14.11.2014 Views

Catalyst 6500 Series Switches Installation Guide - Ipland

Catalyst 6500 Series Switches Installation Guide - Ipland

Catalyst 6500 Series Switches Installation Guide - Ipland

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Installing a <strong>Catalyst</strong> 6504-E Switch Chassis<br />

Chapter 3<br />

Installing the Switch<br />

What is Next<br />

After installing the chassis in its location, continue with the installation process by following these<br />

procedures:<br />

• Connecting the chassis to system ground. See “Establishing the System Ground” section on<br />

page 3-52.<br />

• Installing and connecting the power supplies to source power. Go to Chapter 4 for information on<br />

how to install and cable power supplies.<br />

• Connecting the network interface cables to the supervisor engine and modules. This may involve<br />

installing transceivers before you attach the network interface cables. See “Attaching the Interface<br />

Cables” section on page 3-61.<br />

• Powering-up the chassis and verifying the installation. See “Verifying Switch Chassis <strong>Installation</strong>”<br />

section on page 3-84.<br />

Optional <strong>Installation</strong> Kits<br />

There are no optional installation kits available for the <strong>Catalyst</strong> 6504-E switch chassis.<br />

3-16<br />

<strong>Catalyst</strong> <strong>6500</strong> <strong>Series</strong> <strong>Switches</strong> <strong>Installation</strong> <strong>Guide</strong><br />

OL-5781-08

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!