Revised February 2007<br />

26. Northern - Southern California<br />

Accepted <strong>Rating</strong><br />

Existing <strong>Rating</strong><br />

Other<br />

Location:<br />

Definition:<br />

Between PG&E and Southern California Edison<br />

Midway-Vincent #1 500kV line metered at Midway<br />

Midway-Vincent #2 500kV line metered at Midway<br />

Midway-Whirlwind 500kV line metered at Midway<br />

Transfer Limit: North to South: 4000MW (Other <strong>Rating</strong>) 1<br />

South to North:<br />

3000 MW<br />

Transfer limits are affected by generation and load levels between <strong>Path</strong> 15<br />

and Midway. North to south seasonal limits can vary from 900 to 4000 MW<br />

and south to north from 1400 to 2400 MW.<br />

Critical<br />

Disturbance<br />

that limits the<br />

transfer<br />

capability:<br />

Midway-Vincent #1 and #2 500 kV double-line outage, or Midway-Vincent<br />

#1 and Midway-Whirlwind 500kV double-line outage can overload the<br />

remaining <strong>Path</strong> 26 500 kV line and/or cause voltage criteria violation.<br />

When: North to south rating of 4000 MW was approved by WECC on May 5, 2006.<br />

The existing <strong>Path</strong> 26 RAS was upgraded and released for operation on June<br />

19, 2006 to support the north to south rating. (SCE and PG&E are currently<br />

in the process of initiating a redefinition of the path and reestablishing the<br />

existing path rating with the approved modification of the existing RAS, as<br />

discussed above.)<br />

South to north rating of 3,000 MW was approved by WECC on September<br />

26, 2011. There is no existing <strong>Path</strong> 26 RAS for south-to-north transfer at<br />

3,000 MW.<br />

System<br />

Conditions:<br />

Study Criteria:<br />

Remedial<br />

Actions<br />

Required:<br />

Formal<br />

Operating<br />

Procedure:<br />

North to south transfer was based on heavy summer and light spring<br />

conditions.<br />

South to north transfer was based on light winter conditions.<br />

All facilities loaded within normal ratings under normal system conditions.<br />

All facilities loaded within emergency ratings under outage conditions.<br />

The system meets the post transient voltage criteria.<br />

Fully meets NERC/WECC Planning Standards.<br />

Based on the nomogram curve designed for north to south flow between 3000<br />

and 3550 MW, the <strong>Path</strong> 26 RAS would trip up to 1400 MW of Midway area<br />

generation for loss of any two of the South of Midway 500 kV lines<br />

(Midway-Vincent #1, Midway-Vincent #2, and Midway-Whirlwind). For<br />

north to south flow between 3550 and 4000 MW, the <strong>Path</strong> 26 RAS would trip<br />

1400 MW of Midway generation and up to 600 MW load at SCE’s Rio<br />

Honda and/or Walnut Substations for the same 500 kV double-line outage.<br />

California ISO T-103, T-118A, T-120 and T-122.<br />

1 The rating of 4000 MW included Midway –Vincent #3, which has been replaced. This new path definition is going through the Three-<br />