Path Rating Catalog 2013 - Western Electricity Coordinating Council
Path Rating Catalog 2013 - Western Electricity Coordinating Council Path Rating Catalog 2013 - Western Electricity Coordinating Council
25. PacifiCorp/PG&E 115 kV Interconnection Revised January 2013 Accepted Rating Existing Rating Other Location: Southern Oregon/Northern California (Line 14) Definition: Sum of flow on Line 14, measured at Cascade. Transfer Limit: Winter Summer North to South: 100 MW * 80 MW South to North: 45 MW ** 45 MW ** The thermal rating of this 115 kV line is 100/149 MVA Summer/Winter (397.5 ACSR conductor). Critical Disturbance that limits the transfer capability: When: System Conditions: Study Criteria * Due to load growth in the area, there are periods when the winter transfer limit may be reduced below 100 MW, sometimes as low as 80 MW. ** The south to north non-simultaneous rating listed in the WECC Transfer Capability Diagram is 45 MW. This capability is rated under tie-line open south of phase shifter and is equivalent to the magnitude of PacifiCorp’s local area load. Path rating was established on April 19, 1984 with the publishing of the WECC progress report, by project owners. The powerflow and stability studies deriving the path rating, above, were conducted by PacifiCorp and PG&E. This interconnection operates in parallel with the California-Oregon Intertie (COI). In order to direct flow of the 100 MW south on Line 14, a 75/100/125 MVA, 118 kV 0-60 degrees compensated phase shifter is installed at PacifiCorp’s Weed Junction substation, Weed Junction, California. This phase-shifting transformer regulates the flow of power, preventing power scheduled over it from flowing on the COI. The following stability simulations were made: A. Islanding Without the Line 14, 115 kV Tie This simulation assumes 3200 MW on the COI as well as 4163 MW on the Arizona to southern California path and indicates that minimum standards for stable operation can be achieved, complying with WECC criteria. Stability plot of the Devers 500 kV bus shows oscillations of increasing amplitude through the first 7-8 seconds, with decreasing amplitude thereafter. The minimum transient swing voltage was at the Devers 230 kV bus with 81.7%. Use of the SDG&E’s Damping Coefficient Method demonstrates a 7.6% damping on this bus. Frequencies drop to 58.84 Hz minimum in California causing some under-frequency load shedding. PART VI Item 1-70
Study Criteria (continued) Remedial Actions Required: Formal Operating Procedure: Allocation: Interaction w/Other Transfer Paths: Contact Person: B. Islanding With the PAC-PG&E 115 kV Tie This simulation assumes the addition of 100 MW on the existing Line 14, 115 kV Tie. This increase indicates that the minimum transient swing voltage at Devers would drop from 81.7% to 79.5% or a 2.2% reduction. In addition to standard protection, a thermal relay is installed at Cascade and out-of-step indication is installed at Weed Junction. In the event of islanding, Line 14 is tied into the relaying and communication of the WECC “islanding” scheme. It is to be tripped approximately six cycles after the 3-line loss of the COI. PacifiCorp is the operating agent and uses real-time flows to monitor this path. The entire path transfer capability is owned by PacifiCorp. No interaction with other WECC paths. However, transfer capability could be limited at times due to local loads. Larry Frick PacifiCorp, Transmission Planning Lloyd Center Room 1800 825 NE Multnomah Portland, OR 97232 (503) 813-6236 (503) 813-6508 - fax Larry.Frick@PacifiCorp.com Kang-Ling Ching Pacific Gas and Electric Company Mail Code B15A PO Box 770000 San Francisco, CA 94177-0001 (415) 973-7637 (415) 973-8804 – fax Email: kxc5@pge.com PART VI Item 1-71
- Page 29 and 30: 6. West of Hatwai Revised December
- Page 31 and 32: 7. Deleted February 1998 INTENTIONA
- Page 33 and 34: 8. Montana to Northwest Revised Jan
- Page 35 and 36: 9. West of Broadview Revised Januar
- Page 37 and 38: 10. West of Colstrip Revised Januar
- Page 39 and 40: Revised January 2013 Interaction w/
- Page 41 and 42: 11. West of Crossover Revised Janua
- Page 43 and 44: 12. Deleted February 2002 INTENTION
- Page 45 and 46: 14. Idaho to Northwest Revised Janu
- Page 47 and 48: Revised January 2013 System Conditi
- Page 49 and 50: 15. Midway - Los Banos Revised Febr
- Page 51 and 52: Revised January 2011 Contact Person
- Page 53 and 54: 16. Idaho - Sierra Revised December
- Page 55 and 56: 17. Borah West Revised January 2013
- Page 57 and 58: Revised January 2010 Interaction w/
- Page 59 and 60: 18. Montana - Idaho Revised January
- Page 61 and 62: 19. Bridger West Revised January 20
- Page 63 and 64: Remedial Actions Required: Formal O
- Page 65 and 66: 20. Path C Revised January 2013 PAR
- Page 67 and 68: Revised January 2013 Interaction w/
- Page 69 and 70: Revised February 2005 22. Southwest
- Page 71 and 72: Revised December 2010 Allocation: I
- Page 73 and 74: Revised February 2003 23. Four Corn
- Page 75 and 76: Contact Person: Barrie Kokanos, PhD
- Page 77 and 78: 24. PG&E - Sierra Revised February
- Page 79: 25. PacifiCorp/PG&E 115 kV Intercon
- Page 83 and 84: Revised February 2007 26. Northern
- Page 85 and 86: Revised February 2003 27. Intermoun
- Page 87 and 88: System Conditions: The Accepted Rat
- Page 89 and 90: Revised January 2013 28. Intermount
- Page 91 and 92: Revised February 2003 29. Intermoun
- Page 93 and 94: Revised November 2007 Contact Perso
- Page 95 and 96: 30. TOT 1A Revised December 2012 Ac
- Page 97 and 98: 31. TOT 2A Revised January 2013 PAR
- Page 99 and 100: Revised January 2013 Remedial Actio
- Page 101 and 102: Revised February 2005 32. Pavant -
- Page 103 and 104: 33. Bonanza West Revised December 2
- Page 105 and 106: 34. SEE PATHS 78 AND 79 PART VI Ite
- Page 107 and 108: Revised January 2013 35. TOT 2C (Pa
- Page 109 and 110: 36. TOT 3 Revised January 2013 Acce
- Page 111 and 112: Created on 8/10/10 TABLE 1-1A: TOT3
- Page 113 and 114: 37. TOT 4A Revised January 2012 Acc
- Page 115 and 116: PART VI Item 1-105
- Page 117 and 118: 38. TOT 4B Revised January 2012 Acc
- Page 119 and 120: WYOMING SYSTEM OPERATING CURVE SYST
- Page 121 and 122: 39. TOT 5 Revised January 2013 Acce
- Page 123 and 124: 40. TOT 7 Revised February 2003 PAR
- Page 125 and 126: Revised January 2006 Allocation: In
- Page 127 and 128: 41. Sylmar to SCE Revised February
- Page 129 and 130: 42. IID - SCE Revised February 2004
Study Criteria<br />
(continued)<br />
Remedial<br />
Actions<br />
Required:<br />
Formal<br />
Operating<br />
Procedure:<br />
Allocation:<br />
Interaction<br />
w/Other<br />
Transfer <strong>Path</strong>s:<br />
Contact Person:<br />
B. Islanding With the PAC-PG&E 115 kV Tie<br />
This simulation assumes the addition of 100 MW on the existing Line 14,<br />
115 kV Tie. This increase indicates that the minimum transient swing<br />
voltage at Devers would drop from 81.7% to 79.5% or a 2.2% reduction.<br />
In addition to standard protection, a thermal relay is installed at Cascade and<br />
out-of-step indication is installed at Weed Junction.<br />
In the event of islanding, Line 14 is tied into the relaying and communication<br />
of the WECC “islanding” scheme. It is to be tripped approximately six cycles<br />
after the 3-line loss of the COI.<br />
PacifiCorp is the operating agent and uses real-time flows to monitor this<br />
path.<br />
The entire path transfer capability is owned by PacifiCorp.<br />
No interaction with other WECC paths. However, transfer capability could<br />
be limited at times due to local loads.<br />
Larry Frick<br />
PacifiCorp, Transmission Planning<br />
Lloyd Center Room 1800<br />
825 NE Multnomah<br />
Portland, OR 97232<br />
(503) 813-6236<br />
(503) 813-6508 - fax<br />
Larry.Frick@PacifiCorp.com<br />
Kang-Ling Ching<br />
Pacific Gas and Electric Company<br />
Mail Code B15A<br />
PO Box 770000<br />
San Francisco, CA 94177-0001<br />
(415) 973-7637<br />
(415) 973-8804 – fax<br />
Email: kxc5@pge.com<br />
PART VI Item 1-71