30. TOT 1A<br />

Revised December 2012<br />

Accepted <strong>Rating</strong><br />

Existing <strong>Rating</strong><br />

Other<br />

Location:<br />

Definition:<br />

Transfer Limit:<br />

Extreme Northwest Colorado<br />

Sum of the flows on the following transmission lines:<br />

Line<br />

Metered End<br />

Bears Ears-Bonanza 345 kV Bears Ears<br />

Hayden-Artesia 138 kV<br />

Hayden<br />

Meeker-Rangely 138 kV<br />

Rangely<br />

East to West: 650 MW (maximum)<br />

West to East: Not defined<br />

Critical<br />

Disturbance<br />

that limits the<br />

transfer<br />

capability:<br />

When:<br />

System<br />

Conditions:<br />

Outage of the Bears Ears-Bonanza 345 kV line. The limiting element<br />

can be the emergency overload on the Hayden-Artesia 138 kV line, or<br />

the Meeker-Rangely 138 kV line (see attachment).<br />

<strong>Rating</strong> established in March 1990 with the publication of “Bears Ears-<br />

Bonanza 345 kV Line Operating Study Report.”<br />

The operating study was conducted jointly by:<br />

<strong>Western</strong> Area Power Administration - Salt Lake, Golden, Montrose<br />

Tri-State Generation & Transmission Association, Inc. (TSGT)<br />

Utah Associated Municipal Power System<br />

Platte River Power Authority<br />

Deseret Generation and Transmission Co-operative<br />

Salt River Project<br />

Utah Power & Light Co. (now PacifiCorp)<br />

Colorado-Ute Electric Association (now TSGT and Public Service<br />

Company of Colorado)<br />

This rating is independent of transfer levels between major areas of<br />

WECC, although the actual flow is heavily impacted by east to west<br />

inadvertent. The transfer limit is impacted by local area generation and<br />

load levels. Historically, the flows have been predominantly east to<br />

west across the path.<br />

PART VI Item 1-85