Installing a <strong>Catalyst</strong> 6513 or <strong>Catalyst</strong> 6513-E Switch Chassis<br />

Chapter 3<br />

Installing the Switch<br />

What is Next<br />

After installing the chassis in its location, complete the installation process by following these<br />

procedures:<br />

• Connecting the chassis to system ground. See “Establishing the System Ground” section on<br />

page 3-52.<br />

• Installing and connecting the power supplies to source power. Go to Chapter 4 for information on<br />

how to install and cable power supplies.<br />

• Connecting the network interface cables to the supervisor engine and modules. This may involve<br />

installing transceivers before you attach the network interface cables. See “Attaching the Interface<br />

Cables” section on page 3-61.<br />

Note<br />

If you are going to use the cable management system to route the network interface cables, refer<br />

to “Using the <strong>Catalyst</strong> 6509-V-E Cable Management System” section on page 3-78.<br />

• Powering-up the chassis and verifying the installation. See “Verifying Switch Chassis <strong>Installation</strong>”<br />

section on page 3-84.<br />

Optional <strong>Installation</strong> Kits<br />

There are no optional installation kits for the <strong>Catalyst</strong> 6509-V-E switch chassis.<br />

Installing a <strong>Catalyst</strong> 6513 or <strong>Catalyst</strong> 6513-E Switch Chassis<br />

This section provides a procedure for installing either a <strong>Catalyst</strong> 6513 or <strong>Catalyst</strong> 6513-E switch chassis<br />

in a rack assembly and installing the optional cable guide assemblies.<br />

<strong>Installation</strong> Accessory Kit<br />

The <strong>Catalyst</strong> 6513 and the <strong>Catalyst</strong> 6513-E switch chassis are designed to be installed in a standard<br />

19-inch rack either open or enclosed. The chassis is shipped with the 19-inch rack-mount brackets<br />

factory installed on the left-front and right-front of the chassis. Included in the accessory kit are 10-32<br />

x 0.75-inch and 12-24 x 0.75-inch screws that are used to secure the chassis in the rack.<br />

Note Depending on the manufacturer, the rack posts might be prethreaded to accept either 10-32 or 12-24<br />

screws. If the rack posts are not prethreaded, you must install 10-32 or 12-24 clip nuts or cage nuts to<br />

secure the rack-mount screws. The clip nuts or the cage nuts are not included as part of the accessory kit<br />

and must be obtained on your own.<br />

3-42<br />

<strong>Catalyst</strong> <strong>6500</strong> <strong>Series</strong> <strong>Switches</strong> <strong>Installation</strong> <strong>Guide</strong><br />

OL-5781-08

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!