Catalyst 6500 Series Switches Installation Guide - Ipland

Catalyst 6500 Series Switches Installation Guide - Ipland Catalyst 6500 Series Switches Installation Guide - Ipland

ipland.com.ua
from ipland.com.ua More from this publisher
14.11.2014 Views

Establishing the System Ground Chapter 3 Installing the Switch Figure 3-33 Installing the System Ground Lug on the 8700 W Power Supply Wire System grounding studs Grounding lug M4 flat washer Split-ring washer M4 nut o INPUT OK FAN OK OUTPUT FAIL NC RELAY 182182 CISCO SYSTEMS, INC. 1 2 3 220VAC 1 2 3 DEFAULT NO RELAY 3-60 Catalyst 6500 Series Switches Installation Guide OL-5781-08

Chapter 3 Installing the Switch Installing the Power Supplies in the Switch Chassis Installing the Power Supplies in the Switch Chassis The chassis secondary power supplies (AC or DC) are shipped separately from the switch chassis. Remove the power supply from its shipping packaging, and then install and connect it to the site power by referring to the “Removing and Installing the AC-Input Power Supplies” section on page 4-2 or the “Removing and Installing the DC-Input Power Supplies” section on page 4-15. Verify that you have the correct power supply (AC-input or DC-input and the correct wattage) for your configuration. Note AC-input and DC-input power supplies can be mixed in a chassis. Attaching the Interface Cables This section provides general information on attaching interface cables to the supervisor engines and to the modules. Note Refer to the Catalyst 6500 Series Switch Module Guide for additional module information. Connecting the Supervisor Engine Console Port This section describes how to connect to the supervisor engine console port from a terminal or modem. The console port on the supervisor engine allows you to perform the following functions: • Configure the switch from the CLI. • Monitor network statistics and errors. • Configure SNMP agent parameters. • Download software updates to the switch, or distribute software images residing in flash memory to attached devices. The console port, located on the front panel of the supervisor engine, is shown in Figure 3-34. Figure 3-34 Supervisor Engine Console Port Connector WS-X6K-SUP2-2GE STATUS SYSTEM CONSOLE PWR LIGHT RESET CONSOLE PORT MODE SUPERVISOR 2 CONSOLE 62226 OL-5781-08 Catalyst 6500 Series Switches Installation Guide 3-61

Chapter 3<br />

Installing the Switch<br />

Installing the Power Supplies in the Switch Chassis<br />

Installing the Power Supplies in the Switch Chassis<br />

The chassis secondary power supplies (AC or DC) are shipped separately from the switch chassis.<br />

Remove the power supply from its shipping packaging, and then install and connect it to the site power<br />

by referring to the “Removing and Installing the AC-Input Power Supplies” section on page 4-2 or the<br />

“Removing and Installing the DC-Input Power Supplies” section on page 4-15. Verify that you have the<br />

correct power supply (AC-input or DC-input and the correct wattage) for your configuration.<br />

Note<br />

AC-input and DC-input power supplies can be mixed in a chassis.<br />

Attaching the Interface Cables<br />

This section provides general information on attaching interface cables to the supervisor engines and to<br />

the modules.<br />

Note<br />

Refer to the <strong>Catalyst</strong> <strong>6500</strong> <strong>Series</strong> Switch Module <strong>Guide</strong> for additional module information.<br />

Connecting the Supervisor Engine Console Port<br />

This section describes how to connect to the supervisor engine console port from a terminal or modem.<br />

The console port on the supervisor engine allows you to perform the following functions:<br />

• Configure the switch from the CLI.<br />

• Monitor network statistics and errors.<br />

• Configure SNMP agent parameters.<br />

• Download software updates to the switch, or distribute software images residing in flash memory to<br />

attached devices.<br />

The console port, located on the front panel of the supervisor engine, is shown in Figure 3-34.<br />

Figure 3-34<br />

Supervisor Engine Console Port Connector<br />

WS-X6K-SUP2-2GE<br />

STATUS<br />

SYSTEM<br />

CONSOLE<br />

PWR LIGHT<br />

RESET<br />

CONSOLE<br />

PORT<br />

MODE<br />

SUPERVISOR 2<br />

CONSOLE<br />

62226<br />

OL-5781-08<br />

<strong>Catalyst</strong> <strong>6500</strong> <strong>Series</strong> <strong>Switches</strong> <strong>Installation</strong> <strong>Guide</strong><br />

3-61

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!