14.11.2014 Views

Catalyst 6500 Series Switches Installation Guide - Ipland

Catalyst 6500 Series Switches Installation Guide - Ipland

Catalyst 6500 Series Switches Installation Guide - Ipland

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Chapter 3<br />

Installing the Switch<br />

Attaching the Interface Cables<br />

Figure 3-42<br />

Cabling a CX4 (Copper) XENPAK Transceiver<br />

XENPAK-10GB-CX4<br />

4X InfiniBand<br />

connector<br />

CAB-INF-28G-5<br />

130146<br />

Installing and Cabling 10GBASE-X X2 Transceiver Uplink Ports<br />

The 10-Gigabit X2 transceiver can have either a spring-loaded latch sleeve or a latch sleeve that is not<br />

spring loaded. Both transceiver types are functionally identical.<br />

Caution<br />

The X2 transceiver is a static-sensitive device. Always use an ESD wrist strap or similar individual<br />

grounding device when handling X2 transceivers or coming in contact with system modules.<br />

To install an X2 transceiver uplink port, follow these steps:<br />

Step 1<br />

Step 2<br />

Using a small flat-blade screwdriver, carefully pry the X2 transceiver port cover off of the supervisor<br />

engine faceplate.<br />

Use the two arrows on the port cover as guides for inserting the screwdriver blade. Save the port cover<br />

for future use.<br />

Remove the X2 transceiver from its protective packaging.<br />

Note<br />

Do not remove the optical bore dust plugs until directed to do so later in the procedure.<br />

Step 3<br />

Check the label on the X2 transceiver body to verify that you have the correct model for your network.<br />

OL-5781-08<br />

<strong>Catalyst</strong> <strong>6500</strong> <strong>Series</strong> <strong>Switches</strong> <strong>Installation</strong> <strong>Guide</strong><br />

3-73

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!