Chapter 3<br />

Installing the Switch<br />

Establishing the System Ground<br />

Installing the System Ground on an 8700 W Power Supply<br />

If you have a <strong>Catalyst</strong> 6506, <strong>Catalyst</strong> 6509, or <strong>Catalyst</strong> 6509-NEB chassis with an 8700 W power supply<br />

installed, you must attach the system ground lug to the two system ground studs on the power supply<br />

faceplate. The extended depth of the 8700 W power supply blocks access to the system ground pad on<br />

the switch chassis.<br />

To attach the system ground lug and cable to the power supply ground studs, follow these steps:<br />

Step 1<br />

Step 2<br />

Step 3<br />

Step 4<br />

Step 5<br />

Step 6<br />

Step 7<br />

Use a wire-stripping tool to remove approximately 0.75 inch (19 mm) of the covering from the end of<br />

the grounding wire.<br />

Insert the stripped end of the grounding wire into the open end of the grounding lug.<br />

Crimp the grounding wire in the barrel of the grounding lug. Verify that the ground wire is securely<br />

attached to the ground lug.<br />

Remove the M4 nuts, split-ring washers, flat washers from the two system ground studs on the power<br />

supply.<br />

Position the grounding lug over the two system ground studs on the 8700 W power supply faceplate. (See<br />

Figure 3-33.) Ensure that the grounding lug and the grounding wire will not interfere with other switch<br />

hardware or rack equipment.<br />

Install one flat washer and one split-ring washer over each system ground stud. Secure the system<br />

grounding lug and washers in place with the two M4 nuts.<br />

Prepare the other end of the grounding wire, and connect it to an appropriate grounding point in your<br />

site to ensure adequate earth ground for the switch.<br />

OL-5781-08<br />

<strong>Catalyst</strong> <strong>6500</strong> <strong>Series</strong> <strong>Switches</strong> <strong>Installation</strong> <strong>Guide</strong><br />

3-59

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!