14.11.2014 Views

Catalyst 6500 Series Switches Installation Guide - Ipland

Catalyst 6500 Series Switches Installation Guide - Ipland

Catalyst 6500 Series Switches Installation Guide - Ipland

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Installing a <strong>Catalyst</strong> 6509-V-E Switch Chassis<br />

Chapter 3<br />

Installing the Switch<br />

Rack-Mounting the Chassis<br />

Tip<br />

We recommend that you have a third person to assist in this procedure.<br />

Caution<br />

For easier installation, the chassis should be empty when you install it in the rack.<br />

Warning<br />

Two people are required to lift the chassis. To prevent injury, keep your back straight and lift with your<br />

legs, not your back. Statement 164<br />

To install the switch chassis in the equipment rack, follow these steps:<br />

Step 1<br />

Step 2<br />

Step 3<br />

Step 4<br />

Step 5<br />

With a person standing at each side of the chassis, grasp the chassis handle with one hand, and use the<br />

other hand near the back of the chassis for balance. Slowly lift the chassis in unison. Avoid sudden twists<br />

or moves to prevent injury.<br />

Position the chassis in the rack as follows:<br />

a. If the front of the chassis (front panel) is at the front of the rack, insert the rear of the chassis between<br />

the mounting posts, resting the chassis on the shelf brackets, and then carefully slide the chassis into<br />

the rack.<br />

b. If the rear of the chassis is at the front of the rack, insert the front of the chassis between the<br />

mounting posts, resting the chassis on the shelf brackets, and then carefully slide the chassis into the<br />

rack.<br />

Align the mounting holes in the L bracket with the mounting holes in the equipment rack.<br />

Install the eight or ten (four or five per side) 12-24 x 3/4-inch or 10-32 x 3/4-inch screws through the<br />

holes in the L bracket mounting holes, and into the threaded holes in the equipment rack posts. (See<br />

Figure 3-20.)<br />

Use a tape measure and level to verify that the chassis is installed straight and level.<br />

3-38<br />

<strong>Catalyst</strong> <strong>6500</strong> <strong>Series</strong> <strong>Switches</strong> <strong>Installation</strong> <strong>Guide</strong><br />

OL-5781-08

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!