13.11.2014 Views

McGraw, Maryann

McGraw, Maryann

McGraw, Maryann

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

estoration measures<br />

Restoring Wetlands and Training Restoration Specialists<br />

on Cedro Creek Project<br />

Cedro Creek Priority 1 Reaches Structure Assessment and Material Estimations<br />

Reach<br />

Reach<br />

Length<br />

Structure/Description<br />

Estimated Size<br />

in Feet<br />

Est. Volume<br />

Cubic Feet<br />

Filter Dam<br />

6 X 8 X 3<br />

144<br />

Mahogany<br />

1735 ft<br />

4 baffles<br />

4 weirs/ meander<br />

(with ~ 1.5 meanders)<br />

12 X 24 X 1.5 / 2<br />

16 X 16 X 1.5<br />

2592<br />

1536<br />

2 headcuts ­2 log and<br />

fabric<br />

6 X 8 X 1<br />

48<br />

Mt. Lion<br />

1333 ft.<br />

wire or masonry<br />

structure trail crossing<br />

12 X 8 X 4<br />

768<br />

move bike trail up rll<br />

bank remove trees<br />

12 X 8 X 4<br />

384<br />

Develop specific wetland protection and restoration measures based<br />

on location, function and other attributes.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!