14.11.2014 Views

Quarterly December 2011 - Odfjell

Quarterly December 2011 - Odfjell

Quarterly December 2011 - Odfjell

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

sions and use of fuel<br />

NR.04/ 11<br />

5<br />

Kværner hull at 16 knots design waterline<br />

Verified calculations<br />

Calculations were verified by model<br />

tests at Sintef Marintek in Trondheim in<br />

October and November 2010 for the Kværner<br />

and Poland B-588 ship series. On site installation<br />

at reference ship Bow Flora and Bow<br />

Sea was completed earlier this year.<br />

Results to date clearly indicate lower fuel<br />

consumption and more speed. The live tests<br />

will continue and are being monitored closely<br />

by the ship’s reporting system.<br />

The scope<br />

The scope of the contract covers all sizes of<br />

<strong>Odfjell</strong> vessels and defines a progress split in<br />

different stages:<br />

• Preparation of supplied information<br />

and data of the ship<br />

• Creation of a digital ship hull, propeller<br />

and Mewis Duct<br />

• CFD - analysis of the Mewis Duct<br />

(Computational Fluid Dynamics)<br />

• Manufacturing of the ship model<br />

and the Mewis Duct model<br />

• Model testing of the ship including<br />

Mewis Duct<br />

Extract of model test result report of the Mewis Duct performance<br />

V PB Fuel Consumption Emission<br />

[kn] [kW] [mt/24h] [mt/year] [mt/year]<br />

NOx CO 2<br />

Ship without<br />

Mewis Duct® 16,1 9.300 37,3 8.200 572 25.994<br />

Ship with<br />

Mewis Duct® 16,1 8.740 34,9 7.670 535 24.314<br />

Economies Cons. 6,0% 6,5% 6,5% ~6,0% ~6,5<br />

Emission calculation<br />

odfjell quarterly magazine

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!