13.11.2014 Views

Resilience - University of Miami School of Architecture

Resilience - University of Miami School of Architecture

Resilience - University of Miami School of Architecture

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

proposed redevelopment sequence<br />

The redevelopment sequence illustrated below reflects current <strong>University</strong> redevelopment plans. The seawater lab is scheduled to begin<br />

construcon in 2011, with demolion <strong>of</strong> Collier and Glassell to follow. Grosvenor and the Trium Lab are considered obsolete due to<br />

restricted floor plans, dated infrastructure, and vulnerability to storm events. This leaves a large area at the center <strong>of</strong> Campus open for<br />

consideraon. This will be the primary target area for intervenons proposed here.<br />

proposed seawater lab scheduled for demolion obsolete - future demolion primary area available for future redevelopment

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!