Path Rating Catalog 2013 - Western Electricity Coordinating Council

Path Rating Catalog 2013 - Western Electricity Coordinating Council Path Rating Catalog 2013 - Western Electricity Coordinating Council

12.11.2014 Views

TABLE OF CONTENTS Existing Paths Page EXISTING PATHS 1 WECC Transfer Paths 1 1. Alberta - British Columbia 3 2. Alberta - Saskatchewan 6 3. Northwest – British Columbia 8 4. West of Cascades - North 12 5. West of Cascades - South 15 6. West of Hatwai 18 7. 21 8. Montana to Northwest 22 9. West of Broadview 25 10. West of Colstrip 27 11. West of Crossover 30 12. 33 13. 34 14. Idaho to Northwest 35 15. Midway - Los Banos 39 16. Idaho - Sierra 42 17. Borah West 45 18. Montana - Idaho 48 19. Bridger West 51 20. Path C 55 21. 58 22. Southwest of Four Corners 59 23. Four Corners 345/500 Qualified 63 24. PG&E - Sierra 66 25. PacifiCorp/PG&E 69 26. Northern - Southern California 72 27. Intermountain Power Project 75 28. Intermountain - Mona 345 kV 78 29. Intermountain - Gonder 230 kV 81 30. TOT 1A 84 31. TOT 2A 87 32. Pavant - Gonder 230 kV Intermountain - Gonder 230 kV 90 32. Pavant - Gonder 230 kV Intermountain - Gonder 230 kV 91 33. Bonanza West 92 34. 95 35. TOT 2C 96 36. TOT 3 98 37. TOT 4A 102 38. TOT 4B 106 39. TOT 5 110 40. TOT 7 113 PART VI 41. Sylmar to SCE 116 42. IID - SCE 118 43. North of San Onofre 120 44. South of San Onofre 122 45. SDG&E - CFE 124 46. West of Colorado River (WOR) 127 47. Southern New Mexico (NM1) 130 48. Northern New Mexico (NM2) 133 49. East of the Colorado River (EOR) 136 50. Cholla - Pinnacle Peak 140 51. Southern Navajo 143 52. Silver Peak - Control 55 kV 147 53. 149 54. Coronado-Silver King 500 kV 150 55. Brownlee East 152 56. 155 57. 156 58. Eldorado - Mead 230 kV Lines 157 59. WALC Blythe 161 kV Substation - SCE Blythe 161 kV Substation 159 60. Inyo - Control 115 kV Tie 161 61. Lugo - Victorville 500 kV Line 163 62. Eldorado - McCullough 500 kV Line 165 63. 167 64. 168 65. Pacific DC Intertie (PDCI) 169 66. COI 173 67. 176 68. 177 69. 178 70. 179 71. South of Allston 180 72. 183 73. North of John Day 184 74. 187 75. Hemingway – Summer Lake 188 76. Alturas Project 191 77. Crystal - Harry Allen 194 78. TOT 2B1 196 79. TOT 2B2 198 80. Montana Southeast 200 81. Centennial 202 82. TotBeast 205 Phase III Projects 208 III-1. Devers-Palo Verde #2 209 Item 1- vi

III-2. Palo Verde-Devers #2/ 212 III-3. Montana Alberta Tie Line 215 III-4. Path C (Post Gateway) 219 III-5. Aeolus South 222 III-6. Aeolus West Path (Post Gateway) 224 III-7. Bridger/Anticline West Path (Post Gateway) 226 III-8. TOT 2C 228 III-9. TOT 4A (Pre-Gateway) 229 III-10. TOT 4A (Post-Gateway) 232 III-11. TOT 4B (Pre-Gateway) 235 III–12. SunZia Southwest Transmission Project 239 III-13. Midpoint West Upgrade (Gateway West) 242 III-14. Borah West Upgrade (Gateway West)244 III-15. TotBeast with Hemingway-Boardman 500 kV 246 III-16. Idaho to Northwest with Hemingway- Boardman 500 kV 249 III-17. TOT3 Archer Interconnection Project253 III–18. Mountain States Transmission Intertie256 Phase II Projects 257 II–1. Navajo Transmission Project 258 II-2. Wyoming-Colorado Intertie (WCI) Project 260 II-3. TransWest Express Project (TWE) 261 II-4. Walla Walla – Mc Nary 262 II-5. Path 45 Uprate Project 263 II-6. Southwest Intertie Project - South 266 II-7. Path 3 S-N Rerating (Thermal Upgrade) Project 268 II-8. IID - SCE 270 II-9. IID - SCE 272 PART VI Item 1- ii

TABLE OF CONTENTS<br />

Existing <strong>Path</strong>s<br />

Page<br />

EXISTING PATHS 1<br />

WECC Transfer <strong>Path</strong>s 1<br />

1. Alberta - British Columbia 3<br />

2. Alberta - Saskatchewan 6<br />

3. Northwest – British Columbia 8<br />

4. West of Cascades - North 12<br />

5. West of Cascades - South 15<br />

6. West of Hatwai 18<br />

7. 21<br />

8. Montana to Northwest 22<br />

9. West of Broadview 25<br />

10. West of Colstrip 27<br />

11. West of Crossover 30<br />

12. 33<br />

13. 34<br />

14. Idaho to Northwest 35<br />

15. Midway - Los Banos 39<br />

16. Idaho - Sierra 42<br />

17. Borah West 45<br />

18. Montana - Idaho 48<br />

19. Bridger West 51<br />

20. <strong>Path</strong> C 55<br />

21. 58<br />

22. Southwest of Four Corners 59<br />

23. Four Corners 345/500 Qualified 63<br />

24. PG&E - Sierra 66<br />

25. PacifiCorp/PG&E 69<br />

26. Northern - Southern California 72<br />

27. Intermountain Power Project 75<br />

28. Intermountain - Mona 345 kV 78<br />

29. Intermountain - Gonder 230 kV 81<br />

30. TOT 1A 84<br />

31. TOT 2A 87<br />

32. Pavant - Gonder 230 kV Intermountain -<br />

Gonder 230 kV 90<br />

32. Pavant - Gonder 230 kV Intermountain -<br />

Gonder 230 kV 91<br />

33. Bonanza West 92<br />

34. 95<br />

35. TOT 2C 96<br />

36. TOT 3 98<br />

37. TOT 4A 102<br />

38. TOT 4B 106<br />

39. TOT 5 110<br />

40. TOT 7 113<br />

PART VI<br />

41. Sylmar to SCE 116<br />

42. IID - SCE 118<br />

43. North of San Onofre 120<br />

44. South of San Onofre 122<br />

45. SDG&E - CFE 124<br />

46. West of Colorado River (WOR) 127<br />

47. Southern New Mexico (NM1) 130<br />

48. Northern New Mexico (NM2) 133<br />

49. East of the Colorado River (EOR) 136<br />

50. Cholla - Pinnacle Peak 140<br />

51. Southern Navajo 143<br />

52. Silver Peak - Control 55 kV 147<br />

53. 149<br />

54. Coronado-Silver King 500 kV 150<br />

55. Brownlee East 152<br />

56. 155<br />

57. 156<br />

58. Eldorado - Mead 230 kV Lines 157<br />

59. WALC Blythe 161 kV Substation - SCE<br />

Blythe 161 kV Substation 159<br />

60. Inyo - Control 115 kV Tie 161<br />

61. Lugo - Victorville 500 kV Line 163<br />

62. Eldorado - McCullough 500 kV Line 165<br />

63. 167<br />

64. 168<br />

65. Pacific DC Intertie (PDCI) 169<br />

66. COI 173<br />

67. 176<br />

68. 177<br />

69. 178<br />

70. 179<br />

71. South of Allston 180<br />

72. 183<br />

73. North of John Day 184<br />

74. 187<br />

75. Hemingway – Summer Lake 188<br />

76. Alturas Project 191<br />

77. Crystal - Harry Allen 194<br />

78. TOT 2B1 196<br />

79. TOT 2B2 198<br />

80. Montana Southeast 200<br />

81. Centennial 202<br />

82. TotBeast 205<br />

Phase III Projects 208<br />

III-1. Devers-Palo Verde #2 209<br />

Item 1- vi

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!