Catalyst 6500 Series Switches Installation Guide - Ipland

Catalyst 6500 Series Switches Installation Guide - Ipland Catalyst 6500 Series Switches Installation Guide - Ipland

ipland.com.ua
from ipland.com.ua More from this publisher
14.11.2014 Views

Installing a Catalyst 6509-V-E Switch Chassis Chapter 3 Installing the Switch Installing the Cable Management System (Optional) The accessory kit for the Catalyst 6509-V-E switch chassis includes an optional cable management system that is installed on the front of the switch chassis. This cable management system is only available for the Catalyst 6509-V-E switch chassis. Note The cable management system adds an additional 6.8 inches (17.3 cm) (measured to the outside of the thumbscrews) to the overall depth of the chassis. To install the cable management system on the chassis, perform the following steps: Step 1 Step 2 Step 3 Step 4 Remove the cable management assembly from the packing material. Locate the bag containing the four 6-32 screws that accompanied the cable management assembly. Loosen the two captive screws on the inside of the cable management assembly and pivot the cable guide assembly away from the attachment bracket. (See Figure 3-21.) Position the cable management assembly in front of the chassis, align the four screw holes in the attachment bracket with the corresponding screw holes in the chassis, and secure the cable management assembly in place with the four 6-32 screws. (See Figure 3-21.) Figure 3-21 Installing the Catalyst 6509-V-E Cable Management Assembly 3 2 1 280372 3-40 Catalyst 6500 Series Switches Installation Guide OL-5781-08

Chapter 3 Installing the Switch Installing a Catalyst 6509-V-E Switch Chassis 1 Cable guide assembly 2 6-32 screws (4x) 3 Attachment bracket Step 5 Pivot the cable management assembly up on its hinges so that the back plate of the assembly is flush against the chassis. Secure the cable management assembly in place to the front of the chassis with the two captive installation screws. (See Figure 3-22.) Figure 3-22 Securing the Cable Management Assembly to the Front of the Chassis 1 280373 1 Captive installation screws (2x) OL-5781-08 Catalyst 6500 Series Switches Installation Guide 3-41

Chapter 3<br />

Installing the Switch<br />

Installing a <strong>Catalyst</strong> 6509-V-E Switch Chassis<br />

1 Cable guide assembly 2 6-32 screws (4x)<br />

3 Attachment bracket<br />

Step 5<br />

Pivot the cable management assembly up on its hinges so that the back plate of the assembly is flush<br />

against the chassis. Secure the cable management assembly in place to the front of the chassis with the<br />

two captive installation screws. (See Figure 3-22.)<br />

Figure 3-22<br />

Securing the Cable Management Assembly to the Front of the Chassis<br />

1<br />

280373<br />

1 Captive installation screws (2x)<br />

OL-5781-08<br />

<strong>Catalyst</strong> <strong>6500</strong> <strong>Series</strong> <strong>Switches</strong> <strong>Installation</strong> <strong>Guide</strong><br />

3-41

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!