14.11.2014 Views

Catalyst 6500 Series Switches Installation Guide - Ipland

Catalyst 6500 Series Switches Installation Guide - Ipland

Catalyst 6500 Series Switches Installation Guide - Ipland

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

WS-X6K-SUP2-2GE<br />

SUPERVISOR2<br />

WS-X6K-SUP2-2GE<br />

SUPERVISOR2<br />

WS-X6408<br />

8 PORT GIGABIT ETHERNET<br />

WS-X6408<br />

8 PORT GIGABIT ETHERNET<br />

WS-X6408<br />

8 PORT GIGABIT ETHERNET<br />

WS-X6 24<br />

24 PORT 1 0FX<br />

WS-X6 24<br />

24 PORT 1 0FX<br />

WS-X6 24<br />

24 PORT 1 0FX<br />

WS-X6 24<br />

24 PORT 1 0FX<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

RESET<br />

RESET<br />

2<br />

2<br />

2<br />

2<br />

CONSOLE<br />

CONSOLE<br />

3<br />

3<br />

3<br />

3<br />

4<br />

4<br />

4<br />

4<br />

CONSOLE<br />

PORT<br />

MODE<br />

CONSOLE<br />

PORT<br />

MODE<br />

5<br />

5<br />

5<br />

5<br />

6<br />

6<br />

6<br />

6<br />

7<br />

7<br />

7<br />

7<br />

8<br />

8<br />

8<br />

8<br />

9<br />

9<br />

9<br />

9<br />

PCMCIA EJECT<br />

PCMCIA EJECT<br />

10<br />

10<br />

10<br />

10<br />

1<br />

1<br />

1<br />

11<br />

12<br />

12<br />

12<br />

12<br />

13<br />

13<br />

13<br />

13<br />

14<br />

14<br />

14<br />

14<br />

15<br />

15<br />

15<br />

15<br />

Switch Load<br />

1 0%<br />

1%<br />

Switch Load<br />

1 0%<br />

1%<br />

16<br />

16<br />

16<br />

16<br />

17<br />

17<br />

17<br />

17<br />

18<br />

18<br />

18<br />

18<br />

PORT 1 PORT 2<br />

19<br />

19<br />

19<br />

19<br />

LINK<br />

PORT 1 PORT 2<br />

LINK<br />

20<br />

20<br />

20<br />

20<br />

21<br />

21<br />

21<br />

21<br />

2<br />

2<br />

2<br />

2<br />

LINK<br />

LINK<br />

23<br />

23<br />

23<br />

23<br />

24<br />

24<br />

24<br />

24<br />

Installing a <strong>Catalyst</strong> 6513 or <strong>Catalyst</strong> 6513-E Switch Chassis<br />

Chapter 3<br />

Installing the Switch<br />

Figure 3-24<br />

Installing the <strong>Catalyst</strong> 6513 Switch Chassis in the Rack<br />

L-bracket<br />

1<br />

STATUS<br />

SYSTEM<br />

CONSOLE<br />

PWR MGMT<br />

2<br />

STATUS<br />

SYSTEM<br />

CONSOLE<br />

PWR MGMT<br />

3<br />

4<br />

5<br />

6<br />

STATUS<br />

2 3 4 5 6 7 8<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

7<br />

STATUS<br />

2 3 4 5 6 7 8<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

8<br />

STATUS<br />

2 3 4 5 6 7 8<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

9<br />

FAN<br />

STATUS<br />

10<br />

11<br />

12<br />

13<br />

STATUS<br />

STATUS<br />

STATUS<br />

STATUS<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

LINK<br />

12 x 24<br />

or<br />

10 x 32<br />

(10x)<br />

Cable guide<br />

Shelf<br />

bracket<br />

48125<br />

What is Next<br />

After installing the chassis in its location, complete the installation process by following these<br />

procedures:<br />

• Connecting the chassis to system ground. See “Establishing the System Ground” section on<br />

page 3-52.<br />

• Installing and connecting the power supplies to source power. Go to Chapter 4 for information on<br />

how to install and cable power supplies.<br />

• Connecting the network interface cables to the supervisor engine and modules. This may involve<br />

installing transceivers before you attach the network interface cables. See “Attaching the Interface<br />

Cables” section on page 3-61.<br />

• Powering-up the chassis and verifying the installation. See “Verifying Switch Chassis <strong>Installation</strong>”<br />

section on page 3-84.<br />

3-46<br />

<strong>Catalyst</strong> <strong>6500</strong> <strong>Series</strong> <strong>Switches</strong> <strong>Installation</strong> <strong>Guide</strong><br />

OL-5781-08

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!