231: Removing and Installing the DC-Inpu
- Page 232 and 233: Removing and Installing the DC-Inpu
- Page 234 and 235: Removing and Installing the DC-Inpu
- Page 236 and 237: Removing and Installing the DC-Inpu
- Page 238 and 239: Removing and Installing the DC-Inpu
- Page 240 and 241: Removing and Installing the DC-Inpu
- Page 242 and 243: Removing and Installing the DC-Inpu
- Page 244 and 245: Removing and Installing the DC-Inpu
- Page 246 and 247: Removing and Installing the DC-Inpu
Chapter 3<br />
Installing the Switch<br />
Attaching the Interface Cables<br />
Figure 3-47<br />
Removing the Cable Management Front Panel Assembly<br />
2<br />
1<br />
280374<br />
1 Front panel assembly 2 Front panel tab<br />
OL-5781-08<br />
<strong>Catalyst</strong> <strong>6500</strong> <strong>Series</strong> <strong>Switches</strong> <strong>Installation</strong> <strong>Guide</strong><br />
3-79