Board of Regents Meeting<br />

August 5-6, 2010<br />

Item #26<br />

EXECUTIVE SUMMARY Page 1 of 9<br />

Item Name: <strong>Native</strong> <strong>American</strong> <strong>Cultural</strong> <strong>Center</strong> <strong>Project</strong> <strong>Implementation</strong> <strong>and</strong> <strong>Project</strong><br />

Approval (NAU)<br />

Action Item Discussion Item Information Item<br />

Issue: Northern Arizona University requests approval for the $7 million, 12,540<br />

square foot <strong>Native</strong> <strong>American</strong> <strong>Cultural</strong> <strong>Center</strong> project, which includes new<br />

construction, demolition, sitework <strong>and</strong> utility infrastructure extensions. The<br />

project will be funded with $3 million from donations <strong>and</strong> $4 million in general<br />

university funds. The university portion may be reduced if additional gift<br />

funding is received.<br />

Previous Board Actions: Amended FY 2009 Capital Development Plan January 2009<br />

FY 2010 Capital Development Plan June 2009<br />

Amended FY 2010 Capital Development Plan January 2010<br />

FY 2011 Capital Development Plan June 2010<br />

Statutory / Policy Requirements:<br />

<br />

Board Policy 7-102 requires Capital Committee review <strong>and</strong> Board approval of<br />

projects with a total project cost over $5 million.<br />

<strong>Project</strong> Justification /Strategic Implications:<br />

<br />

<br />

The project is 12,549 square feet of new construction for a cultural center<br />

incorporating unique cultural influences <strong>and</strong> sustainable design principles. The<br />

new facility will offer a network of student support services for native <strong>and</strong> nonnative<br />

students. The estimated cost is $7 million. Gifts will fund $3 million of the<br />

project.<br />

This project is consistent with the adopted NAU Master Plan, as well as the<br />

update in process, which promotes quality student activity environments that<br />

facilitate student integration into the social community of campus. Student<br />

retention <strong>and</strong> recruitment are inherently linked with the quality of academic,<br />

service <strong>and</strong> social facilities.<br />

<br />

In the university strategic plan, the university made a commitment to <strong>Native</strong><br />

<strong>American</strong>s to provide a university climate that enhances the academic<br />

experiences of <strong>Native</strong> <strong>American</strong> students <strong>and</strong> others. The proposed <strong>Native</strong><br />

<strong>American</strong> <strong>Cultural</strong> <strong>Center</strong> will provide academic <strong>and</strong> student support services that<br />

are a key component of meeting that goal. Additionally, the center will house<br />

Contact Information<br />

David Bousquet, Vice President, (928) 523.8449, David.Bousquet@nau.edu<br />

Jane Kuhn, Associate Vice President, (928) 523.7732, Jane.Kuhn@nau.edu


Board of Regents Meeting<br />

August 5-6, 2010<br />

Item #26<br />

EXECUTIVE SUMMARY Page 2 of 9<br />

activities that support student recruitment <strong>and</strong> retention, while providing a point of<br />

contact for students away from home. The Strategic Planning Council involved<br />

500 members of the university community <strong>and</strong> external partners in preparing the<br />

university Strategic Plan.<br />

<br />

<br />

<br />

Currently more than 1,300 <strong>Native</strong> <strong>American</strong> students representing 62 tribes from<br />

throughout the country are enrolled. The <strong>Native</strong> <strong>American</strong> <strong>Cultural</strong> <strong>Center</strong> will<br />

provide a visible presence <strong>and</strong> will enhance the university’s ability to attract,<br />

retain <strong>and</strong> graduate <strong>Native</strong> <strong>American</strong> students. The <strong>Center</strong>’s goals directly help<br />

achieve two of the seven goals stated in the University’s strategic plan, including<br />

Goal 6 “Foster a culture of diversity” <strong>and</strong> Goal 7 “Become the nation’s leading<br />

university serving <strong>Native</strong> <strong>American</strong>s.”<br />

The <strong>Center</strong> will also focus upon the significance of native cultures in the past,<br />

present, <strong>and</strong> future. Through the impact of its presence <strong>and</strong> programming, <strong>and</strong><br />

as a coordinating body for activities of interest to students, <strong>Native</strong> <strong>American</strong><br />

constituents, <strong>and</strong> the general community, the <strong>Native</strong> <strong>American</strong> <strong>Cultural</strong> <strong>Center</strong><br />

will underscore the vital role of cultural diversity <strong>and</strong> multi-cultural underst<strong>and</strong>ing<br />

on campus <strong>and</strong> in the region. The <strong>Center</strong> will promote a community of students,<br />

faculty, visiting scholars <strong>and</strong> tribal leaders.<br />

The building will be available to all student clubs <strong>and</strong> organizations, <strong>and</strong><br />

scheduling will be accessible to the NAU community. Additionally, it is planned<br />

the building will be available for community events.<br />

<strong>Project</strong> Description <strong>and</strong> Scope:<br />

<br />

<br />

<br />

The project includes offices, a kitchen, an outdoor patio <strong>and</strong> a central gathering<br />

hall for lectures, student presentations, award ceremonies, cultural dances <strong>and</strong><br />

other events such as student orientation. Additionally, a student lounge <strong>and</strong> a<br />

computer area are in close proximity to the student service staff <strong>and</strong> peer<br />

mentors. A multi-purpose room <strong>and</strong> a double conference room for academic<br />

programs, symposia, <strong>and</strong> meetings provide interactive space for collaborative<br />

projects. <strong>Native</strong> <strong>American</strong> art will be featured throughout the new center, as will<br />

student curated art exhibits. <strong>Native</strong> <strong>American</strong> Student Services will be housed in<br />

this facility in keeping with the commitment to provide cultural integration for our<br />

<strong>Native</strong> <strong>American</strong> population.<br />

Development of this project included extensive programming <strong>and</strong> community<br />

outreach efforts with a large cross section of user groups including campus <strong>and</strong><br />

the community at large. At the request of the donors, a <strong>Native</strong> <strong>American</strong> architect<br />

was included on the design team to help support the overall programming <strong>and</strong><br />

design, <strong>and</strong> provide interpretation of the <strong>Native</strong> <strong>American</strong> cultural sensitivities.<br />

The total project square footage of new construction is 12,549. The demolition of<br />

the counseling facility will remove 7,891 square feet from the university’s square


Board of Regents Meeting<br />

August 5-6, 2010<br />

Item #26<br />

EXECUTIVE SUMMARY Page 3 of 9<br />

footage. This will result in a net increase of 4,658 square feet in the university’s<br />

total. The parking lot adjoining the site will be removed to provide the outdoor<br />

spaces that are an integral part of this facility.<br />

<br />

<br />

<br />

<br />

The site change, facilitated by master planning discussions, focused on<br />

accessibility <strong>and</strong> visibility to all students <strong>and</strong> the community, as well as its<br />

congruence with the campus civic boundaries which include Cline Library, Ardrey<br />

Auditorium <strong>and</strong> the University Union. The new site will allow for better long term<br />

integration of the facility <strong>and</strong> its programs <strong>and</strong> outreach efforts with the<br />

community.<br />

Relocation preserves space for future development within the science <strong>and</strong> math<br />

academic core. The previous site has been identified as an ideal site for needed<br />

improvements <strong>and</strong> growth in the sciences/math complex. Over 60% of all<br />

incoming students are required to take a science/lab <strong>and</strong> math class. As<br />

enrollments continue to increase the need to address these programs is quickly<br />

becoming more critical. This site is the only available site on the north campus<br />

core available for an academic building of over 100,000 gsf.<br />

The new site also allows for the continued greening of campus, as well as<br />

removal of interior roadways <strong>and</strong> parking lots <strong>and</strong> continued improvements to the<br />

pedestrian spine.<br />

Site work required at the proposed location allows utility connections to be<br />

brought into current code compliance. New electrical service will come from a<br />

switch rather than the adjacent building; water service will have new connections<br />

as well. Connection points for steam <strong>and</strong> chilled water are in close proximity to<br />

the building site, but will require extensions from the North Plant.<br />

o Site costs will be spent by the University eventually, if not for the NACC<br />

then for the next project;<br />

o Demolition cost will be incurred for any building replacement;<br />

o Existing counseling building has a cost to keep open – building is<br />

unattractive <strong>and</strong> inefficient; <strong>and</strong>,<br />

o Utilities upgrades or extensions are needed for any new work.<br />

<br />

Additionally, geotechnical reports on the site indicated poor soil in a small portion<br />

of the site resulting in some redesign of the project’s foundation <strong>and</strong> the footings<br />

to ensure high quality, durable construction.<br />

Additional <strong>Project</strong> Considerations:<br />

<br />

This construction project has been designed in accordance with university<br />

Design Guidelines, <strong>and</strong> will be constructed of high quality, durable, maintainable<br />

materials <strong>and</strong> building systems to maximize energy efficiency <strong>and</strong> minimize<br />

operational, repair <strong>and</strong> replacement costs.


Board of Regents Meeting<br />

August 5-6, 2010<br />

Item #26<br />

EXECUTIVE SUMMARY Page 4 of 9<br />

<br />

<br />

In an effort to demonstrate the university’s commitment to responsible,<br />

sustainable design <strong>and</strong> in response to the Governor’s m<strong>and</strong>ate that facilities be<br />

designed in a sustainable manner, this project will incorporate sustainable<br />

materials <strong>and</strong> practices wherever possible. As a reflection of the NAU goal, this<br />

project is intended to receive a United States Green Building Council (USGBC)<br />

Leadership in Energy <strong>and</strong> Environmental Design (LEED) Silver Certification.<br />

There is no backfill plan associated with this project. The Counseling programs<br />

are being permanently relocated, in August 2011, into the new Health <strong>and</strong><br />

Learning <strong>Center</strong> project currently under construction. Counseling staff will be<br />

temporarily relocated to allow demolition of Counseling <strong>and</strong> until construction is<br />

completed on Health <strong>and</strong> Learning. The space in the University Union currently<br />

occupied by <strong>Native</strong> <strong>American</strong> Support Services (NASS) will be available for<br />

expansion of other student service programs that currently share space with<br />

NASS.<br />

<strong>Project</strong> Delivery Method <strong>and</strong> Process:<br />

<br />

<br />

This project is being delivered through the Construction Manager at Risk (CMAR)<br />

method. This approach was selected because it can save time through fast-track<br />

project scheduling, it provides contractor design input <strong>and</strong> coordination throughout<br />

the project, it improves potentially adversarial project environments, <strong>and</strong> it allows<br />

for the selection of the most qualified contractor team for each individual<br />

component of the project. With the use of two independent estimates at each<br />

phase, <strong>and</strong> low bid subcontractor work for the actual construction, this method also<br />

provides a high level of cost <strong>and</strong> quality control.<br />

The CMAR was selected through the capital project selection committee process<br />

prescribed by the ABOR Procurement Code. The university received twenty (20)<br />

responses to the project RFQ <strong>and</strong> four (4) of the responding teams were shortlisted<br />

for interview. A licensed contractor from the community was included on<br />

the selection committee as required by ABOR policy, as was an architect.<br />

The design team was selected through a similar ABOR process, <strong>and</strong> five (5)<br />

teams were interviewed out of the twenty-nine (29) RFQ responses received.<br />

<br />

<strong>Project</strong> Management: The primary members of the project staffing plan include<br />

one (1) senior Facilities, Design <strong>and</strong> Construction member from the University of<br />

Arizona, the NAU Manager of Planning <strong>and</strong> Design, the NAU Manager of<br />

Construction, <strong>and</strong> a NAU project manager.


Board of Regents Meeting<br />

August 5-6, 2010<br />

Item #26<br />

EXECUTIVE SUMMARY Page 5 of 9<br />

<strong>Project</strong> Costs:<br />

<br />

<br />

The total project budget for the <strong>Native</strong> <strong>American</strong> <strong>Cultural</strong> <strong>Center</strong> is $7 million.<br />

The project budget includes new construction, demolition of the existing<br />

counseling building, site development, utility extensions <strong>and</strong> code upgrades,<br />

l<strong>and</strong>scaping <strong>and</strong> circulation connections between new <strong>and</strong> existing buildings,<br />

equipment, furnishings, <strong>and</strong> all required indirect costs.<br />

The initial project budget was developed at the Capital Development Plan (CDP)<br />

phase in consideration of comparable costs from other ABOR projects, gifted<br />

funds, <strong>and</strong> the strategic goals of the university.<br />

<br />

Relevant comparable projects are listed below <strong>and</strong> include:<br />

<strong>Project</strong> Gross<br />

Square Feet<br />

Construction<br />

Cost/sf<br />

Comparable <strong>Project</strong><br />

Location<br />

Heard Museum North Scottsdale 9,600 $230.00<br />

Museum of NA Collection Ctr Flagstaff 17,283 $318.00<br />

UA Poetry Building Tucson 17,650 $353.56<br />

Portl<strong>and</strong> State University Ctr Portl<strong>and</strong>, OR 12,500 $648.48<br />

Huhugam Heritage <strong>Center</strong>* Gila River Reservation 51,000 $304.64<br />

Average Comparable <strong>Project</strong> 36,011 $370.94<br />

Note*: Various donations from local tribe tradesmen, including earthwork, were part of this<br />

project.<br />

<br />

<br />

Considering these relevant comparable construction costs, the <strong>Native</strong> <strong>American</strong><br />

<strong>Cultural</strong> <strong>Center</strong> project construction budget cost of $382 per square foot is within<br />

an appropriate range.<br />

The CMAR is at risk to provide the completed project within the agreed upon<br />

GMP price.<br />

Fiscal Impact <strong>and</strong> Financing Plan:<br />

<br />

<br />

<br />

This project will be funded through gifts of $3 million <strong>and</strong> $4 million in general<br />

university funds. The university portion may be reduced if additional gift funding<br />

is received.<br />

Operations <strong>and</strong> maintenance costs are projected to moderately rise due to new<br />

square footage <strong>and</strong> potential increases in utility rates. The rise was offset by<br />

approximately 50% due to demolition of Counseling square footage <strong>and</strong> its<br />

replacement with sustainable, energy efficient systems <strong>and</strong> new construction.<br />

Debt Ratio Impact: There are no bond funds or other form of debt required for<br />

this project.


Board of Regents Meeting<br />

August 5-6, 2010<br />

Item #26<br />

EXECUTIVE SUMMARY Page 6 of 9<br />

<strong>Project</strong> Status <strong>and</strong> Schedule:<br />

<br />

<br />

Construction documents for the project are nearing completion. The GMP is<br />

based upon 100% bids from subcontractors for the original scope. New bids for<br />

new site work related to relocation <strong>and</strong> foundation redesign are currently being<br />

evaluated. All bids are within the approved project budget.<br />

General construction is scheduled to begin in September 2010. Construction is<br />

scheduled to be complete in October 2011.<br />

Committee Review <strong>and</strong> Recommendation:<br />

The Capital <strong>and</strong> <strong>Project</strong> Finance Committee reviewed this item at its July 15,<br />

2010 meeting <strong>and</strong> recommended forwarding for Board approval.<br />

<br />

The Committee had a discussion on the potential to model the cultural center<br />

similar to other university cultural centers that serve as regional <strong>and</strong> national<br />

attractions.<br />

Recommendation to the Board<br />

It is recommended the Board grant combined <strong>Project</strong> <strong>Implementation</strong> Approval <strong>and</strong><br />

<strong>Project</strong> Approval for the NAU <strong>Native</strong> <strong>American</strong> <strong>Cultural</strong> <strong>Center</strong> project, as presented in<br />

this Executive Summary.


Board of Regents Meeting<br />

August 5-6, 2010<br />

Item #26<br />

EXECUTIVE SUMMARY Page 7 of 9<br />

Capital <strong>Project</strong> Information Summary<br />

University: Northern Arizona University<br />

<strong>Project</strong> Name: <strong>Native</strong> <strong>American</strong><br />

<strong>Cultural</strong> <strong>Center</strong><br />

<strong>Project</strong> Description <strong>and</strong> Location:<br />

A new 12,549 square foot <strong>Native</strong> <strong>American</strong> <strong>Cultural</strong> <strong>Center</strong> located on north campus<br />

between the University Union <strong>and</strong> Cline Library along Knoles Drive.<br />

<strong>Project</strong> Schedule:<br />

Planning Spring 2009<br />

Design Fall 2009<br />

Construction September 2010<br />

Occupancy October 2011<br />

<strong>Project</strong> Budget:<br />

Facility Useful Life<br />

50-75 years (approximately)<br />

Total <strong>Project</strong> Cost $ 7,000,000<br />

Total <strong>Project</strong> Cost per GSF $ 558<br />

Direct Construction Cost $ 4,824,907<br />

Construction Cost per GSF $ 382<br />

Change in Annual<br />

Operating/Maintenance Costs:<br />

Utilities – New Square Footage $ 23,181<br />

Personnel $ 60,000<br />

All Other Operating $ 25,000<br />

Subtotal $ 108,181<br />

Funding Sources:<br />

Capital:<br />

A. Gifts $ 3,000,000<br />

B. System Revenue Bonds $<br />

C. Local Funds $ 4,000,000<br />

Subtotal $ 7,000,000<br />

Operation/Maintenance<br />

A. Funding Source: General University Funds


Board of Regents Meeting<br />

August 5-6, 2010<br />

Item #26<br />

EXECUTIVE SUMMARY Page 8 of 9<br />

Capital <strong>Project</strong> Cost Estimate<br />

University: Northern Arizona University<br />

<strong>Project</strong>:<br />

<strong>Native</strong> <strong>American</strong> <strong>Cultural</strong> <strong>Center</strong><br />

Capital<br />

<strong>Project</strong><br />

Development <strong>Implementation</strong> <strong>Project</strong><br />

Plan Approval Approval<br />

Capital Costs<br />

1. L<strong>and</strong> Acquisition $ - $ - $<br />

-<br />

2. Construction Cost - - -<br />

A. New Construction 4,794,907 4,794,907<br />

B. Renovation - -<br />

C. Fixed Equipment (Owner Furnished) - - -<br />

D. Site Development (excl. 2.E.) - - -<br />

E. Parking <strong>and</strong> L<strong>and</strong>scaping - - -<br />

F. Utilities Extensions - - -<br />

G. Other (Asbestos) - 30,000 30,000<br />

G. Inflation <strong>and</strong> Market Adjustment (0.0%) - - -<br />

Subtotal Construction Cost $ - $ 4,824,907 $ 4,824,907<br />

3. Fees<br />

A. Construction Mgr (3%) $ - $ 152,000 $ 152,000<br />

B. Architect/Engineer (15%) - 729,585 729,585<br />

C. Other (2%) - 116,885 116,885<br />

Subtotal Consultant Fees $ - $ 998,470 $ 998,470<br />

4. FF&E Movable $ - $ 316,000 $ 316,000<br />

5. Contingency, Design Phase (0.0%) - - -<br />

6. Contingency, Construction Phase (8%) - 386,458 386,458<br />

7. Parking Reserve - 5,000 5,000<br />

8. Telecommunications Equipment - 35,000 35,000<br />

Subtotal Items 4-8 $ - $ 742,458 $ 742,458<br />

9. Additional University Costs<br />

A. Surveys, Tests, Inspections, etc. $ - $ 162,452 $ 162,452<br />

B. Move-in Costs - 12,000 12,000<br />

C. Printing Advertisement - 1,600 1,600<br />

D. 3rd Party Estimate, UA Review, Audit - 62,000 62,000<br />

E. <strong>Project</strong> Management Cost (2.5%) 175,000 175,000<br />

F. State Risk Mgmt Insurance (.0034%) - 21,113 21,113<br />

Subtotal Additional University Costs $ - $ 434,165 $ 434,165<br />

TOTAL CAPITAL COST $ 6,000,000 $ 7,000,000 $ 7,000,000


Runke Circle<br />

Knoles Dr.<br />

S. San Francisco St.<br />

Board of Regents Meeting<br />

August 5-6, 2010<br />

Item #26<br />

EXECUTIVE SUMMARY Page 9 of 9<br />

<strong>Project</strong> Site Location Map:<br />

<strong>Native</strong> <strong>American</strong> <strong>Cultural</strong> <strong>Center</strong><br />

Butler Ave.<br />

Blome<br />

Bldg<br />

Dupont Dr.<br />

Milton Road<br />

Gammage<br />

Building<br />

Frier<br />

Hall<br />

Roseberry<br />

Apt<br />

Knoles Dr.<br />

North<br />

Union<br />

North<br />

Hall<br />

McMullen Circle<br />

Old Main<br />

Ashurst<br />

Bury Hall<br />

Taylor Hall<br />

Wettaw<br />

Building<br />

Duplicating<br />

Services<br />

Chemistry<br />

Building<br />

Centennial<br />

Building<br />

Beaver St.<br />

Riles<br />

Bldg<br />

Anthropology<br />

Annex<br />

Tormey Ave.<br />

LAB<br />

Facility<br />

Phy<br />

Science<br />

Biology<br />

Building<br />

Eastburn<br />

Education<br />

<strong>Center</strong><br />

Communication<br />

Building<br />

Osborne Dr.<br />

Plateau<br />

<strong>Center</strong><br />

Liberal<br />

Arts<br />

Franklin Ave.<br />

Riordan Ranch Rd.<br />

Institute for<br />

Human<br />

Development<br />

Counseling<br />

<strong>and</strong> Testing<br />

<strong>Center</strong><br />

Adel<br />

Math<br />

Babbitt<br />

Academic<br />

<strong>Center</strong><br />

Peterson<br />

Hall<br />

Wall Aquatic<br />

<strong>Center</strong><br />

Lumberjack<br />

Stadium<br />

S. San Francisco St.<br />

Cline<br />

Library<br />

Mt. View Hall<br />

University Union<br />

Performing <strong>and</strong><br />

Fine Arts<br />

Gillenwater<br />

Hall<br />

HRM<br />

Recreation<br />

<strong>Center</strong><br />

Riordan Rd.<br />

Ardrey<br />

Auditorium<br />

Cowden<br />

Learning<br />

Community<br />

Raymond Hall<br />

McDonald Hall<br />

Bookstore<br />

Fronski<br />

Health<br />

<strong>Center</strong><br />

Mt.View Dr.<br />

PARKING<br />

STRUCTURE<br />

Information<br />

Systems<br />

Tinsley<br />

Hall<br />

Blome Dr. South<br />

Gateway<br />

<strong>Center</strong><br />

Sechrist Hall<br />

Hall<br />

north<br />

0 100' 200'<br />

SCALE<br />

300'<br />

Allen<br />

Hall<br />

University Drive<br />

NEW CONSTRUCTION<br />

Wilson Hall<br />

ACADEMIC BUILDINGS<br />

ARD<br />

Reilly<br />

Hall<br />

RESIDENCE HALLS<br />

University Drive<br />

Campus<br />

Heights<br />

Anthropology<br />

Lab<br />

ROTC/Property<br />

Control<br />

SUPPORT FACILITIES<br />

Runke Dr.<br />

McConnell Drive<br />

Gabaldon<br />

Hall<br />

Knoles Drive<br />

73<br />

Babbitt<br />

Academic<br />

<strong>Center</strong><br />

Pine Ridge<br />

Village Apts<br />

Learning<br />

oll Dr.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!