13.11.2014 Views

class - Regis College

class - Regis College

class - Regis College

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

&<br />

BEFORE<br />

AFTER<br />

Next fall, the <strong>Regis</strong> campus will begin<br />

MASTER PLAN to take on a new face. After much study<br />

and collaboration, the <strong>College</strong> has crafted<br />

WILL RESULT IN<br />

a master plan that envisions a more<br />

attractive, more technology-driven, more<br />

A DRAMATICALLY<br />

student-centered campus. Above all, more<br />

NEW CAMPUS<br />

<br />

<br />

campus core so at its heart is a grassy quad<br />

where now there is a parking lot. The larger goal is to create more comfortable<br />

and collaborative learning spaces and enhance opportunities for gathering,<br />

dialogue, and community.<br />

This new central campus quad will contain improved campus entrances,<br />

connective campus sidewalks and in future phases, will open up to a renovated<br />

library, an improved student center, and an enhanced residence hall.<br />

A loop road and satellite parking lot will be developed as part of the motor<br />

vehicle transportation plan.<br />

<br />

will set the stage both physically and philosophically for the next phases. It<br />

will be a harbinger of even bigger changes to come.<br />

Soon thereafter, the library will be renovated with a new entrance that<br />

is oriented so it faces the new central quad. The library will be adapted to<br />

maximize collaboration and to provide support for current technology and<br />

look ahead to the technology of the future. A contemporary learning commons<br />

<br />

for technology-aided research and study. Included in the plans are an outdoor<br />

study terrace opening onto the Great Lawn.<br />

The third phase will be an addition to Maria Hall. The suite-style accommo-<br />

-<br />

<br />

new wing will abut the newly developed central quad.<br />

The <strong>College</strong> engaged Sasaki Associates of Watertown, Mass., on the 10-year<br />

master plan process and is pleased that the Town of Weston Planning Board<br />

has approved the master plan. The transformation of campus will be funded<br />

<br />

campaign, now in the pre-planning stage.<br />

17<br />

SPRING 13

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!