McGraw, Maryann
McGraw, Maryann
McGraw, Maryann
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
estoration measures<br />
Restoring Wetlands and Training Restoration Specialists<br />
on Cedro Creek Project<br />
Cedro Creek Priority 1 Reaches Structure Assessment and Material Estimations<br />
Reach<br />
Reach<br />
Length<br />
Structure/Description<br />
Estimated Size<br />
in Feet<br />
Est. Volume<br />
Cubic Feet<br />
Filter Dam<br />
6 X 8 X 3<br />
144<br />
Mahogany<br />
1735 ft<br />
4 baffles<br />
4 weirs/ meander<br />
(with ~ 1.5 meanders)<br />
12 X 24 X 1.5 / 2<br />
16 X 16 X 1.5<br />
2592<br />
1536<br />
2 headcuts 2 log and<br />
fabric<br />
6 X 8 X 1<br />
48<br />
Mt. Lion<br />
1333 ft.<br />
wire or masonry<br />
structure trail crossing<br />
12 X 8 X 4<br />
768<br />
move bike trail up rll<br />
bank remove trees<br />
12 X 8 X 4<br />
384<br />
Develop specific wetland protection and restoration measures based<br />
on location, function and other attributes.