Catalyst 6500 Series Switches Installation Guide - Ipland
Catalyst 6500 Series Switches Installation Guide - Ipland Catalyst 6500 Series Switches Installation Guide - Ipland
Installing a Catalyst 6509-V-E Switch Chassis Chapter 3 Installing the Switch Installing the Cable Management System (Optional) The accessory kit for the Catalyst 6509-V-E switch chassis includes an optional cable management system that is installed on the front of the switch chassis. This cable management system is only available for the Catalyst 6509-V-E switch chassis. Note The cable management system adds an additional 6.8 inches (17.3 cm) (measured to the outside of the thumbscrews) to the overall depth of the chassis. To install the cable management system on the chassis, perform the following steps: Step 1 Step 2 Step 3 Step 4 Remove the cable management assembly from the packing material. Locate the bag containing the four 6-32 screws that accompanied the cable management assembly. Loosen the two captive screws on the inside of the cable management assembly and pivot the cable guide assembly away from the attachment bracket. (See Figure 3-21.) Position the cable management assembly in front of the chassis, align the four screw holes in the attachment bracket with the corresponding screw holes in the chassis, and secure the cable management assembly in place with the four 6-32 screws. (See Figure 3-21.) Figure 3-21 Installing the Catalyst 6509-V-E Cable Management Assembly 3 2 1 280372 3-40 Catalyst 6500 Series Switches Installation Guide OL-5781-08
Chapter 3 Installing the Switch Installing a Catalyst 6509-V-E Switch Chassis 1 Cable guide assembly 2 6-32 screws (4x) 3 Attachment bracket Step 5 Pivot the cable management assembly up on its hinges so that the back plate of the assembly is flush against the chassis. Secure the cable management assembly in place to the front of the chassis with the two captive installation screws. (See Figure 3-22.) Figure 3-22 Securing the Cable Management Assembly to the Front of the Chassis 1 280373 1 Captive installation screws (2x) OL-5781-08 Catalyst 6500 Series Switches Installation Guide 3-41
- Page 110 and 111: Site Requirements Chapter 2 Prepari
- Page 112 and 113: Site Requirements Chapter 2 Prepari
- Page 114 and 115: Site Requirements Chapter 2 Prepari
- Page 116 and 117: Power Requirements Chapter 2 Prepar
- Page 118 and 119: Cabling Requirements Chapter 2 Prep
- Page 120 and 121: Site Preparation Checklist Chapter
- Page 122 and 123: Chapter 3 Installing the Switch The
- Page 124 and 125: Rack-Mounting Guidelines Chapter 3
- Page 126 and 127: Chassis Installation Kits and Cable
- Page 128 and 129: Installing a Catalyst 6503 or Catal
- Page 130 and 131: CAUTION STATUS LINK CONSOLE LINK LI
- Page 132 and 133: Installing a Catalyst 6504-E Switch
- Page 134 and 135: WS-SUP32-GE-3B CAUTION STATUS LINK
- Page 136 and 137: Installing a Catalyst 6504-E Switch
- Page 138 and 139: WS-X6408 8 PORT GIGABIT ETHERNET WS
- Page 140 and 141: WS-X6408 8 PORT GIGABIT ETHERNET WS
- Page 142 and 143: WS-X6408 WS-X6408 WS-X6224 24 PORT
- Page 144 and 145: WS-X6408 WS-X6408 WS-X6224 24 PORT
- Page 146 and 147: Installing a Catalyst 6509-NEB or C
- Page 148 and 149: 1 2 3 4 5 6 7 8 9 10 1 1 2 12 3 4 5
- Page 150 and 151: 1 2 3 4 5 6 7 8 9 10 1 1 2 12 3 4 5
- Page 152 and 153: WS-C6500-SFM SWITCH FABRIC MDL WS-C
- Page 154 and 155: WS-C6500-SFM SWITCH FABRIC MDL WS-C
- Page 156 and 157: Installing a Catalyst 6509-V-E Swit
- Page 158 and 159: Installing a Catalyst 6509-V-E Swit
- Page 162 and 163: Installing a Catalyst 6513 or Catal
- Page 164 and 165: WS-X6408 8 PORT GIGABIT ETHERNET WS
- Page 166 and 167: WS-X6K-SUP2-2GE SUPERVISOR2 WS-X6K-
- Page 168 and 169: Generic Installation Procedures Cha
- Page 170 and 171: Generic Installation Procedures Cha
- Page 172 and 173: Establishing the System Ground Chap
- Page 174 and 175: OSM-4OC12 POS-SI 2 1 2 1 4 2 3 1 4
- Page 176 and 177: WS-X6K-SUP2-2GE SUPERVISOR2 WS-X6K-
- Page 178 and 179: 1 2 3 4 5 6 7 8 9 10 1 1 2 12 3 4 5
- Page 180 and 181: Establishing the System Ground Chap
- Page 182 and 183: Attaching the Interface Cables Chap
- Page 184 and 185: Attaching the Interface Cables Chap
- Page 186 and 187: Attaching the Interface Cables Chap
- Page 188 and 189: Attaching the Interface Cables Chap
- Page 190 and 191: Attaching the Interface Cables Chap
- Page 192 and 193: LINK Attaching the Interface Cables
- Page 194 and 195: LINK Attaching the Interface Cables
- Page 196 and 197: Attaching the Interface Cables Chap
- Page 198 and 199: Attaching the Interface Cables Chap
- Page 200 and 201: Attaching the Interface Cables Chap
- Page 202 and 203: Attaching the Interface Cables Chap
- Page 204 and 205: Verifying Switch Chassis Installati
- Page 206 and 207: Verifying Switch Chassis Installati
- Page 208 and 209: Removing and Installing the AC-Inpu
Chapter 3<br />
Installing the Switch<br />
Installing a <strong>Catalyst</strong> 6509-V-E Switch Chassis<br />
1 Cable guide assembly 2 6-32 screws (4x)<br />
3 Attachment bracket<br />
Step 5<br />
Pivot the cable management assembly up on its hinges so that the back plate of the assembly is flush<br />
against the chassis. Secure the cable management assembly in place to the front of the chassis with the<br />
two captive installation screws. (See Figure 3-22.)<br />
Figure 3-22<br />
Securing the Cable Management Assembly to the Front of the Chassis<br />
1<br />
280373<br />
1 Captive installation screws (2x)<br />
OL-5781-08<br />
<strong>Catalyst</strong> <strong>6500</strong> <strong>Series</strong> <strong>Switches</strong> <strong>Installation</strong> <strong>Guide</strong><br />
3-41