Catalyst 6500 Series Switches Installation Guide - Ipland

Catalyst 6500 Series Switches Installation Guide - Ipland Catalyst 6500 Series Switches Installation Guide - Ipland

ipland.com.ua
from ipland.com.ua More from this publisher
14.11.2014 Views

WS-C6500-SFM SWITCH FABRIC MDL WS-C6500-SFM SWITCH FABRIC MDL Installing a Catalyst 6509-NEB or Catalyst 6509-NEB-A Switch Chassis Chapter 3 Installing the Switch Step 4 Install the standard cable guide to the back panel by securing the lip of the cable guide to the back panel. (See Figure 3-17.) Step 5 Install the two screws to secure the cable guide to the back plate. (See Figure 3-17.) Note Before installing the front panel, attach the interface cables to the modules, and route the cables through the cable guide. See the “Attaching the Interface Cables” section on page 3-61 for information on attaching the interface cables. Step 6 Attach the interface cables to the modules, and route the cables through the cable guide. Step 7 Install the front panel by hooking the top of the front panel over the cable guide. Step 8 Tighten the two captive installation screws. (See Figure 3-18.) Figure 3-18 Front Panel Installation FAN STATUS 99970 FAN 1 FAN 2 OSM-8OC3-POS MM 8 PORT OC3 POS MM 8 PORT OC3 POS STATUS OSM-8OC3-POS MM STATUS OC12 POS MM STATUS OSM-40C12-POS-MM STAT STATUS OC12 POS MM STATUS OSM-40C12-POS-MM OC12 POS MM STATUS OSM-40C12-POS-MM SUPERVISOR2 STATUS SYSTEM WS-X6K-SUP2-2GE SUPERVISOR2 STATUS SYSTEM WS-X6K-SUP2-2GE Captive installation screws 3-34 Catalyst 6500 Series Switches Installation Guide OL-5781-08

Chapter 3 Installing the Switch Installing a Catalyst 6509-NEB or Catalyst 6509-NEB-A Switch Chassis What is Next After installing the chassis in its location, complete the installation process by performing these procedures: • Connecting the chassis to system ground. See “Establishing the System Ground” section on page 3-52. • Installing and connecting the power supplies to source power. Go to Chapter 4 for information on how to install and cable power supplies. • Connecting the network interface cables to the supervisor engine and modules. This may involve installing transceivers before you attach the network interface cables. See “Attaching the Interface Cables” section on page 3-61. • Powering-up the chassis and verifying the installation. See “Verifying Switch Chassis Installation” section on page 3-84. Optional Installation Kits The Catalyst 6509-NEB accessory kit has an optional stabilizer bracket installation kit included. This kit contains the parts necessary to install two brackets on the bottom of the chassis to provide additional stability for the chassis when the chassis is not rack mounted allowing the chassis to placed on a shelf or a table. To install the stabilizer brackets, go to “Installing the Stabilizer Bracket Kit” section on page 3-50. OL-5781-08 Catalyst 6500 Series Switches Installation Guide 3-35

WS-C<strong>6500</strong>-SFM<br />

SWITCH FABRIC MDL<br />

WS-C<strong>6500</strong>-SFM<br />

SWITCH FABRIC MDL<br />

Installing a <strong>Catalyst</strong> 6509-NEB or <strong>Catalyst</strong> 6509-NEB-A Switch Chassis<br />

Chapter 3<br />

Installing the Switch<br />

Step 4<br />

Install the standard cable guide to the back panel by securing the lip of the cable guide to the back panel.<br />

(See Figure 3-17.)<br />

Step 5 Install the two screws to secure the cable guide to the back plate. (See Figure 3-17.)<br />

Note<br />

Before installing the front panel, attach the interface cables to the modules, and route the cables<br />

through the cable guide. See the “Attaching the Interface Cables” section on page 3-61 for<br />

information on attaching the interface cables.<br />

Step 6 Attach the interface cables to the modules, and route the cables through the cable guide.<br />

Step 7 Install the front panel by hooking the top of the front panel over the cable guide.<br />

Step 8 Tighten the two captive installation screws. (See Figure 3-18.)<br />

Figure 3-18<br />

Front Panel <strong>Installation</strong><br />

FAN<br />

STATUS<br />

99970<br />

FAN 1<br />

FAN 2<br />

OSM-8OC3-POS MM<br />

8 PORT OC3 POS MM<br />

8 PORT OC3 POS<br />

STATUS<br />

OSM-8OC3-POS MM<br />

STATUS<br />

OC12 POS MM<br />

STATUS<br />

OSM-40C12-POS-MM<br />

STAT<br />

STATUS<br />

OC12 POS MM<br />

STATUS<br />

OSM-40C12-POS-MM<br />

OC12 POS MM<br />

STATUS<br />

OSM-40C12-POS-MM<br />

SUPERVISOR2<br />

STATUS<br />

SYSTEM<br />

WS-X6K-SUP2-2GE<br />

SUPERVISOR2<br />

STATUS<br />

SYSTEM<br />

WS-X6K-SUP2-2GE<br />

Captive installation screws<br />

3-34<br />

<strong>Catalyst</strong> <strong>6500</strong> <strong>Series</strong> <strong>Switches</strong> <strong>Installation</strong> <strong>Guide</strong><br />

OL-5781-08

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!