Installing a <strong>Catalyst</strong> 6504-E Switch Chassis<br />

Chapter 3<br />

Installing the Switch<br />

Installing a <strong>Catalyst</strong> 6504-E Switch Chassis<br />

This section provides procedures for installing a <strong>Catalyst</strong> 6504-E switch chassis in a rack assembly and<br />

installing the optional cable guide assemblies.<br />

<strong>Installation</strong> Accessory Kit<br />

The <strong>Catalyst</strong> 6504-E switch chassis is designed to be installed in a standard 19-inch rack, either open or<br />

enclosed. The chassis is shipped with the 19-inch rack-mount L brackets factory installed on the<br />

left-front and right-front of the chassis. Included in the accessory kit are both 10-32 x 0.75-inch and<br />

12-24 x 0.75-inch screws that are used to secure the chassis in the rack.<br />

Note Depending on the manufacturer, the rack posts might be prethreaded to accept either 10-32 or 12-24<br />

screws. If the rack posts are not prethreaded, you must install 10-32 or 12-24 clip nuts or cage nuts to<br />

secure the rack-mount screws. The clip nuts or the cage nuts are not included as part of the accessory kit<br />

and must be obtained on your own.<br />

Also included in the accessory kit are two optional cable guides. The two cable guides are installed on<br />

the front left- and right-side of the chassis using the same sets of screws (10-32 or 12-24) that secure the<br />

chassis rack-mount L brackets to the rack posts.<br />

L Brackets on the <strong>Catalyst</strong> 6504-E Switch Chassis<br />

The <strong>Catalyst</strong> 6504-E switch chassis is shipped with the two L brackets installed on the front sides of the<br />

chassis. The L brackets are secured to the chassis with six M4 Phillips-head countersunk screws (three<br />

screws on each side) as shown in Figure 3-4.<br />

Note<br />

The <strong>Catalyst</strong> 6504-E chassis has a chassis shipping bracket installed across the module slots. The bracket<br />

has been removed in Figure 3-4 for clarity.<br />

Note<br />

The L brackets can also be reversed and installed on the rear of the chassis as an alternative method of<br />

installation.<br />

3-12<br />

<strong>Catalyst</strong> <strong>6500</strong> <strong>Series</strong> <strong>Switches</strong> <strong>Installation</strong> <strong>Guide</strong><br />

OL-5781-08