14.11.2014 Views

Catalyst 6500 Series Switches Installation Guide - Ipland

Catalyst 6500 Series Switches Installation Guide - Ipland

Catalyst 6500 Series Switches Installation Guide - Ipland

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Installing a <strong>Catalyst</strong> 6509-NEB or <strong>Catalyst</strong> 6509-NEB-A Switch Chassis<br />

Chapter 3<br />

Installing the Switch<br />

Installing a <strong>Catalyst</strong> 6509-NEB or <strong>Catalyst</strong> 6509-NEB-A Switch<br />

Chassis<br />

This section provides procedures for installing either a <strong>Catalyst</strong> 6509-NEB or a <strong>Catalyst</strong> 6509-NEB-A<br />

switch chassis in a rack assembly and installing the optional cable guides.<br />

<strong>Installation</strong> Accessory Kits<br />

The <strong>Catalyst</strong> 6509-NEB and <strong>Catalyst</strong> 6509-NEB-A switch chassis are designed to be installed in a<br />

standard 19-inch rack, either open or enclosed. Both chassis are normally shipped with the 19-inch<br />

rack-mount L brackets factory installed on the left-front and right-front of the chassis. Included with the<br />

accessory kit are 10-32 x 0.75-inch and 12-24 x 0.75-inch screws that are used to secure the chassis in<br />

the rack enclosure.<br />

Note Depending on the manufacturer, the rack posts might be prethreaded to accept either 10-32 or 12-24<br />

screws. If the rack posts are not prethreaded, you must install 10-32 or 12-24 clip nuts or cage nuts to<br />

secure the rack-mount screws. The clip nuts or the cage nuts are not included as part of the accessory kit<br />

and must be obtained on your own.<br />

Depending on the chassis model, the accessory kit might contain the following chassis installation kits:<br />

• Rack-mount shelf kit (<strong>Catalyst</strong> 6509-NEB and <strong>Catalyst</strong> 6509-NEB-A). The rack-mount shelf kit is<br />

used to support the weight of the chassis while you secure the chassis L brackets to the rack<br />

enclosure.<br />

• A stabilizer bracket kit (<strong>Catalyst</strong> 6509-NEB only). If you are not installing the <strong>Catalyst</strong> 6509-NEB<br />

switch in a rack, you must install the stabilizer brackets to the bottom of the chassis. The stabilizer<br />

brackets reduce the possibility that the freestanding switch chassis will tip over.<br />

Also included in the <strong>Catalyst</strong> 6509-NEB accessory kit:<br />

• One cable guide—The optional cable guide can be mounted to the front of the chassis.<br />

• Power supply blank panel—The power supply blank panel must be installed on an unused power<br />

supply bay to maintain chassis airflow and EMI shielding.<br />

Also included in the <strong>Catalyst</strong> 6509-NEB-A accessory kit:<br />

• Cable management system—The optional cable management kit can be installed on the upper front<br />

of the chassis.<br />

• Power supply blank panel—The power supply blank panel must be installed on an unused power<br />

supply bay to maintain chassis airflow and EMI shielding.<br />

L Brackets and the Optional Cable <strong>Guide</strong> on the <strong>Catalyst</strong> 6509-NEB Switch<br />

The <strong>Catalyst</strong> 6509-NEB switch chassis is shipped with the two L brackets installed on the front sides of<br />

the chassis. The L brackets are secured to the chassis with eight M4 Phillips-head countersunk screws<br />

(four screws on each side) as shown in Figure 3-12.<br />

3-26<br />

<strong>Catalyst</strong> <strong>6500</strong> <strong>Series</strong> <strong>Switches</strong> <strong>Installation</strong> <strong>Guide</strong><br />

OL-5781-08

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!