Catalyst 6500 Series Switches Installation Guide - Ipland

Catalyst 6500 Series Switches Installation Guide - Ipland Catalyst 6500 Series Switches Installation Guide - Ipland

ipland.com.ua
from ipland.com.ua More from this publisher
14.11.2014 Views

Site Preparation Checklist Chapter 2 Preparing for Installation 2-26 Catalyst 6500 Series Switches Installation Guide OL-5781-08

CHAPTER 3 Installing the Switch Note In this publication, the term Catalyst 6500 series refers only to the switch chassis listed in Chapter 1. The Catalyst 6000 series switches (Catalyst 6006 and Catalyst 6009 switches) are described in a separate publication, the Catalyst 6000 Series Switch Installation Guide. This chapter describes how to install a Catalyst 6500 series switch. The chapter is divided into sections that cover installing the different Catalyst 6500 series chassis. Pointers within the overall chassis installation procedures point to separate installation procedures that cover installing various components and assemblies. The process of installing the switch can be broken down into a series of tasks. These tasks are listed in Table 3-1. Table 3-1 Catalyst 6500 Series Switch Installation Process Task Unpacking the switch Installing the switch Connecting the chassis to system ground Installing and cabling the power supply or supplies Cabling the supervisor engine and modules to the network Powering up the chassis Description Remove the switch from the packaging materials. Note We recommend that you save the packaging material for use later if you need to move the chassis. All Catalyst 6500 series chassis can be rack-mounted. Some chassis offer the option of installation as a freestanding unit through the use of rubber feet or stabilizer brackets. Construct and attach a system ground wire from the building (earth) ground to the system ground point on the chassis. Normally, one power supply is shipped installed in the chassis. The second power supply, if part of the switch configuration, is shipped separately. You now install the second power supply and connect the power supplies to source power, either AC or DC. The various ports on the supervisor engine and on the modules that are installed in the chassis must be connected to the network. This process can involve only attaching a network interface cable to the module port, or it can include the installation of a transceiver of some type in the supervisor engine or module port, and then attaching the network interface cable to the transceiver. After completing the network cabling and making sure that system ground is connected, the power supplies can be turned on. The system powers up and runs through a set of built-in diagnostics. OL-5781-08 Catalyst 6500 Series Switches Installation Guide 3-1

CHAPTER<br />

3<br />

Installing the Switch<br />

Note In this publication, the term <strong>Catalyst</strong> <strong>6500</strong> series refers only to the switch chassis listed in Chapter 1.<br />

The <strong>Catalyst</strong> 6000 series switches (<strong>Catalyst</strong> 6006 and <strong>Catalyst</strong> 6009 switches) are described in a<br />

separate publication, the <strong>Catalyst</strong> 6000 <strong>Series</strong> Switch <strong>Installation</strong> <strong>Guide</strong>.<br />

This chapter describes how to install a <strong>Catalyst</strong> <strong>6500</strong> series switch. The chapter is divided into sections<br />

that cover installing the different <strong>Catalyst</strong> <strong>6500</strong> series chassis. Pointers within the overall chassis<br />

installation procedures point to separate installation procedures that cover installing various components<br />

and assemblies. The process of installing the switch can be broken down into a series of tasks. These<br />

tasks are listed in Table 3-1.<br />

Table 3-1 <strong>Catalyst</strong> <strong>6500</strong> <strong>Series</strong> Switch <strong>Installation</strong> Process<br />

Task<br />

Unpacking the switch<br />

Installing the switch<br />

Connecting the chassis to system<br />

ground<br />

Installing and cabling the power<br />

supply or supplies<br />

Cabling the supervisor engine<br />

and modules to the network<br />

Powering up the chassis<br />

Description<br />

Remove the switch from the packaging materials.<br />

Note We recommend that you save the packaging material for use<br />

later if you need to move the chassis.<br />

All <strong>Catalyst</strong> <strong>6500</strong> series chassis can be rack-mounted. Some chassis<br />

offer the option of installation as a freestanding unit through the use<br />

of rubber feet or stabilizer brackets.<br />

Construct and attach a system ground wire from the building (earth)<br />

ground to the system ground point on the chassis.<br />

Normally, one power supply is shipped installed in the chassis. The<br />

second power supply, if part of the switch configuration, is shipped<br />

separately. You now install the second power supply and connect the<br />

power supplies to source power, either AC or DC.<br />

The various ports on the supervisor engine and on the modules that<br />

are installed in the chassis must be connected to the network. This<br />

process can involve only attaching a network interface cable to the<br />

module port, or it can include the installation of a transceiver of<br />

some type in the supervisor engine or module port, and then<br />

attaching the network interface cable to the transceiver.<br />

After completing the network cabling and making sure that system<br />

ground is connected, the power supplies can be turned on. The<br />

system powers up and runs through a set of built-in diagnostics.<br />

OL-5781-08<br />

<strong>Catalyst</strong> <strong>6500</strong> <strong>Series</strong> <strong>Switches</strong> <strong>Installation</strong> <strong>Guide</strong><br />

3-1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!