14.11.2014 Views

Catalyst 6500 Series Switches Installation Guide - Ipland

Catalyst 6500 Series Switches Installation Guide - Ipland

Catalyst 6500 Series Switches Installation Guide - Ipland

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Installing a <strong>Catalyst</strong> 6509-V-E Switch Chassis<br />

Chapter 3<br />

Installing the Switch<br />

Installing a <strong>Catalyst</strong> 6509-V-E Switch Chassis<br />

This section provides procedures for installing a <strong>Catalyst</strong> 6509-V-E switch chassis in a rack assembly<br />

and installing the optional cable guide system.<br />

<strong>Installation</strong> Accessory Kit<br />

The <strong>Catalyst</strong> 6509-V-E switch chassis is designed to be installed in a standard 19-inch rack, either open<br />

or enclosed. The chassis is shipped with the 19-inch rack mount L brackets installed on the left-front and<br />

right-front of the chassis. Included in the accessory kit are 10-32 x 0.75-inch and 12-24 x 0.75-inch<br />

screws used to secure the chassis in the rack enclosure.<br />

Note Depending on the manufacturer, the rack posts might be prethreaded to accept either 10-32 or 12-24<br />

screws. If the rack posts are not prethreaded, you must install 10-32 or 12-24 clip nuts or cage nuts to<br />

secure the rack-mount screws. The clip nuts or the cage nuts are not included as part of the accessory kit<br />

and must be obtained on your own.<br />

Included in the accessory kit is the rack-mount shelf kit. The rack-mount shelf kit is used to support the<br />

weight of the chassis while you secure the chassis L brackets to the rack enclosure.<br />

Also included in the <strong>Catalyst</strong> 6509-V-E switch accessory kit:<br />

• Cable management system—The optional cable management system can be attached to the front of<br />

the chassis.<br />

• Power supply blank panel—The power supply blank panel must be installed on an unused power<br />

supply bay to maintain chassis airflow and EMI shielding.<br />

L Brackets on the <strong>Catalyst</strong> 6509-V-E Switch Chassis<br />

The <strong>Catalyst</strong> 6509-V-E switch chassis is shipped with the two L brackets installed on the front sides of<br />

the chassis. Each L bracket is secured to the chassis with 14 M4 Phillips-head countersunk screws (seven<br />

screws on each side) as shown in Figure 3-19.<br />

Note<br />

The L brackets can also be reversed and installed on the rear of the chassis as an alternative method of<br />

installation.<br />

3-36<br />

<strong>Catalyst</strong> <strong>6500</strong> <strong>Series</strong> <strong>Switches</strong> <strong>Installation</strong> <strong>Guide</strong><br />

OL-5781-08

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!